k RE0G14
UNITED STATES
o5
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA STREET, N.W.
ATLANTA, GEORGIA 30303
4P*
MAR 2 3 1979
In Reply Refer To:
RII:GRJ
50-261/79-5
Carolina Power and Light Company
ATTN:
Mr. J. A. Jones
Executive Vice President and
Chief Operating Officer
411 Fayetteville Street
Raleigh, N C 27602
Gentlemen:
This refers to the inspection conducted by G. R. Jenkins of this office on
February 26 - March 2, 1979, of activities authorized by NRC Operating License
No. DPR-23 for the H. B. Robinson 2 facility, and to the discussion of our
findings held with D. S. Crocker at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously identified
enforcement matters.
These are discussed in the enclosed inspection report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. This item and
references to pertinent requirements are listed in the Notice of Violation
enclosed herewith as Appendix A. This notice is sent to you pursuant to the
provisions of Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10,
Code of Federal Regulations. Section 2.201 requires you to submit to this
office, within 20 days of your receipt of this notice, a written statement or
explanation in reply including:
(1) corrective steps which have been taken
by you and the results achieved; (2) corrective steps which will be taken to
avoid further noncompliance; and (3) the date when full compliance will be
achieved.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
790 5 2 3 061,0C
MAR 2 3 1979
Carolina Power and Light
-2
Company
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure. Any
such application must include a full statement of the reasons on the basis of
which it is claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is contained in
a separate part of the document. If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
VJ. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
W
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-261/79-5
cc w/encl:
R. B. Starkey, Plant Manager
P. 0. Box 790
Hartsville, S. C. 29550