O UNITED STATES 0A NUCLEAR REGULATORY COMMISSION REGION 1l 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 In Reply Refer To:
SEP 2 61979 RII:JPO 50-325, 50-324 50-400, 50-401 50-402, 50-403 50-261 Carolina Power and Light Company Attn:
J. A. Jones Senior Executive Vice President and Chief Operating Officer 411 Fayetteville Street Raleigh, North Carolina 27602 Gentlemen:
The enclosed Information Notice provides information with regard to failures of lube oil coolers for emergency diesel generators.
Sincerely, James P. O'Reilly Director
Enclosures:
- 1.
- 2.
List of IE Information Notices Issued in the Last Six Months 7910040 /61 K P~
SEP 2 6 1979 Carolina Power and Light Company
-2 cc w/encl:
A. C. Tollison, Jr.
Plant Manager Box 458 Southport, North Carolina 28461 R. Parsons, Site Manager Post Office Box 101 New Hill, North Carolina 27562 R. B. Starkey, Jr., Plant Manager Post Office Box 790 Hartsville, South Carolina 29550
Accession No:
7908220121 SSINS:
6870 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 September 26, 1979 IE Information Notice No. 79-23 EMERGENCY DIESEL GENERATOR LUBE OIL COOLERS Within a two week time span (August 27 to September 11, 1979), the tube sheets failed in the Arkansas Nuclear One (ANO) Unit 1 lube oil coolers for both of the Unit 1 Emergency Diesel Generators. The introduction of water into the diesel lube oil system resulted in trips of both diesels during surveillance testing. The diesels were not considered capable of sustained operation.
Investigation by the licensee has indicated cracks around the outer periphery of the tube sheets. The exact failure mode has not been assessed; however, the licensee has replaced the Emergency Diesel lube oil coolers for both diesels with a cooler of different design. The original lube oil coolers had tube sheets which were one-eighth (1/8) inch in thickness and the tubes were soldered in place.
Epoxy was also used as a sealer on the tube (water side) of the lube oil cooler.
The new coolers have one-half (1/2) inch tube sheets and the tubes are rolled.
The ANO, Unit 1 Emergency Diesel Generators were purchased in 1970 and were manufactured by the Electromotive Division of General Motors Corporation. The lube oil coolers (Model Number D-191700) were manufactured by Young Radiator Corporation.
This information is provided as an early notification of a possible significant matter. It is expected that recipients will review the information for possible applicability to their facilities. No specific action or response is requested at this time.
If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions.
If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.
IE Information Notice No. 79-23 Enclosure September 26, 1979 Page 1 of 2 LISTING OF IE INFORMATION NOTICES ISSUED IN LAST SIX MONTHS Information Subject Date Issued To Notice No.
Issued 79-23 Emergency Diesel Generator 9/26/79 All Holders of CPs Lube Oil Coolers and OLs 79-22 Qualification of Control 9/17/79 All Holders of CPs Systems 9/14/79 All Holders of OLs 79-21 Transportation and Commer-9/11/79 All Licensees as Supple cial Burial of Radioactive mental Information to Materials IE Bulletin Nos. 79-19
& 79-20 79-20 NRC Enforcement Policy 9/7/79 All Holders of Reactor (Rev. 1)
NRC Licensed Individuals OLs and CPs and Production Licensees with Licensed Operators 79-20 NRC Enforcement Policy 8/14/79 All Holders of Reactor NRC Licensed Individuals OLs and CPs and Production Licensees with Licensed Operators 79-19 Pipe Cracks in Stagnant 7/18/79 All Holders of Reactor (Correction -
Borated Water Systems at OLs and CPs Enclosure)
PWR Plants 79-19 Pipe Cracks In Stagnant 7/17/79 All Holders of Reactor Borated Water Systems At OLs and CPs PWR Plants 79-18 Skylab Reentry 7/6/79 All Holders of Reactor OLs 79-17 Source Holder Assembly Damage 6/20/79 All Holders of Reactor Damage From Misfit Between OLs and CPs Assembly and Reactor Upper Grid Plate 79-16 Nuclear Incident at Three 6/22/79 All Research Reactors Mile Island and Test Reactors with OLs 79-15 Deficient Procedures 6/7/79 All Holders of Reactor OLs and CPs 79-14 NRC Position of Electrical 6/11/79 All Power Reactor Cable Support Systems Facilities with a CP
IE Information Notice No. 79-23 Enclosure September 26, 1979 Page 2 of 2 LISTING OF INFORMATION NOTICES ISSUED IN LAST SIX MONTHS Information Subject Date Issued To Notice No.
Issued 79-13 Indication of Low Water 5/29/79 All Holders of Reactor Level in the Oyster Creek OLs and CPs Reactor 79-12 Attempted Damage to New 5/10/79 All Fuel Facilities Fuel Assemblies Research Reactors, and Power Reactors with an OL or CP 79-11 Lower Reactor Vessel Head 5/7/79 All holders of Reactor Insulation Support Problem OLs and CPs 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a CP