ML14126A009

From kanterella
Jump to navigation Jump to search
TRM2 - Technical Requirements Manual, Unit 2
ML14126A009
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 04/29/2014
From: Gerlach R
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2014-19653
Download: ML14126A009 (41)


Text

Apr. 30, 2014 Page 1

of 3

MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2014-19653 USER INFORMATION:

GERLACH*ROSEY M EMPL#:028401 CA#:

0363 Address: NUCSA2 Phone#:

254-3194 TPANMMTTTAT, TMFC)RMATTCnm TO:

GERLACH*ROSEY M 04/30/2014 LOCATION:

USNRC FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.

HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.

WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.

TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION:

"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRM2 -

TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 04/11/2014 ADD MANUAL TABLE OF CONTENTS DATE: 04/29/2014 CATEGORY:

DOCUMENTS TYPE: TRM2 4o!c

Apr.

30, 2014 Page 2

of 3

ID:

TEXT 3.3.6 ADD:

REV:

4 REMOVE:

REV:3 CATEGORY:

DOCUMENTS TYPE: TRM2 ID:

TEXT 3.6.2 ADD:

REV: 2 REMOVE:

REV:1 CATEGORY:

DOCUMENTS TYPE: TRM2 ID:

TEXT 3.7.10 REMOVE:

REV:1 ADD:

REV:

2 CATEGORY:

DOCUMENTS TYPE: TRM2 ID:

TEXT B3.1.1

  • ADD:

REV:

2 REMOVE:

REV:1 CATEGORY:

DOCUMENTS TYPE: TRM2 ID:

TEXT B3.7.3.4 REMOVE:

REV:1 ADD:

REV:

2 CATEGORY:

DOCUMENTS TYPE: TRM2 ID:

TEXT LOES REMOVE:

REV:82 ADD:

REV:

83

Apr. 30, 2014 Page 3

of 3

ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.

UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.

FOR ELECTRONIC MANUAL

USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL~

Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:

0 Procedure Name TEXT LOES

Title:

LIST OF EFl 4/29/2014

_CON TROLLED Issue Date Change ID Change Nuwber 04/29/2014 Rev 83 FECTIVE SECTIONS TEXT TOC

Title:

TEXT 1.1

Title:

TEXT 2.1

Title:

TEXT 2.2

Title:

22 10/09/2012 TABLE OF CONTENTS 0

11/19/2002 USE AND APPLICATION DEFINITIONS 1

02/04/2005 PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS 11 01/31/2014 PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 5

06/20/2012

Title:

APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO)

APPLICABILITY TEXT 3.1.1 1

11/09/2007

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)

INSTRUMENTATION TEXT 3.1.2 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)

HOUSING SUPPORT TEXT 3.1.3 4

05/14/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 i0 04/25/2013

Title:

CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)

Page 1 of 15 Report Date: 04/30/14 Page 1 of 15 Report Date: 04/30/14

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0

11/19/2002

Title:

INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3

03/31/2011

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3 2

11/09/2007

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 6

07/09/2010

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0

11/19/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6 4

04/29/2014

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1

11/09/2007

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1

10/22/2003

Title:

INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3

05/14/2009

Title:

INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10 1

12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11 1

10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0

04/16/2009

Title:

WATER MONITORING INSTRUMENTATION Page 2 of 15 Report Date: 04/30/14 Page 2 of

.15 Report Date: 04/30/14

SSES MANJA-L Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1

Title:

REACTOR TEXT 3.4.2

Title:

REACTOR TEXT 3.4.3

Title:

REACTOR TEXT 3.4.4

Title:

REACTOR TEXT 3.4.5

Title:

REACTOR TEXT 3.4.6

Title:

REACTOR TEXT 3.5.1 1

04/26/2006 COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 1

04/16/2009 COOLANT SYSTEM STRUCTURAL INTEGRITY 1

11/09/2007 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) 2 05/14/2009 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1

04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1

04/25/2013 RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION 1

02/04/2005

Title:

ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1

11/09/2007

Title:

ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0

11/19/2002

Title:

ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0

11/19/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 2

04/29/2014

Title:

SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0

11/19/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page ~.

of 15 Report Date: 04/30/14 Page 3 of 15 Report Date: 04/30/14

SSES MANUTAL~

Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0

11/19/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1

Title:

PLANT TEXT 3.7.2

Title:

PLANT TEXT 3.7.3.1

Title:

PLANT TEXT 3.7.3.2

Title:

PLANT TEXT 3.7.3.3

Title:

PLANT TEXT 3.7.3.4

Title:

PLANT TEXT 3.7.3.5

Title:

PLANT TEXT 3.7.3.6

Title:

PLANT TEXT 3.7.3.7

Title:

PLANT TEXT 3.7.3.8

Title:

PLANT TEXT 3.7.4

Title:

PLANT 0

11/19/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)

SHUTDOWN 0

11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)

AND GROUND WATER LEVEL 2

04/16/2009 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 3

04/16/2009 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 3

SYSTEMS C02 SYSTEMS 2

SYSTEMS HALON SYSTEMS 04/16/2009 04/16/2009 2

04/16/2009 SYSTEMS FIRE HOSE STATIONS 2

04/16/2009 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1

04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES 11 09/27/2012 SYSTEMS FIRE DETECTION INSTRUMENTATION 1

04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM Page 4 of 15 Report Date: 04/30/14 Page 4 of

.15 Report Date: 04/30/14

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1

Title:

PLANT TEXT 3.7.5.2

Title:

PLANT 0

11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0

11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3

Title:

PLANT SYSTEMS 1

04/26/2006 LIQUID HOLDUP TANKS TEXT 3. 7. 6

Title:

PLANT 3

06/04/2012 SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3. 7. 7 2

09/05/2008

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 8

09/13/2012

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1

08/28/2006

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 2

04/29/2014

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7.11

Title:

PLANT SYSTEMS 1

10/02/2009 TEXT 3.8.1 3

06/20/2012

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2

11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT 3.8.2.2 2

12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD PROTECTION -

AUTOMATIC Page 5 of

.15 Report Date: 04/30/14

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.3

Title:

ELECTRICAL TEXT 3.8.4

Title:

ELECTRICAL TEXT 3.8.5

Title:

ELECTRICAL TEXT 3.8.6

Title:

ELECTRICAL TEXT 3.8.7 2

06/20/2012 POWER DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES 1

02/04/2005 POWER 24 VDC ELECTRICAL SUBSYSTEM 1

11/14/2013 POWER DEGRADED VOLTAGE PROTECTION 2

12/14/2006 POWER EMERGENCY SWITCHGEAR ROOM COOLING 2

10/22/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0

11/19/2002

Title:

REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0

11/19/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0

11/19/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1

04/26/2006

Title:

MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1

04/09/2007

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2

06/15/2010

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.11.1.1 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION Page ~

of 15 Report Date: 04/30/14 Page 6 of

.15 Report Date: 04/30/14

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.2

Title:

RADIOACTIVE TEXT 3.11.1.3

Title:

RADIOACTIVE TEXT 3.11.1.4

Title:

RADIOACTIVE TEXT 3.11.1.5

Title:

RADIOACTIVE TEXT 3.11.2.1

Title:

RADIOACTIVE TEXT 3.11.2.2

Title:

RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1

04/26/2006 LIQUID EFFLUENTS DOSE 1

04/26/2006 LIQUID WASTE TREATMENT SYSTEM 2

10/09/2012 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2

05/02/2007 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3

04/26/2006 DOSE RATE 1

04/26/2006 DOSE -

NOBLE GASES 1

04/26/2006 DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE 0

11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM 4

07/03/2013 VENTILATION EXHAUST TREATMENT SYSTEM 4

09/16/2009 RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION 1

04/26/2006 TOTAL DOSE 3

04/26/2006 MONITORING PROGRAM TEXT 3.11

Title:

.2.3 RADIOACTIVE FORM EFFLUENTS TEXT 3.11.2.4

Title:

RADIOACTIVE TEXT 3.11.2.5

Title:

RADIOACTIVE TEXT 3.11.2.6

Title:

RADIOACTIVE TEXT 3.11.3

Title:

RADIOACTIVE TEXT 3.11.4.1

Title:

RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS Page 7 of 15 Report Date: 04/30/14 Page 7 of 15 Report Date: 04/30/14

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.2 2

04/26/2006

Title:

RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3 1

04/26/2006

Title:

RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0

11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4

04/17/2008

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0

11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4. 1

Title:

TEXT 4. 2

Title:

TEXT 4.3

Title:

TEXT 4.4

Title:

TEXT 4. 5

Title:

TEXT 4. 6

Title:

TEXT 4. 7

Title:

ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0

CONTROLS 0

CONTROLS 0

CONTROLS 1

CONTROLS 0

CONTROLS 0

CONTROLS 0

CONTROLS 09/27/2003 ORGANIZATION 09/27/2003 REPORTABLE EVENT ACTION 09/27/2003 SAFETY LIMIT VIOLATION 12/18/2008 PROCEDURES & PROGRAMS 09/27/2003 REPORTING REQUIREMENTS 09/27/2003 RADIATION PROTECTION PROGRAM 09/27/2003 TRAINING Page 1 of 15 Report Date: 04/30/14 Page 8 of 15 Report Date: 04/30/14

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 5

06/20/2012

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)

APPLICABILITY TEXT B3.1.1 2

04/29/2014

Title:

REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)

INSTRUMENTATION TEXT B3.1.2 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD)

HOUSING SUPPORT TEXT B3.1.3 3

04/10/2007

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0

11/19/2002

Title:

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0

11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1

Title:

INSTRUMENTATION TEXT B3.3.2

Title:

INSTRUMENTATION TEXT B3.3.3

Title:

INSTRUMENTATION TEXT B3.3.4

Title:

INSTRUMENTATION TEXT B3.3.5

Title:

INSTRUMENTATION 1

01/31/2014 BASES RADIATION MONITORING INSTRUMENTATION 2

03/31/2011 BASES SEISMIC MONITORING INSTRUMENTATION 2

11/09/2007 BASES METEOROLOGICAL MONITORING INSTRUMENTATION 4

07/09/2010 BASES TRM POST ACCIDENT MONITORING (PAM)

INSTRUMENTATION 2

11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6

Title:

INSTRUMENTATION BASES 5

01/31/2014 TRM ISOLATION ACTUATION INSTRUMENTATION Page 9 of 15 Report Date: 04/30/14 Page 9 of

.15 Report Date: 04/30/14

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.7

Title:

INSTRUMENTATION TEXT B3.3.8

Title:

INSTRUMENTATION TEXT B3.3.9

Title:

INSTRUMENTATION TEXT B3.3.10

Title:

INSTRUMENTATION TEXT B3.3.11

Title:

INSTRUMENTATION 1

11/09/2007 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1

10/22/2003 BASES TRM RPS INSTRUMENTATION 3

05/14/2009 BASES LPRM UPSCALE ALARM INSTRUMENTATION 3

02/22/2012 BASES REACTOR RECIRCULATION PUMP MG 1

10/22/2003 BASES MVP ISOLATION INSTRUMENTATION SET STOPS TEXT B3.3.12 0

04/16/2009

Title:

WATER MONITORING INSTRUMENTATION TEXT B3.4.1

Title:

REACTOR TEXT B3.4.2

Title:

REACTOR TEXT B3.4.3

Title:

REACTOR TEXT B3.4.4

Title:

REACTOR TEXT B3.4.5

Title:

REACTOR TEXT B3.4.6

Title:

REACTOR 0

11/19/2002 COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY 1

04/16/2009 COOLANT SYSTEM BASES STRUCTURAL INTEGRITY 1

11/09/2007 COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR 0

COOLANT SYSTEM BASES 0

COOLANT SYSTEM BASES 11/19/2002 REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 11/19/2002 REACTOR VESSEL MATERIALS 1

04/25/2013 RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION Page j~

of.~5 Report Date: 04/30/14 Page 10 of 15 Report Date: 04/30/14

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1 0

11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1

11/09/2007

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1

11/09/2007

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0

11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0

11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1

04/19/2007

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1

12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1

Title:

PLANT TEXT B3.7.2

Title:

PLANT TEXT B3.7.3.1

Title:

PLANT TEXT B3.7.3.2

Title:

PLANT TEXT B3.7.3.3

Title:

PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0

11/19/2002 EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN) 0 11/19/2002 ULTIMATE HEAT SINK (UHS)

GROUND WATER LEVEL 3

06/15/2010 FIRE SUPPRESSION WATER SUPPLY SYSTEM 2

04/26/2006 SPRAY AND SPRINKLER SYSTEMS 0

11/19/2002 C02 SYSTEMS Page 11 of 15 Report. Date: 04/30/14 Page 11 of

.15 Report Date: 04/30/14

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.4

Title:

PLANT TEXT B3.7.3.5

Title:

PLANT TEXT B3.7.3.6

Title:

PLANT TEXT B3.7.3.7

Title:

PLANT TEXT B3.7.3.8

Title:

PLANT TEXT B3.7.4

Title:

PLANT TEXT B3.7.5.1

Title:

PLANT TEXT B3.7.5.2

Title:

PLANT TEXT B3.7.5.3

Title:

PLANT TEXT B3.7.6

Title:

PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 2

04/29/2014 HALON SYSTEMS 1

04/26/2006 FIRE HOSE STATIONS 1

04/26/2006 YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 0

11/19/2002 FIRE RATED ASSEMBLIES 3

09/27/2012 FIRE DETECTION INSTRUMENTATION 0

11/19/2002 SOLID RADWASTE SYSTEM 0

11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0

11/19/2002 MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 0

11/19/2002 LIQUID HOLDUP TANKS 4

06/04/2013 ESSW PUMPHOUSE VENTILATION 2

01/31/2008 0

TEXT B3.7.7

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 4

Title:

PLANT SYSTEMS BASES SNUBBERS 01/31/2014 Page iZ of 15 Report Date: 04/30/14 Page 12 of 15 Report Date: 04/30/14

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9 2

12/08/2011

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10 1

12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11

Title:

STRUCTURAL TEXT B3.8.1

Title:

ELECTRICAL PROTECTIVE TEXT B3.8.2.1

Title:

ELECTRICAL CONTINUOUS TEXT B3.8.2.2

Title:

ELECTRICAL AUTOMATIC TEXT B3.8.3

Title:

ELECTRICAL TEXT B3.8.4

Title:

ELECTRICAL TEXT B3.8.5

Title:

ELECTRICAL TEXT B3.8.6

Title:

ELECTRICAL TEXT B3.8.7 2

04/14/2010 INTEGRITY 2

03/10/2010 POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT DEVICES 0

11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD 1

09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)

THERMAL OVERLOAD 0

11/19/2002 POWER BASES DIESEL GENERATOR (DG)

MAINTENANCE ACTIVITIES 0

11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 1

11/14/2013 POWER BASES DEGRADED VOLTAGE PROTECTION 3

06/20/2012 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 2

06/04/2013 PROTECTION -

PROTECTION -

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0

11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME Page 13 of 15 Report Date: 04/30/14 Page 13 of 15 Report Date: 04/30/14

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0

11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0

Title:

REFUELING OPERATIONS BASES 11/19/2002 REFUELING PLATFORM TEXT B3.10.1 0

11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1

04/10/2007

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0

11/19/2002

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.11.1.1

Title:

RADIOACTIVE TEXT B3.11.1.2

Title:

RADIOACTIVE TEXT B3.11.1.3

Title:

RADIOACTIVE TEXT B3.11.1.4

Title:

RADIOACTIVE TEXT B3.11.1.5

Title:

RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS 0

11/19/2002 BASES LIQUID EFFLUENTS CONCENTRATION 0

11/19/2002 BASES LIQUID EFFLUENTS DOSE 0

11/19/2002 BASES LIQUID WASTE TREATMENT SYSTEM 0

11/19/2002 EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 0

11/19/2002 BASES RADIOACTIVE LIQUID PROCESS MONITORING EFFLUENTS INSTRUMENTATION TEXT B3.11.2.1

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.2.2 1

12/14/2004 BASES DOSE RATE 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE -

NOBLE GASES Page 14 of 15 Report Date: 04/30/14 Page 1-4 of 15 Report Date: 04/30/14

SSES MANUAL Manual Name:

TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.3

Title:

RADIOACTIVE EFFLUENTS PARTICULATES FORM 0

11/19/2002 BASES DOSE -

IODINE, TRITIUM, AND RADIONUCLIDES IN TEXT B3.11.2.4 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5

Title:

RADIOACTIVE EFFLUENTS TEXT B3.11.2.6

Title:

RADIOACTIVE EFFLUENTS INSTRUMENTATION 5

07/03/2013 BASES VENTILATION EXHAUST 1

01/27/2004 BASES RADIOACTIVE GASEOUS TREATMENT SYSTEM EFFLUENT MONITORING TEXT B3.11.3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 4

06/04/2013

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2

Title:

RADIOACTIVE EFFLUENTS 0

11/19/2002 BASES LAND USE CENSUS TEXT B3.11.4.3 0

11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1

10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2

Title:

LOADS CONTROL PROGRAM TEXT B3.12.3

Title:

LOADS CONTROL PROGRAM 1

12/03/2010 BASES HEAVY LOADS REQUIREMENTS 0

11/19/2002 BASES LIGHT LOADS REQUIREMENTS Page 15 of 15 Report Date: 04/30/14 Page 15 of

.15 Report Date: 04/30/14

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TOC 1.0 TABLE OF CONTENTS USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM / 1.0-3 2.0 3.0 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Pages TRM / 2.0-8 and TRM / 2.0-9 Page TRM / 2.0-10 Page TRM / 2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM / 2.0-14 Page TRM / 2.0-15 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 Pages TRM / 3.1-2 through TRM / 3.1-5 Page TRM / 3.1-6 Page TRM / 3.1-7 Page TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-56 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Pages TRM / 3.3-4 and TRM / 3.3-5 Page TRM / 3.3-6 Page TRM 3.3-7 Page 3.3-8 10/09/2012 08/31/1998 10/04/2002 08/31/1998 08/31/1998 01/28/2005 06/25/2002 01/21/2014 04/15/2009 05/15/2008 01/07/2011 02/02/2010 11/15/2004 04/15/2009 11/15/2004 11/15/2005 06/12/2012 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/27/2007 04/15/2009 03/27/2007 02/18/1999 02/18/1999 08/31/1998 04/25/2013 07/16/1999 10/31/2007 03/10/2011 10/31/2007 08/31/1998 3.1 3.2 3.3 SUSQUEHANNA - UNIT 2 TRIM / LOES-1 EFFECTIVE DATE 04/16/2014

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.4 Pages TRM / 3.3-9 and TRM / 3.3-9a Page TRM / 3.3-10 Pages TRM / 3.3-11 and TRM / 3.3-1 la Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Page TRM / 3.3-15 Page TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM 1 3.3-21 Page TRM / 3.3-21a Pages TRM /3.3-21b through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 Pages TRM / 3.3-26 and TRM / 3.3-27 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM / 3.4-6 through TRM / 3.4-8 Page 3.4-9 Page 3.4-10 Page 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 Page TRM / 3.4-14 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 and 3.6-2 Pages TRM / 3.6-3 and TRM / 3.6-3a Page 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 06/30/2010 10/31/2007 06/30/2010 03/30/2001 01/07/2011 12/14/1998 04/11/2014 01/07/2011 06/14/2002 10/31/2007 10/22/2003 04/15/2009 11/15/2004 03/27/2007 12/03/2004 05/16/2003 10/22/2003 04/07/2009 03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/31/2007 08/31/1998 04/17/2009 03/31/2006 04/25/2013 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 04/16/2014 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.5 3.6 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 04/16/2014

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Page TRM / 3.7-4 Page TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Page TRM / 3.7-25 Page TRM / 3.7-26 Page TRM / 3.7-27 Pages TRM / 3.7-28 through TRM / 3.7-32a Page TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Page TRM / 3.7-40 Pages TRM / 3.7-40a through TRM / 3.7-40c Page TRM / 3.7-41 Page TRM / 3.7-42 Pages TRM / 3.7-43 through TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Page TRM / 3.7-55 Page TRM / 3.7-56 07/29/1999 08/31/1998 03/31/2006 04/07/2009 08/02/1999 04/07/2009 01/21/2000 08/02/1999 04/07/2009 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 09/25/2012 11/24/2011 09/25/2012 09/25/2012 03/31/2006 02/01/1999 08/31/1998 03/31/2006 05/24/2012 05/24/2012 09/04/2008 08/31/1998 10/05/2006 06/07/2007 09/05/2012 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 09/25/2009 04/01/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 04/16/2014

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.8 3.9 ELECTRICAL POWER Page TRM / 3.8-1 Page TRM / 3.8-2 Pages TRM / 3.8-3 and TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Page TRM / 3.8-13 Page TRM / 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 and TRM / 3.8-22 Page TRM / 3.8-23 Page TRM / 3.8-24 Page TRM / 3.8-25 Pages TRM / 3.8-25a and TRM / 3.8-25b Page TRM / 3.8-26 Page TRM / 3.8-27 Page TRM / 3.8-28 Page TRM / 3.8-29 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 and TRM / 3.11-8 Pages TRM / 3.11-9 and TRM / 3.11-10 Pages TRM / 3.11-11 and TRM / 3.11-12 Page TRM / 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 04/02/2002 01/28/2005 06/12/2012 04/02/2002 10/31/2007 09/03/2004 12/03/2004 06/12/2012 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 11/07/2013 11/30/2011 06/11/2012 11/30/2011 05/28/2009 11/29/2006 05/28/2009 10/20/2009 08/31/1998 03/31/2006 08/30/1998 03/27/2007 06/10/2010 3.10 3.11 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 10/09/2012 08/31/1998 04/12/2007 12/03/2004 09/01/1998 03/31/2006 SUSQUEHANNA - UNIT 2 TRM / LOES-4 EFFECTIVE DATE 04/16/2014

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page 3.11-18 Page TRM /3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 and TRM / 3.11-27 Page TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM /3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 Page TRM / 4.0-4 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 06/18/2013 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 3.12 4.0 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 04/16/2014

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Pages TRM / B 3.0-5 through TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 B 3.1 B 3.2 B 3.3 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Page TRM / B 3.1-2 Page TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 CORE OPERATING LIMITS BASES Page B 3.2-1 INSTRUMENTATION BASES Page TRM / B 3.3-1 Page TRM / B 3.3-2 Page TRM / B-3.3-2a Pages TRM / B 3.3-3 and TRM / B 3.3-3a Page TRM / B 3.3-4 Page TRM / B 3.3-5 Page TRM / B 3.3-6 Page TRM / B 3.3-7 Page TRM / B 3.3-8 Page TRM / B 3.3-9 Page TRM / B 3.3-10 Page TRM / B 3.3-11 Pages TRM / B 3.3-12 and TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 through TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a and TRM / B 3.3-19b Page TRM / B 3.3-19c Pages TRM / B 3.3-19d and TRM / B 3.3-19e Page TRM / B 3.3-20 Page TRM / B 3.3-21 Page TRM / B 3.3-22 Page TRM / B 3.3-23 Pages TRM / B 3.3-24 and TRM / B 3.3-25 08/31/1998 01/10/2007 06/12/2012 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 04/16/2014 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1998 01/21/2014 03/10/2011 10/31/2007 10/31/2007 06/30/2010 05/30/2006 06/30/2010 10/31/2007 06/30/2010 10/31/2007 01/07/2011 02/21/2014 01/07/2011 06/25/2002 10/31/2007 06/14/2002 10/22/2003 03/27/2007 03/27/2007 04/17/2009 03/27/2007 02/16/2012 08/03/2010 10/22/2003 05/16/2003 04/07/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 04/16/2014

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.4 B 3.5 B 3.6 REACTOR COOLANT SYSTEM BASES Page TRM / B 3.4-1 Pages TRM / B 3.4-2 and TRM / B3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 Page TRM / B 3.4-7 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 and TRM / B 3.5-3a Page B 3.5-4 Page TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Page TRM / B 3.7-3 Page TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Pages TRM / B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Pages TRM / B 3.7-1Oa through TRM / B 3.7-a1 a Pages TRM / B 3.7-12 and TRM / B 3.7-13 Pages TRM / B 3.7-14 through TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Pages TRM / B 3.7-21a through TRM / B 3.7-21d Pages TRM / B 3.7-21e through TRM / B 3.7-21g Pages TRM / B 3.7-22 and TRM / B 3.7-23 08/31/1998 04/01/2009 10/31/2007 10/15/1999 08/31/1998 04/25/2013 08/31/1998 10/31/2007 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/29/2007 04/04/2007 12/03/2004 12/31/2002 08/31/1998 06/10/2010 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 04/11/2014 08/02/1999 03/31/2006 08/02/1999 09/25/2012 02/01/1999 08/31/1998 05/29/2013 05/24/2012 05/29/2013 01/30/2008 B 3.7 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 04/16/2014

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.8 B.3.9 Page TRM / B 3.7-24 Page TRM / B 3.7-25 Pages TRM / B 3.7-26 through TRM / B 3.7-29 Page TRM / B 3.7-30 Page TRM / B 3.7-30a Page TRM / B 3.7-30b Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 Pages TRM / B 3.7-36 and TRM / B 3.7-37 Page TRM / B 3.7-38 Page TRM / B 3.7-39 Page TRM / B 3.7-40 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 Page TRM / B 3.8-2a Pages TRM / B 3.8-3 and TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-15 Page TRM / B 3.8-16 Page TRM / B 3.8-17 Page TRM / B 3.8-17a Page TRM / B 3.8-17b Pages TRM / B 3.8-18 through TRM / B 3.8-20 Pages TRM / B 3.8-21 and TRM / B 3.8-22 Page TRM / B 3.8-23 Page TRM / B 3.8-24 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 10/05/2006 01/21/2014 10/05/2006 06/07/2007 10/05/2006 01/21/2014 11/30/2011 03/09/2001 04/15/2003 12/03/2004 07/05/2000 04/01/2009 09/25/2009 04/01/2009 04/08/2010 04/02/2002 01/28/2005 03/01/2010 04/02/2002 09/03/2004 04/02/2002 08/31/1998 04/02/2002 11/07/2013 11/30/2011 06/11/2012 11/30/2011 05/29/2013 05/28/2009 05/29/2013 05/28/2009 08/31/1998 10/23/1998 08/31/1998 03/27/2007 08/23/1999 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 SUSQUEHANNA - UNIT 2 TRM I LOES-8 EFFECTIVE DATE 04/16/2014

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 83 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM/ B 3.11-11 and TRM / B 3.11-1la Pages TRM / B 3.11-12 and TRM / B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Pages TRM / B 3.11-20 and TRM / B 3.11-20a Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11-23 Pages TRM / B 3.11-23a and TRM / B 3.11-23b Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Pages TRM / B 3.11-30 and TRM / B 3.11-31 Page TRM / B 3.11-32 Page TRM / B 3.11-33 Pages TRM / B 3.11-34 and TRM / B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Page TRM / B 3.12-2 Page TRM / B 3.12-3 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 05/13/2005 11/14/2006 06/18/2013 01/21/2004 08/31/1998 11/30/2005 05/29/2013 08/31/1998 06/30/2010 08/31/1998 02/12/1999 09/19/2007 11/29/2010 02/05/1999 TRM2 text LOES.doc 4/22/2014 SUSQUEHANNA - UNIT 2 TRM / LOES-9 EFFECTIVE DATE 04/16/2014

TRM Isolation Actuation Instrumentation PPL Rev. 4 3.3.6 3.3 Instrumentation 3.3.6 TRM Isolation Actuation Instrumentation TRO 3.3.6 The TRM containment isolation instrumentation for each Function in Table 3.3.6-1 shall be OPERABLE.

APPLICABILITY:

As specified in Table 3.3.6-1 ACTIONS


1XI I

,ý-------------------------------
1.

Penetration flow paths isolated to comply with Action C may be unisolated intermittently under administrative controls.

2.

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required A.1 Place channel in trip.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for channels inoperable Function 2.a AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Function 2.a B.

One or more Functions with B.1 Restore isolation capability.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolation capability not maintained.

C.

Required Action and C.1 Initiate appropriate 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> associated Completion compensatory measures for Time of Condition A or B the degraded condition.

not met.

SUSQUEHANNA - UNIT 2 TRM / 3.3-13 EFFECTIVE DATE 01/07/2011

TRM Isolation Actuation Instrumentation 3.3.6 PPL Rev. 4 TECHNICAL REQUIREMENT SURVEILLANCE NOTES--------------------

1. Refer to Table 3.3.6-1 to determine which TRSs apply for each TRM Isolation Actuation Instrumentation Function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated function maintains isolation capability.

SURVEILLANCE FREQUENCY TRS 3.3.6.1 Perform CHANNEL CHECK 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TRS 3.3.6.2 Perform CHANNEL FUNCTIONAL TEST 92 days TRS 3.3.6.3 Perform CHANNEL CALIBRATION 92 days TRS 3.3.6.4 Perform CHANNEL CALIBRATION 24 months TRS 3.3.6.5 Perform LOGIC SYSTEM FUNCTIONAL TEST 24 months TRS 3.3.6.6 Perform RESPONSE TIME TEST 24 months on a staggered test basis SUSQUEHANNA - UNIT 2 TRM / 3.3-14 EFFECTIVE DATE 12/14/1998

PPL Rev. 4 TRM Isolation Actuation Instrumentation 3.3.6 TABLE 3.3.6-1 (Page 1 of 2)

PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION APPLICABLE MODES OR OTHER REQUIRED SPECIFIED CHANNELS PER SURVEILLANCE FUNCTION CONDITIONS TRIP SYSTEM REQUIREMENTS ALLOWABLE VALUE

1. Main Steam Line Isolation
a.

Turbine Building 1,2,3 2

TRS 3.3.6.2 5 200°F Main Steam Line TRS 3.3.6.3 Tunnel Temperature TRS 3.3.6.5

- High

2.

Primary Containment Isolation

a.

Main Steam Line 1,2,3 2

TRS 3.3.6.1

<21 x full power Radiation - High TRS 3.3.6.2 background without High TRS 3.3.6.4 hydrogen injection TRS 3.3.6.5 TRS 3.3.6.6(a)

3.

Shutdown Cooling System Isolation (b)

a.

RHR Flow - High 3,4,5 1(C)

TRS 3.3.6.1

_26,000 gpm TRS 3.3.6.2 TRS 3.3.6.4 TRS 3.3.6.5 (a)

Radiation detectors are exempt from response time testing.

(b)

Not required when the penetration is isolated from the reactor vessel via manual isolation valve, blind flange, or deactivated auto isolation valve.

(c)

Only one trip system required in MODES 4 and 5 when RHR Shutdown Cooling System integrity maintained.

System integrity is maintained provided the piping is intact and no maintenance is being performed that has the potential for draining the reactor vessel through the system.

SUSQUEHANNA - UNIT 2 TRM / 3.3-15 EFFECTIVE DATE 04/11/2014

TRM Isolation Actuation Instrumentation PPL Rev. 4 3.3.6 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 2 TRIM / 3.3-16 EFFECTIVE DATE 01/07/2011

Suppression Chamber-to-Drywell Vacuum Breaker Position Indication 3.6.2 PPL Rev. 2 3.6 Containment 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication TRO 3.6.2 The Suppression Chamber-to-Drywell Vacuum Breaker Position Indication shall be OPERABLE APPLICABILITY:

MODES 1, 2, and 3 ACTIONS NOTE Separate condition entry is allowed for each instrument.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more position A. 1.1 Verify that the associated 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> indicators of any suppression chamber -

suppression chamber -

drywell vacuum breaker is AND drywell vacuum breaker closed.

inoperable Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter OR A.1.2 Enter CONDITION B of Immediately LCO 3.6.1.6 AND (continued)

SUSQUEHANNA - UNIT 2 TRM / 3.6-3 EFFECTIVE DATE 04/16/2014

Suppression Chamber-to-Drywell Vacuum Breaker Position Indication 3.6.2 PPL Rev. 2 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME A.2 Restore the suppression 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> chamber - drywell vacuum breaker indication to OR OPERABLE status.

At the next outage with containment entry, not to exceed the next refueling outage for in-accessible containment components.

AND Initiate a CR for tracking and trending.

TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.6.2.1 Observe expected actuation of both valve As required by SR 3.6.1.6.2 position during the Technical Specification Functional cycling.

TRS 3.6.2.2 Perform a CHANNEL CALIBRATION on 24 months each vacuum breaker position indicator.

SUSQUEHANNA - UNIT 2 TRM / 3.6-3a EFFECTIVE DATE 04/16/2014

Spent Fuel Storage Pools (SFSPs) 3.7.10 PPL Rev. 2 3.7 Plant Systems 3.7.10 Spent Fuel Storage Pools (SFSPs)

TRO 3.7.10 The following conditions shall be met when the Unit 1 and Unit 2 SFSPs are not cross-connected through the Cask Storage Pit.

a.

The Unit 2 SFSP water temperature is less than or equal to 115 OF.

b.

Both subsystems of the ESW system must have at least one pump and the respective flow path to the Spent Fuel Storage Pool OPERABLE.

c.

One RHR Fuel Pool Cooling subsystem must be OPERABLE. (Cannot be the same set of equipment used to meet item d.)

d.

RHR must have one subsystem of Suppression Pool Cooling OPERABLE. (Cannot be the same set of equipment used to meet item c.)

e.

Zone II is capable of being aligned to the Recirculation Plenum.

APPLICABILITY:

MODES 1, 2, 3, and 4 when the analyzed nominal decay heat in one SFSP is _< 5.1 x 106 BTU/hr concurrent with the analyzed nominal decay heat in the other SFSP < 4.0 x 106 BTU/hr.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Fuel pool water A.1 Restore the temperature 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> temperature > 115 OF.

  • 115 OF.

B.

Less than two subsystems B.1 Restore two subsystems of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of ESW with at least one ESW with at least one pump pump or the respective flow and the respective flow path path to the Spent Fuel to the Spent Fuel Storage Storage Pool OPERABLE.

Pool to OPERABLE status.

C.

No RHR Fuel Pool Cooling C.1 Restore one subsystem to 7 days subsystem's OPERABLE.

OPERABLE status.

(continued)

SUSQUEHANNA - UNIT 2 TRM / 3.7-51 EFFECTIVE DATE 12/03/2004

Spent Fuel Storage Pools (SFSPs) 3.7.10 PPL Rev. 2 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D.

No RHR Suppression D.1 Restore one subsystem 7 days Pool Cooling to OPERABLE status.

subsystem's OPERABLE.

E.

Zone II not capable of E.1 Restore alignment 7 days being aligned to the capability.

Recirculation plenum.

F.

Required Actions and F.1 Initiate actions to cross-Immediately associated Completion connect the Unit 1 and Times not met.

Unit 2 Spent Fuel Storage Pools through the Cask Storage Pit.

TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.7.10.1 Verify the fuel pool temperature is less than or equal 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to 115 'F.

TRS 3.7.10.2 Verify both subsystems of ESW have at least one Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> pump and the respective flow path to the Spent Fuel after the SFSP is Storage Pool OPERABLE.

isolated from the Cask Storage Pit AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter TRS 3.7.10.3 Verify that an RHR Fuel Pool Cooling subsystem is Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OPERABLE.

after the SFSP is isolated from the Cask Storage Pit AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter (continued)

SUSQUEHANNA - UNIT 2 TRM / 3.7-52 EFFECTIVE DATE 04/15/2003 1

Spent Fuel Storage Pools (SFSPs)

PPL Rev. 2 3.7.10 TECHNICAL REQUIREMENT SURVEILLANCE (continued)

SURVEILLANCE FREQUENCY Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TRS 3.7.10.4 Verify that RHR has one subsystem of afte the FS is Suppression Pool Cooling OPERABLE.

after the SFSP is isolated from the Cask Storage Pit AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> TRS 3.7.10.5 Verify that Zone II is capable of being aligned to afte the SS is the Recirculation Plenum.

after the SFSP is isolated from the Cask Storage Pit AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter SUSQUEHANNA - UNIT 2 TRM / 3.7-53 EFFECTIVE DATE 07/29/1999

ATWS-ARI Instrumentation PPL Rev. 2 B 3.1.1 B 3.1.1 Anticipated Transient Without Scram Alternate Rod Injection (ATWS-ARI)

Instrumentation BASES TRO The ATWS-ARI System actuates a scram initiation signal to the Control Rod Drive Hydraulic System (CRDHS) either automatically (on failure to scram as indicated by high reactor pressure or low reactor water Level 2), or manually (by operator action). This function adds negative reactivity, following events in which a scram does not (but should) occur. The ATWS-ARI System is diverse from and redundant to the Reactor Protection System. (References 1 and 2)

The ATWS-ARI System includes sensors and relays to cause initiation of a reactor scram. When the setpoint is reached, the channels actuate the ATWS-ARI solenoid pilot valves, which vent the scram air header. For the purpose of this requirement, the term OPERABLE shall mean that the system or system component is capable of performing its function as required to provide compliance with 10 CFR 50.62.

The ATWS-ARI consists of two independent trip systems, with two channels of Reactor Steam Dome Pressure High and two channels of Reactor Vessel Water Level Low, Level 2 in each trip system, and manual initiation capability. Each ATWS-ARI trip system is a two-out-of-two logic for each function. Each system must actuate to effect a reactor scram. The ARI trip system shall be considered to be inoperable with the manual trip channel inoperable. The ARI trip system shall also be considered to be inoperable if any other component that is necessary to energize, and maintain energized, the ARI trip system for the period of time necessary to complete a scram via the ARI trip system (nominally 25 sec.) is not OPERABLE.

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.1-1 EFFECTIVE DATE 07/13/1999

ATWS-ARI Instrumentation PPL Rev. 2 B 3.1.1 B 3.1.1 Anticipated Transient Without Scram Alternate Rod Injection (ATWS-ARI)

Instrumentation BASES (continued)

ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components. ARI trip system diversity from the reactor protection system is required by the ATWS Rule. The Rule also requires functional redundancy with the Reactor Protection System in order to maximize the advantage of this diversity. Should the ARI trip system be inoperable, the corrective action period is based on this loss of diversity, not on the loss of the function. The redundant and diverse RPS trip system is Tech Spec controlled such that continued operation in the required operating condition is not allowed with loss of the RPS trip functions comparable to the ARI trip functions.

Since the ARI trip system is required only for mitigation of a specific class of ATWS events, and since the purpose of the ARI trip system is to provide diversity where redundancy otherwise exists, then an extended period for corrective action is justified for loss of the ARI trip function.

Unit operation without an OPERABLE ARI trip function is acceptable for a longer period of time than is allowed for the ATWS-RPT system by LCO 3.3.4.2. 14 days is considered to be an adequate period of system repair or component replacement.

TRS The TRSs are defined to be performed at the specified Frequency to ensure that the ATWS-ARI Function is maintained OPERABLE.

ATWS - ARI surveillances are performed consistent with the bases for surveillances for LCO 3.3.4.2 "ATWS-RPT Instrumentation."

The Technical Requirement Surveillances (TRS) are modified by two Notes.

Note 1 states that the TRSs for each ATWS-ARI instrumentation Function are located in the SR column of Table 3.1.1-1.

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.1-2 EFFECTIVE DATE 04/16/2014

ATWS-ARI Instrumentation B 3.1.1 PPL Rev. 2 B 3.1.1 Anticipated Transient Without Scram Alternate Rod Injection (ATWS-ARI)

Instrumentation BASES TRS (continued)

Note 2 modifies the Surveillances to indicate that when a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided RPS is OPERABLE. Upon completion of the Surveillance, or expiration of the 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowance, the channel must be returned to OPERABLE status or the applicable Condition entered and Required Actions taken.

REFERENCES

1.

10 CFR 50.62 ATWS Rule 2

NEDO-31096-A Response to the ATWS Rule

3.

NRC Inspection and Enforcement Manual, Part 9900: Technical Guidance, Standard Technical Specification Section 1.0 Definitions, Issue dated 12/8/86.

SUSQUEHANNA - UNIT 2 TRM / B 3.1-3 EFFECTIVE DATE 10/31/2007

Halon Systems PPL Rev. 2 B 3.7.3.4 B 3.7.3.4 Halon Systems BASES TRO The OPERABILITY of the fire suppression Halon systems is one part of ensuring that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppression system consists of the water supply system, spray and sprinkler systems, C02 systems, Halon systems, fire hose stations, and fire hydrants. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety related equipment and is a major element in the facility fire protection program.

An OPERABLE Halon system will have storage tanks with at least 95%

of full charge weight and 90% of full charge pressure.

Any time a PGCC panel drawer is removed, the opening must be covered with a blank to keep the Halon System OPERABLE. Removal of any PGCC Floor panel or opening of any PGCC panel door causes the affected PGCC module Halon system to become inoperable if the floor panel or panel door must be left open and unattended or cannot be immediately closed.

The basis for those systems included within the scope of this TRO includes both Safety Related and Safe Shutdown system protection.

The Halon systems are described in FPRR.

ACTIONS The Actions are defined to ensure proper corrective measures and compensatory actions are taken in response to the inoperable systems or components.

Hourly Firewatch Patrols shall be completed once each clock hour.

Individual zones on the hourly firewatch patrol shall be toured at intervals (i.e. - zone A and back to zone A) of sixty minutes with a margin of fifteen minutes.

A Continuous Firewatch must remain in the specified area at all times and must patrol the required fire zones in the specified area at least once per fifteen minutes with a margin of five minutes. Areas exist within the plant where the posting of a firewatch does not provide acceptable radiological ALARA practices. For these inaccessible areas, alternate measures should be taken to assure an adequate level of fire protection is maintained.

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.7-8 EFFECTIVE DATE 08/02/1999

Halon Systems PP.L Rev. 2 B 3.7.3.4 B 3.7.3.4 Halon Systems BASES (continued)

ACTIONS The specified area can be as small as one fire zone as large as a (continued) firewatch can reasonably patrol within the fifteen minute time period.

The specified area is limited to two floors of the Control Structure or Reactor Buildings. The floors must be adjacent or served by an operable elevator.

TRS The TRSs provide assurances that the minimum OPERABILITY requirements of the fire suppression Halon systems are met. An allowance is made for ensuring a sufficient volume of Halon in the Halon storage tanks by verifying the weight and pressure of the tanks.

Tank level measurement may be used to confirm full charge weight when supported by engineering analysis.

The Surveillances are modified by a Note to indicate that when a system is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Upon completion of the test, or expiration of the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> allowance, the system must be restored to an operable condition, or the applicable Condition entered and 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Required Action(s) completed. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> allowance is a reasonable out of service time based on prior plant test performance. This allowance also does not result in an increased risk of a fire. Required Surveillances include those surveillances under other subsections of TRM 3.7.3.

TRS 3.7.3.4.3 The purpose of the flow test is to verify that there are no obstructions /

blockages in the Halon system headers or nozzles. The use of air or nitrogen is acceptable for use in the performance of the flow test.

REFERENCES

1. FPRR Section 4.9 SUSQUEHANNA - UNIT 2 TRM / B 3.7-9 EFFECTIVE DATE 04/11/2014