ML14175B010
| ML14175B010 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 11/22/1978 |
| From: | Long F NRC/IE, NRC/RGN-II |
| To: | Jackie Jones Carolina Power & Light Co |
| Shared Package | |
| ML14175B011 | List: |
| References | |
| NUDOCS 7901030038 | |
| Download: ML14175B010 (2) | |
See also: IR 05000261/1978026
Text
Pvk
REG&
UNITED STATES
NUCLEAR REGULATORY COMMISSION
' oREGION
II
101 MARIETTA STREET, N.W.
ATLANTA, GEORGIA 30303
NOV 2 2 1978
In Reply Refer To:
RII:TM
50-261/78-26
Carolina Power and Light Company
ATTN:
Mr. J. A. Jones
Executive Vice President
Engineering, Construction
and Operation
336 Fayetteville Street
Raleigh, North Carolina
27602
Gentlemen:
This refers to the inspection conducted by Mr. T. J. McHenry of this office
on October 31 - November 3, 1978, of activities authorized by NRC Operating
License No.
DPR-23 for the H. B. Robinson facility, and to the discussion
of our findings held with Mr. R. B. Starkey at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examinations of procedures and representative records, inter
views with personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If
this report contains any information that you (or your contractor) believe
to be proprietary,
it
is necessary that you make a written application
within 20 days to this office to withhold such information from public
disclosure. Any such application must include a full statement of the
reasons on the basis of which it
is claimed that the information is proprie
tary, and should be prepared so that proprietary information identified in
the application is contained in a separate part of the document. If we do
not hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
79
01
0;
o
3 S
NOV 2 2 1978
Carolina Power and Light Company
-2
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
F. J. Long, Chief
Reactor Operations and
Nuclear Support Branch
Enclosure:
Inspection Report No.
50-261/78-26
cc w/encl:
Mr. R. B. Starkey, Plant Manager
P. 0. Box 790
Hartsville, South Carolina
29550