Letter Sequence RAI |
---|
|
|
MONTHYEARNLS2013092, Supplemental Information Related to Response to Request for Additional Information Regarding Core Plate Hold Down Bolt Stress Analysis2013-10-0101 October 2013 Supplemental Information Related to Response to Request for Additional Information Regarding Core Plate Hold Down Bolt Stress Analysis Project stage: Supplement ML14111A2742014-04-21021 April 2014 Request for Additional Information - License Renewal Core Hold-Down Bolts Commitment Review Project stage: RAI ML14139A2602014-06-0909 June 2014 Request for Withholding from Public Disclosure, 10/4/2011 Affidavit Executed by E. Schrulll, GE-Hitachi Nuclear Energy Americas LLC, NEDC-33674P, Revision 0 Project stage: Other ML14139A2522014-06-0909 June 2014 Request for Withholding from Public Disclosure, 6/18/2013 Affidavit Executed by L. Dolan, GE-Hitachi Nuclear Energy Americas LLC, Enclosure 1 of GEH Letter 7491-317703-HP1-1 Project stage: Other ML14196A0682014-07-14014 July 2014 Request for CNS License Renewal Commitment Core Bolts Stress Analysis Draft SE Review - Sensitive, Proprietary Information Project stage: Draft Request ML14190A0042014-07-25025 July 2014 Redacted, Review of License Renewal Commitment Review Related to Core Plate Hold Down Bolt Inspection Plan and Analysis (TAC Nos. ME9550 and MF3557) Project stage: Approval 2014-06-09
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24010A1172024-01-10010 January 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML23352A2472023-12-18018 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Drywell Head Inspection RAI Issuance ML23339A0892023-12-0505 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of CLIIP LAR to Adopt TSTF-374 ML23318A5252023-11-0909 November 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Audit Agenda and Questions ML23257A2192023-09-14014 September 2023 NRR E-mail Capture - Cooper - Final RAI LAR to Adopt TSTF-551, Revision 3 ML23207A1742023-07-26026 July 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RC3-02 Drywell Head Bolting ISI ML23153A1062023-06-0202 June 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-551 ML23150A2492023-05-26026 May 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-580 ML22192A0502022-07-0808 July 2022 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-554 ML22228A2572022-05-12012 May 2022 11 CNS-2022-06 Public Documents ML22055B1512022-02-22022 February 2022 CNS EP Exercise Inspection May 2022 RFI ML22010A2632022-01-10010 January 2022 NRR E-mail Capture - Cooper - Final RAI Relief Request RR5-01 Revision 1 ML21321A3742021-11-10010 November 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RI5-02 Revision 3 ML21258A2632021-09-15015 September 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RS-01 ML21253A0312021-09-0909 September 2021 Email 9-9-2021 - Request for Information - In-Office Inspection of Recent Cooper E-Plan Changes ML21232A2102021-08-20020 August 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request Exception to Primary Containment Leakage Rate Program Requirement ML21203A3072021-07-21021 July 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RI5-02 Revision 3 ML21202A1372021-07-20020 July 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RR5-01 Revision 1 ML21165A0062021-06-11011 June 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-582 ML21109A2222021-04-15015 April 2021 Email with RFI Document for CNS PIR 2021012 ML21089A1682021-03-30030 March 2021 Email 3-30-2021-RFI for CNS EP Exercise Inspection (Week of 5-24-2021) ML20315A3922020-11-10010 November 2020 Email 11-10-2020 - Cooper EP Prog Insp RFI ML20260H4812020-09-0909 September 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Request to Use a Provision of a Later Edition of the ASME B&PV Code Section XI, Relief Request RR5-04 (L-2020-LLR-0123) ML20203M3692020-07-21021 July 2020 NRR E-mail Capture - Cooper - Final RAI License Amendment Request for Approval of EAL Scheme Change (EPID L-LLA-2020-0028) ML20175A5692020-06-22022 June 2020 (6-22-20 FEMA Hq Email) Cooper EP Biennial Exercise Exemption Request ML20139A0222020-05-15015 May 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-529 ML20126G4242020-05-0505 May 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-566, ML20098G0872020-04-0707 April 2020 CNS Req RFI for NRC In-Office Inspection of Eplan EAL Changes ML20071G3522020-03-11011 March 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance of Requested Licensing Action LAR to Adopt EAL Scheme Pursuant to NEI 99-01, Rev. 6 ML19269C1662019-09-26026 September 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of LAR for Exception from Certain Leak Testing Interval Requirements of the Primary Containment Leakage Rate Testing Program (L-2019-LLA-0179) ML19218A3732019-08-0505 August 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Requests RP5-02 and RI5-02 Rev. 2 (EPID Nos. L-2019-LLR-0063 and -0064) ML19200A0442019-07-19019 July 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-564, Revision 2 ML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A3042019-07-0808 July 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-447, Revision 1 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19256D3372019-06-21021 June 2019 (050-00298) MC&A Wishlist 2019-405 ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19092A4812019-04-0202 April 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3 ML18311A3192018-11-0606 November 2018 NRR E-mail Capture - Cooper Nuclear Station - Verbal Authorization of Relief Request PR5-02 ML18311A1862018-11-0505 November 2018 Email (11-5-18) RR RFI Responses for Review ML18198A5412018-07-17017 July 2018 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1 ML18166A1882018-06-14014 June 2018 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Revise TS Safety Limit Minimum Critical Power Ratio ML18171A1612018-06-12012 June 2018 NRR E-mail Capture - (External_Sender) TSTF-542 Implementation Change Request NRC-2017-0218, NRR E-mail Capture - (External Sender) Opportunity to Review and Comment on NRC Information Collection (10 CFR Part 73) - Response2018-05-0909 May 2018 NRR E-mail Capture - (External_Sender) Opportunity to Review and Comment on NRC Information Collection (10 CFR Part 73) - Response ML18241A3822018-03-23023 March 2018 CNS Email to Beaulieu, George, Kumana: Response to CNS Fan Coil Unit Questions ML18037B0002018-02-0606 February 2018 NRR E-mail Capture - Cooper Nuclear Station - Final RAI Relief Requests RR-02 and RR-03 (EPIDs L-2017-LRR-065 and -066) ML18024A3752018-01-24024 January 2018 NRR E-mail Capture - Cooper Nuclear Station - Final RAI LAR to Adopt TSTF-542 (CAC MG0138; EPID L-2017-LLA-0290) ML17276B3122017-10-0303 October 2017 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Requests RI5-03, RR5-02, RR5-03, RI5-02, and RI5-01 ML17254A0202017-09-0707 September 2017 NRR E-mail Capture - Acceptance Review - Cooper Nuclear Station - License Amendment Request to Adopt TSTF-542 - OPDRVs ML17142A3842017-05-22022 May 2017 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request No. RI-21, Revision 1 2024-01-10
[Table view] |
Text
NRR-PMDAPEm Resource From: George, Andrea Sent: Monday, April 21, 2014 11:05 AM To: 'Van Der Kamp, David (dwvande@nppd.com)'
Cc: Sebrosky, Joseph; Sydnor, Christopher; Rosenberg, Stacey
Subject:
Request for Additional Information - License Renewal Core Hold-Down Bolts Commitment Review (TAC No. MF3557)
Attachments: MF3557 RAI Followup.docx Mr. Van De Kamp, By letter dated January 16, 2012, and as supplemented by letters dated July 3, 2013 and October 1, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML12031A248, ML13190A030, and ML13283A010, respectively), Nebraska Public Power District (NPPD, the licensee) submitted information pertaining to their fulfillment of a license renewal commitment regarding analysis of the core hold-down bolts at Cooper Nuclear Station.
The staff has reviewed the information provided and determined that a request for additional information (RAI) is required. The RAI is attached to this email.
During a phone call on April 21, 2014, it was agreed that Cooper Nuclear Station would respond to this RAI within 30 days, which is May 21, 2014.
Please let me know of any questions. I can be reached at 301-415-1081.
Thank you, Andrea George, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-1081 1
Hearing Identifier: NRR_PMDA Email Number: 1236 Mail Envelope Properties (Andrea.George@nrc.gov20140421110500)
Subject:
Request for Additional Information - License Renewal Core Hold-Down Bolts Commitment Review (TAC No. MF3557)
Sent Date: 4/21/2014 11:05:01 AM Received Date: 4/21/2014 11:05:00 AM From: George, Andrea Created By: Andrea.George@nrc.gov Recipients:
"Sebrosky, Joseph" <Joseph.Sebrosky@nrc.gov>
Tracking Status: None "Sydnor, Christopher" <Christopher.Sydnor@nrc.gov>
Tracking Status: None "Rosenberg, Stacey" <Stacey.Rosenberg@nrc.gov>
Tracking Status: None
"'Van Der Kamp, David (dwvande@nppd.com)'" <dwvande@nppd.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1068 4/21/2014 11:05:00 AM MF3557 RAI Followup.docx 23928 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
FOLLOW-UP REQUEST FOR ADDITIONAL INFORMATION REGARDING FULFILLMENT OF LICENSE RENEWAL COMMITMENT NO. NLS2009100-1, REVISION 1 FOR THE CORE PLATE HOLD-DOWN BOLTS AT COOPER NUCLEAR STATION NEBRASKA PUBLIC POWER DISTRICT DOCKET NO. 50-298 TAC NO. MF3557 By letter dated October 1, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13283A010), Nebraska Public Power District (NPPD, the licensee) revised its commitment related to inspections of the core plate hold-down bolts at Cooper Nuclear Station to state the following:
Until the NRC endorses the revised inspection guidance of BWRVIP-25, [BWR Vessel and Internals Project, BWR Core Plate Inspection and Flaw Evaluation Guidelines, December 1996,] NPPD will perform VT-3 inspections on the top side of a 50 percent sample of the Core Plate Hold Down Bolts every other refueling outage.
Based on its review of the above inspection plan, the staff has determined that additional information is needed to make a determination regarding the adequacy of performing a VT-3 visual examination of 50 percent of the core plate hold-down bolts every other refueling outage.
The staff notes that its approval of this same inspection plan for the core plate hold-down bolts at Vermont Yankee Nuclear Power Station (VYNPS) was based, in part, on its determination that the licensee adequately demonstrated that their core plate hold-down bolts would have a low susceptibility to intergranular stress corrosion cracking (IGSCC). This determination is documented in Section 3.2.2 the staffs March 28, 2012 safety evaluation for the VYNPS core plate hold-down bolt inspection plan and stress analysis (ADAMS Accession No.
ML120760152). The staffs determination regarding IGSCC susceptibility at VYNPS was based on the fact that the VYNPS core plate hold-down bolts are not sensitized, the bolts were procured to a specification prohibiting cold forming operations after solution heat treatment, and there were no instances of stress corrosion cracking (SCC) of these bolts in the boiling water reactor (BWR) fleet at that time.
The staff will need to evaluate plant-specific information regarding the IGSCC susceptibility of these bolts in order to determine whether a VT-3 visual examination of 50 percent of the core plate hold-down bolts every other refueling outage is an acceptable inspection strategy for Cooper Nuclear Station. Therefore, please provide information regarding the fabrication practices (i.e., sensitization, cold working of the material before or after solution heat treatment, etc.) for the core plate hold-down bolts at Cooper Nuclear Station, as they relate to IGSCC susceptibility. Additionally, please indicate whether any instances of SCC have been observed for these bolts at Cooper Nuclear Station or other U.S. BWRs, based on operating experience in the domestic BWR fleet to date.
ENCLOSURE