Text

j

REG4

UNITED STATES

NUCLEAR REGULATORY COMMISSION

oo

REGION II

101 MARIETTA STREET, N.W.

_;r

ATLANTA, GEORGIA 30303

In Reply Refer To:

OCT 1 1 1978

RII:DJP

50-261/78-18

Carolina Power and Light Company

ATTN:

Mr. J. A. Jones

Executive Vice President

Engineering, Construction

and Operation

336 Fayetteville Street

Raleigh, North Carolina

27602

Gentlemen:

This refers to the inspection conducted by Mr. D. J. Perrotti of this office

on August 7-11, 1978, of activities authorized by NRC Operating License No.

DPR-23 for the H. B. Robinson Unit 2 facility, and to the discussion of our

findings held with Mr. C. W. Crawford at the conclusion of the inspection.

.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items.

The status of these items is

discussed in the enclosed report.

Four new unresolved items resulted from this inspection and are discussed in

the enclosed report. These items will be examined during subsequent inspections.

During the inspection it was found that certain activities under your license

appear to deviate from commitments to the Commission, and have safety signifi

cance. This item is identified in the Notice of Deviation enclosed herewith

as Appendix A. Please provide us in writing within 20 days of your receipt

of this letter your comments including a description of corrective actions

that have been or will be taken, corrective actions which will be taken to

avoid further deviations, and the date corrective actions were or will be

completed.

7 B-12

OO0 cz

OCT I 1 1978

Carolina Power and Light Company

-2

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure. Any

such application must include a full statement of the reasons on the basis of

which it is claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is contained in

a separate part of the document.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

J. T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

Enclosures:

1. Appendix A

2. Inspection Report No.

50-261/78-18

cc:

Mr. R. B. Starkey, Plant Manager

P. 0. Box 790

Hartsville, South Carolina

29550