j
REG4
UNITED STATES
NUCLEAR REGULATORY COMMISSION
oo
REGION II
101 MARIETTA STREET, N.W.
_;r
ATLANTA, GEORGIA 30303
In Reply Refer To:
OCT 1 1 1978
RII:DJP
50-261/78-18
Carolina Power and Light Company
ATTN:
Mr. J. A. Jones
Executive Vice President
Engineering, Construction
and Operation
336 Fayetteville Street
Raleigh, North Carolina
27602
Gentlemen:
This refers to the inspection conducted by Mr. D. J. Perrotti of this office
on August 7-11, 1978, of activities authorized by NRC Operating License No.
DPR-23 for the H. B. Robinson Unit 2 facility, and to the discussion of our
findings held with Mr. C. W. Crawford at the conclusion of the inspection.
.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items.
The status of these items is
discussed in the enclosed report.
Four new unresolved items resulted from this inspection and are discussed in
the enclosed report. These items will be examined during subsequent inspections.
During the inspection it was found that certain activities under your license
appear to deviate from commitments to the Commission, and have safety signifi
cance. This item is identified in the Notice of Deviation enclosed herewith
as Appendix A. Please provide us in writing within 20 days of your receipt
of this letter your comments including a description of corrective actions
that have been or will be taken, corrective actions which will be taken to
avoid further deviations, and the date corrective actions were or will be
completed.
7 B-12
OO0 cz
OCT I 1 1978
Carolina Power and Light Company
-2
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure. Any
such application must include a full statement of the reasons on the basis of
which it is claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is contained in
a separate part of the document.
If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
J. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
1. Appendix A
2. Inspection Report No.
50-261/78-18
cc:
Mr. R. B. Starkey, Plant Manager
P. 0. Box 790
Hartsville, South Carolina
29550