Category:Letter
MONTHYEARML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports IR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20230032023-11-0606 November 2023 Integrated Inspection Report 05000334/2023003 and 05000412/2023003 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary IR 05000334/20234022023-09-29029 September 2023 Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000334/20234012023-09-21021 September 2023 Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) ML23263A0192023-09-20020 September 2023 Operator Licensing Examination Approval ML23243A9272023-09-19019 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000334/20230052023-08-31031 August 2023 Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000334/20230022023-08-0909 August 2023 Integrated Inspection Report 05000334/2023002 and 05000412/2023002 ML23219A0592023-08-0707 August 2023 Steam Generator Inspection Reports - Spring 2023 Spring Refueling Outrage L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 ML23188A0982023-07-17017 July 2023 Correction to the Safety Evaluation Issued Related to Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23188A0672023-07-10010 July 2023 Project Manager Assignment L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report ML23157A1072023-06-0707 June 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000334/2023011 and 05000412/2023011 ML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23135A7872023-05-19019 May 2023 Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report ML23124A3882023-05-16016 May 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Technical Specification 5.6.3, Core Operating Limits Reports (COLR) and TS 4.2.1 Fuel Assemblies ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000334/20230012023-05-0808 May 2023 Integrated Inspection Report 05000334/2023001 and 05000412/2023001 L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23118A3812023-04-28028 April 2023 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23107A2502023-04-18018 April 2023 Requalification Program Inspection 2024-01-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 17, 2014 Mr. Eric A. Larson, Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY POWER STATION UNITS 1 AND 2- RELAXATION OF RESPONSE DUE DATE REGARDING FLOODING HAZARD REEVALUATIONS FOR RECOMMENDATION 2.1 OF THE NEAR-TERM TASK FORCE REVIEW OF THE INSIGHTS FROM THE FUKUSHIMA DAI-ICHI ACCIDENT (TAC NOS.
MF3589 AND MF3590)
Dear Mr. Larson:
By letter dated March 12, 2012, 1 the U.S. Nuclear Regulatory Commission (NRC) issued a request for information pursuant to Title 10 of the Code of Federal Regulations, Section 50.54(f)
(henceforth referred to as the 50.54(f) letter). The NRC issued the request as a part of implementing lessons-learned from the accident at the Fukushima Dai-ichi nuclear power plant.
Enclosure 2 to the 50.54(f) letter requested licensees to perform a reevaluation of all external flooding hazards using present-day guidance and methodologies.
By letter dated May 11, 2012, 2 the NRC issued a prioritization of due dates for responses from all sites. The flooding hazard reevaluation report (FHRR) was due on March 12, 2014, for Beaver Valley Power Station (BVPS) Units 1 and 2.
By letter dated December 17, 2013, 3 FirstEnergy Nuclear Operating Company (FENOC, the licensee) requested NRC assistance in obtaining the U.S. Army Corps of Engineers (USAGE) analysis of dams that could impact the flood levels at the BVPS site. By letter dated March 11, 2014, 4 FENOC requested a delay in submittal of the FHRR for BVPS Units 1 and 2 to within 6 months of receiving the USAGE final analysis. The reason for this request is that the USAGE analysis is necessary to complete the flooding hazard reevaluation (FHR) and 6 months is necessary to incorporate the results.
The 50.54(f) letter is available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML12053A340.
2 The prioritization letter is available in ADAMS under Accession No. ML12097A509.
3 The request for assistance in obtaining USAGE analysis is available in ADAMS under Accession No. ML13353A566.
4 The extension request from FENOC is available in ADAMS under Accession No. ML14070A371.
E. Larson The NRC reviewed the justification provided by the licensee and considered the following factors when reviewing the new schedule:
- As stated in the March 11, 2014, letter, FENOC noted that an updated analysis modeled the BVPS site configuration from April 2012 and the current design basis for the local intense precipitation event. This analysis verified that the combination of site configuration changes since the original analyses have not adversely affected the current design basis. In addition, FENOC has completed walkdowns of the BVPS site and verified that existing flood barriers and protection features comply with current BVPS flooding licensing basis. The BVPS current licensing basis is met.
- As stated in the NRC's interim staff guidance (ISG) JLD-ISG-2013-01, "Guidance for Assessment of Flooding Hazards Due to Dam Failure," dated July 29, 2013, 5 evaluating flooding hazards for nuclear power plants needs to include consideration of floods resulting from dam failures. The FHR for BVPS Units 1 and 2 needs to consider dams that are operated by various government agencies including the USAGE. The NRC has entered into an interagency agreement with the USAGE to provide the necessary information for FENOC. Therefore, the FHRR for BVPS Units 1 and 2 cannot be completed until the NRC provides the analysis of the USAGE dams to the licensee.
- As stated in the NRC's letter dated March 1, 2013, 6 "incomplete hazard reports that only contain an analysis of some flooding hazard mechanisms would not be of substantive benefit for staff and would not be acceptable." Therefore, the licensee must incorporate the information requested from the USAGE before a FHRR can be acceptably submitted to the NRC in compliance with the request in the 50.54(f) letter.
- In the March 11, 2014, extension request FENOC provided a rationale for the extension. By letter dated April 24, 2014/ in response to an NRC request for additional information FENOC provided a Gantt chart that included a detailed timeline for integrating various aspects of the FHR. This Gantt chart was discussed with FENOC in a public meeting held on June 6, 2014. 8 The Gantt chart provides a detailed schedule and milestones to be completed in order for FENOC to provide a FHRR 6 months after receiving the USAGE results.
Given these considerations, the NRC considers the revised schedule proposed by FENOC to be acceptable. Accordingly, and based upon the authority granted to the Director, Office of Nuclear Reactor Regulation, the revised required response date for submitting the FHRR for BVPS Units 1 and 2 is 6 months after FENOC receives the USAGE final analysis. The NRC will 5
JLD-ISG-2013-01 is available in ADAMS under Accession No. ML13151A153.
6 NRC's March 1, 2013, letter is available in ADAMS under Accession No. ML13044A561.
7 The April24, 2014, request for additional information response is available in ADAMS under Accession No. ML14115A156.
8 The notice for the June 6, 2014, meeting can be found in ADAMS under Accession No. ML14148A490.
E. Larson include the date when the BVPS Units 1 and 2 FHRR is due when the requested USAGE information is transmitted to the licensee. The transmittal letter will also note that if the USAGE analysis results in a higher flood hazard relative to the design basis, the NRC staff will request that within 60 days of receipt of the USAGE analysis FENOC provide interim actions it will take or plans to take to address the higher flooding hazard.
If you have any questions regarding this matter, or if it is necessary to revise the submittal schedule, please contact your NRC project manager, Jeffrey Whited, at (301) 415-4090 or by e-mail at Jeffrey.Whited@nrc.gov.
Sincerely, Daniel H. Dorman, Acting Director Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: Listserv
E. Larson include the date when the BVPS Units 1 and 2 FHRR is due when the requested USACE information is transmitted to the licensee. The transmittal letter will also note that if the USACE analysis results in a higher flood hazard relative to the design basis, the NRC staff will request that within 60 days of receipt of the USACE analysis FENOC provide interim actions it will take or plans to take to address the higher flooding hazard.
If you have any questions regarding this matter, or if it is necessary to revise the submittal schedule, please contact your NRC project manager, Jeffrey Whited, at (301) 415-4090 or by e-mail at Jeffrey.Whited@nrc.gov.
Sincerely, IRA/
Daniel H. Dorman, Acting Director Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: Listserv DISTRIBUTION:
PUBLIC RidsNrrDorllpl1-2 Resource MMitchell, NRR JLD R/F RidsNrrPMBeaverValley Resource DSkeen, JLD RidsAcrsAcnw_MaiiCTR Resource RidsNrrLASLent Resource EMiller, DORL RidsNrrOd Resource RidsRgn1 MaiiCenter Resource RTaylor, DSS RidsNrrDorl Resource RKuntz, JLD ADAMS A ccesston N0. ML14171A461 *vta
. emat"I **P revtousty concurre d OFFICE NRR!JLD/JHMB/PM NRRIJLD/JHMB/LA** NRR!DORULPL 1-2/PM* NRR/JLD/JHMB/BC DSEA/RHM1/BC*
NAME JSebrosky SLent JWhitted MMitchell CCook (KErwin for)
DATE 07/17/14 06/20/14 07/08/14 07/02/14 06/30/14 OFFICE DSEA/RHM2/BC* OGC NLO** NRRIJLD/D NRR/D NAME RKaras BHarris OS keen DOorman DATE 06/27/14 06/27/14 07/03/14 07/17/14 OFFICIAL RECORD COPY