Acceptance of Requested Licensing Action License Amendment Request to Revise Snubber Surveillance Requirements (Tac No. MF4124)
ML14149A075
Person / Time
Site: Oyster Creek
Issue date: 06/16/2014
From: John Lamb
Plant Licensing Branch 1
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Lamb J, NRR/DORL/LPLI-2
References
TAC MF4124
Download: ML14149A075 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 16, 2014 Mr. Michael J. Pacilio President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

OYSTER CREEK NUCLEAR GENERATING STATION -ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO REVISE SNUBBER SUREVEILLANCE REQUIRMENTS (TAC NO. MF4124)

Dear Mr. Pacilio:

By letter dated April 30, 2014, (Agencywide Documents Access and Management System Accession No. ML14127A435), Exelon Generation Company, LLC requested an amendment to the technical specification (TS), Appendix A of Renewed Facility Operating License No.

DPR-16, for Oyster Creek Nuclear Generating Station (OCNGS). The proposed amendment would revise OCNGS snubber surveillance requirements contained in TS 4.5 M., "Shock Suppressors (Snubbers)."

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (1 0 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence.

M. Pacilio If you have any questions, please contact me at (301) 415-31 00 or via e-mail at John.Lamb@nrc.gov.

. Lamb, Senior Project Manager Pia Licensing Branch 1-2 Div* ion of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-219 cc: Distribution via Listserv

ML14149A075 OFFICE LPL 1-2/PM LPL 1-2/PM LPL 1-2/LA LPL 1-2/BC LPL 1-2/PM NAME RGiadne}' Jlamb ABaxter MKhanna JLamb DATE 05/28/2014 05/30/14 06/11/14 6/16/2014 6/16/2014