June 24, 1982 Docket No. 50-206 LS05-82k06-090 Mr. R. Dietch, Vice President Nuclear Engineering and Operations Southern California Edison Company 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770
Dear Mr. Dietch:
SUBJECT:
SYSTEMATIC EVALUATION PROGRAM TOPIC III-4.B, TURBINE MISSILES SAN ONOFRE UNIT 1 Enclosed is a copy of our draft evaluation of Systematic Evaluation Program Topic III-4.83 for the San Onofre Unit No. 1 Nuclear Generating Station.
You are requested to'examine the facts upon which the staff has based its evaluation and respond either by confirming that the facts are correct, or by identifying errors and supplying the corrected information. We encourage you to supply any other material that might affect the staff's evaluation of this topic or be significant in the integrated assessment of your facility.
Your response is requestdd within 30 days of receipt of this letter. If no response is received within that time, we will assume that you have no comments or corrections and will consider the topic complete.
Sincerely, Walt Paulson,,Project Manager Operating Reactors Branch No. 5 Division of Licensing
Enclosure:
As stated cc w/enclosure:
See next page 0
8206300172 820624 PDR ADOCK 05000206 I
P _
)
- See previous yellow for additio al concurr nces.
SEPB:DL SEPB:DL SEPB:DL OR PM ORB#5:BC AOA:DL OFFICE" EMtKllardCGrimeLs*..... -WRussel aiylson 1#O.rt.hfi eld......as SURNAMEI 1Y8 2'72.
DURATE NRCOR318108R240 OFF228KI COPY USGPO: 1981-335-9 NRQ FORM 318 (10-80) NRCM 0240.
OFFICIAL RECORD COPY USGPO: 1981 335-960
Docket No. 50-206 LSO5-82 Mr. R..Dietch, Vice President Nuclear Engineering and Operations Southern California Edison Company 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770
Dear Mr. Dietch:
SUBJECT:
SYSTEMATIC EVALUATION PROGRAM TOPIC III-4.B, TURBINE MISSILES SAN ONOFRE UNIT NO. 1 Enclosed is a copy ojf dur draft evaluation of Systematic Evaluation Program Topic III-4.B for the San Onofre Unit No. 1 Nuclear Generating Station.
You are requqsted to examine the facts-upon which the staff has based its evaluation and respond either by confirming that the facts are correct, or by identifying errors and supplying the corrected information.- We encourage you to supply any other material that might affect the staff's evaluation of this topic or be significant in the integrated assessment of your facility.
Your response is requested as soon as possible. If no response is received by the time the next phase of the integrated assessment of your facility begins, we will assume that you have no comments or corrections and will consider the topic complete.
Sincerely, Walt Paulson, Project Manager Operating Reactors Branch No. 5 Division of Licensing
Enclosure:
As stated cc w/enclosure:
See next page
- U'(
bIbPB:
I UbP:
UL U
M URB#b:BiL XAU:SA:UL 0.FFICE)..
.fridk ~CGrTm e....WRuS E T11 WPuT oi".DCrutchfed GL.a..nas SURNAME 8 2.6
/2 6/.8..
- 8.
DATE NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981-335-960
cc Charles R. KQcher, Assistant General Counsel James Beoletto, Esquire Southern California Edison Company
-Post Office Box 800 Rosemead, California 91770 David R. Pigott Orrick, Herrington & Sutcliffe 600 Montgomery Street San Francisco, California 94111 Harry B. Stoehr San Diego Gas & Electric Company P. 0. Box 1831
.San Diego, California 92112 Resident Inspector/San Onofre NPS c/o U. S. NRC P. 0. Box 4329 San Clemente, California 92672 Mayor City of San Clemente San Clemente, California 92672 Chairman Board of Supervisors County of San Diego San Diego, California 92101 California Department of Health ATTN:
Chief, Environmental Radiation Control Unit Radioloccal Health Section 714 P Street, Room 498 Sacramento, California 95814 U. S. Environmental Protection Agency Region IX Office ATTN:
Regional Radiation Representative 215 Freemont Street San Francisco, California 94111 Robert H. Engelken, Regional Administrator Nuclear Regulatory Commission, Region V 1450 Maria Lane Walnutw Creek, California 94596
SYSTEMATIC EVALUATION PROGRAM TOPIC III-4.B SAN ONOFRE TOPIC III-4.B, TURBINE MISSILES I.
INTRODUCTION The purpose of this topic is to assure that, with respect to potential turbine missiles, 1,11 structures, systems and components important to safety either have adequate protection by means of structural barriers or have an acceptably low probability of damage.
II. REVIEW CRITERIA 10 CFR 50, Appendix A, GDC 4.
III.
RELATED SAFETY TOPICS AND INTERFACES III-4.C Internally Generated Missiles.
IV. REVIEW GUIDELINES Standard Review Plan (SRP) Section 3.5.1.3, Regulatory Guides (R. G.)
1.115 and 1.117.
V.
EVALUATION During November 1979, the NRC staff became aware of low pressure turbine disc cracking in Westinghouse turbines at several operating plants.
Additional inspections at other plants possessing Westinghouse turbines
,also indicated cracking thus implying a generic problem applicable.to plants.with Westinghouse turbines, Consequently, on February 25, 1980, the NRC issued 50.54(f) letters to utilities with Westinghouse low pressure turbines requesting information related to this problem. Both Westinghouse. and the NRC staff have been following this problem closely and have developed independent crack growth models.
The findings of multt-plant action, B-46, "Turbine Missiles," concluded that an inspection schedule based on an approach developed by Westing house for their turbines provides an acceptably high degree of assurance that discs will be inspected before cracks can grow to one-half of a size that could cause disc failure at speeds up to design speed.
Southern California Edison (SCE) was provided with a safety evaluation report of this approach and was requested to commit to use the four criteria listed on page 3 of the safety evaluation report (Reference 1).
SCE responded to this request (Reference 2) and committed to the use of the four criteria. As a result of this commitment, an acceptably high degree of assurance is provided that disc failures at design speed will not occur.
-2 As a result of the turbine cracking problem, Westinghouse has revised its probability analysis of damage to safety related structures, systems and components. The analysis includes utilizing the following individual probabilities: (1) the probablity of turbine failure -leading to the ejection of turbine missiles due to design speed failures and destructive overspeed failures (Pl)., (2) the probability of strike (P2) and (3) the probability of damage (P3).
Since the evaluation of the latest Westinghouse probability analyses has not been completed by the'staff, criteria, considering turbine cracking and the implemented inservice inspection program, have not been established for determining what actions, if any, are required.
Two independent turbine overspeed.trip devices are installed on the turbine generator.
- 1. A standard mechanical overspeed trip, consisting of an offset trip weight held by a compression spring, is intalledon the turbine.
Centrifugal force acting on the shaft 'Mounted trip weight is opposed by the compression spring. At high shaft speed, the centrifugal force bcomes large enough to overcome the spring force and the trip weight moves out, activating a mechanical linkage that dumps auto stop oil and trips the unit.
- 2. A backup overspeed trip device is also installed that senses generator output frequency. At a preselected value, this device initiates a turbine trip by energizing the solenoid trip device. The solenoid trip is an electrical device that acts on an operating plate lever causing the turbine to be shutdown when the solenoid-is actuated.
The generator and 18 kV electrical system are also isolated at the same time the turbine is tripped by the backup overspeed device..
The solenoid trip is also energized by'a load drop anticipator unit.
This device compares unit electrical load and-low pressure turbine steam flow. It energizes the solenoid trip when low pressure turbine steam flow is in excess of 50 percent of the full load value in coin cidence with a unit electrical load of 20 percent or less.
When the turbine is tripped, control oil, as well as auto stop oil, is dumped by activation of six solenoid valves installed.on the control oil system. These valves were not part of the original turbine control and protection system and provide an additional degree of redundancy for turbine protection.
The initial design overspeed for the San Onofre 1 turbine-generator was 127% of nominal rotating speed. Since the turbine-generator does not have reheat intercept-or stop valves, this design speed is higher than for other Westinghouse units.
-3 Following two incidents of turbine overspeed in 1971, the design basis for the turbine overspeed was changed. The unit operates at full capacity with specific limits on reheater tube leakage, condenser back pressure and overspeed trip setpoints to limit overspeed to 133% of nominal assuming failure of the turbine control system and turbine trip due to operation of the mechanical overspeed trip device.
In Reference 3, the licensee performed a comoarison of thd tirbine overspeed protection system with the requirements of IEEE-279 (1971).
The conclusions were that they system satisfied the redundancy, indepen dence, separation And single failure provisions.
A testing program is performed for the overspeed protection system.
The following tests are done yearly when the turbine is off line.
- 1. Overspeed governor oil trip
- 2. Governor and auxiliary governor tests
- 3. Backup overspeed trip device
- 4. Mechanical overspeed
- 5.
Solenoid trip test
- 6.
Control valve leakage
- 7.
No load trip test The extraction steam BTV is tested each shift. The overspeed governor oil trip is tested monthly.
Every two week, while the plant is operating, power is reduced and each control and stop valve combination is exercised.
VI.
CONCLUSION The inspection program committed to by Southern California Edison (References 1 and 2) provides an acceptably high degree of assurance that turbine discs ill not fail at speeds up to design speed. The testing program of the overspeed protection system, including the stop and control valves at San Onofre 1, provides reasonable assurance that the overspeed protection system will remain operable and, thereby, limit the likelihood that overspeed past the design conditions would occur.
The staff concludes, for an interim period until a decision is reached regarding the need for updated probabilistic analysis of the turbine missile hazard, the probability of damage from turbine missiles is acceptably low. Should further reviews of operating plants and/or additional requirments be deemed necessary, the San Onofre 1 plant will be included with-t.hat operating plant action.
-4 REFERENCES
- 1. Letter from D. Crutchfield (NRC) to R. Dietch (SCE), dated December 10, 1981.
- 2. Letter from K. Baskin (SCE) to D.. Crutchfield (NRC), dated March 24, 1982.
- 3. San Onofre Nuclear Generating Station Unit No. 1, Fioal Safaty-Analysis, Part II, Volume VI, Supplementary Information, Item 4.2 of Responses to Specific Items of Interest.