MONTHYEARNLS2013092, Supplemental Information Related to Response to Request for Additional Information Regarding Core Plate Hold Down Bolt Stress Analysis2013-10-0101 October 2013 Supplemental Information Related to Response to Request for Additional Information Regarding Core Plate Hold Down Bolt Stress Analysis Project stage: Supplement ML14111A2742014-04-21021 April 2014 Request for Additional Information - License Renewal Core Hold-Down Bolts Commitment Review Project stage: RAI ML14139A2602014-06-0909 June 2014 Request for Withholding from Public Disclosure, 10/4/2011 Affidavit Executed by E. Schrulll, GE-Hitachi Nuclear Energy Americas LLC, NEDC-33674P, Revision 0 Project stage: Other ML14139A2522014-06-0909 June 2014 Request for Withholding from Public Disclosure, 6/18/2013 Affidavit Executed by L. Dolan, GE-Hitachi Nuclear Energy Americas LLC, Enclosure 1 of GEH Letter 7491-317703-HP1-1 Project stage: Other ML14196A0682014-07-14014 July 2014 Request for CNS License Renewal Commitment Core Bolts Stress Analysis Draft SE Review - Sensitive, Proprietary Information Project stage: Draft Request ML14190A0042014-07-25025 July 2014 Redacted, Review of License Renewal Commitment Review Related to Core Plate Hold Down Bolt Inspection Plan and Analysis (TAC Nos. ME9550 and MF3557) Project stage: Approval 2014-06-09
[Table View] |
|
---|
Category:Letter type:NLS
MONTHYEARNLS2024065, 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report2024-10-0707 October 2024 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Summary Report NLS2024053, Licensee Guarantees of Payment of Deferred Premiums2024-07-30030 July 2024 Licensee Guarantees of Payment of Deferred Premiums NLS2024055, Data from Metamic Coupon Sampling Program2024-07-29029 July 2024 Data from Metamic Coupon Sampling Program NLS2024052, Supplement to the Application to Modify the Allowable Value for Cooper Nuclear Station Technical Specifications High Pressure Coolant Injection Pump Discharge Low Flow2024-07-24024 July 2024 Supplement to the Application to Modify the Allowable Value for Cooper Nuclear Station Technical Specifications High Pressure Coolant Injection Pump Discharge Low Flow NLS2024051, Supplement to the Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program2024-07-0303 July 2024 Supplement to the Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program NLS2024035, Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications2024-05-0909 May 2024 Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications NLS2024025, License Amendment Request to Revise Technical Specifications Table 3.3.2.1-1, Control Rod Block Instrumentation2024-05-0909 May 2024 License Amendment Request to Revise Technical Specifications Table 3.3.2.1-1, Control Rod Block Instrumentation NLS2024037, 2023 Annual Radiological Environmental Report2024-05-0808 May 2024 2023 Annual Radiological Environmental Report NLS2024030, Annual Radioactive Effluent Release Report2024-04-25025 April 2024 Annual Radioactive Effluent Release Report NLS2024033, Preparation and Scheduling of Operator Licensing Examinations2024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations NLS2024031, Notice of Intent to Apply for Subsequent Renewal of Operating License2024-04-22022 April 2024 Notice of Intent to Apply for Subsequent Renewal of Operating License NLS2024036, Nebraska Public Power District 2023 Financial Report2024-04-19019 April 2024 Nebraska Public Power District 2023 Financial Report NLS2024027, Response to NRC Request for Additional Information Regarding Application for the Emergency License Amendment Request to Revise Technical Specifications 3 .3 .1.1, Reactor Protection (RPS) Instrumentation2024-04-0303 April 2024 Response to NRC Request for Additional Information Regarding Application for the Emergency License Amendment Request to Revise Technical Specifications 3 .3 .1.1, Reactor Protection (RPS) Instrumentation NLS2024024, Emergency License Amendment Request to Revise Technical Specifications 3.3.1.1, Reactor Protection (RPS) Instrumentation2024-04-0101 April 2024 Emergency License Amendment Request to Revise Technical Specifications 3.3.1.1, Reactor Protection (RPS) Instrumentation NLS2024018, Property Insurance Coverage2024-03-20020 March 2024 Property Insurance Coverage NLS2024017, Response to an Apparent Violation in NRC Inspection Report 05000298/2023012; EA-24-0012024-03-0808 March 2024 Response to an Apparent Violation in NRC Inspection Report 05000298/2023012; EA-24-001 NLS2024009, Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Support Inspection of2024-03-0808 March 2024 Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Support Inspection of NLS2024013, Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications2024-03-0404 March 2024 Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications NLS2024014, Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump2024-03-0404 March 2024 Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump NLS2024001, Application to Modify the Allowable Value for Cooper Nuclear Station Technical Specifications High Pressure Coolant Injection Pump Discharge Low Flow2024-02-16016 February 2024 Application to Modify the Allowable Value for Cooper Nuclear Station Technical Specifications High Pressure Coolant Injection Pump Discharge Low Flow NLS2024006, Response to Nuclear Regulatory Commissions Request for Additional Information for Relief Request RC3-022024-01-25025 January 2024 Response to Nuclear Regulatory Commissions Request for Additional Information for Relief Request RC3-02 NLS2024007, Emergency Plan Implementing Procedure 5.7.1, Revision 732024-01-16016 January 2024 Emergency Plan Implementing Procedure 5.7.1, Revision 73 NLS2024003, 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector2024-01-15015 January 2024 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector NLS2024004, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20232024-01-10010 January 2024 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2023 NLS2023053, ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-30030 November 2023 ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023050, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023045, Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program2023-11-15015 November 2023 Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program NLS2023051, Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-10-10010 October 2023 Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays NLS2023047, Licensee Guarantees of Payment of Deferred Premiums2023-07-26026 July 2023 Licensee Guarantees of Payment of Deferred Premiums NLS2023033, 10 CFR 50.55a Relief Request RC3-022023-06-27027 June 2023 10 CFR 50.55a Relief Request RC3-02 NLS2023039, Preparation and Scheduling of Operator Licensing Examinations2023-06-0101 June 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2023038, Nebraska Public Power District 2022 Financial Report2023-05-22022 May 2023 Nebraska Public Power District 2022 Financial Report NLS2023031, Annual Radiological Environmental Report2023-05-11011 May 2023 Annual Radiological Environmental Report NLS2023017, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023018, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NLS2023030, Annual Radioactive Effluent Release Report2023-04-27027 April 2023 Annual Radioactive Effluent Release Report NLS2023007, Technical Specification Bases Changes2023-04-17017 April 2023 Technical Specification Bases Changes NLS2023027, Annual Report of Individual Exposure Monitoring2023-04-13013 April 2023 Annual Report of Individual Exposure Monitoring NLS2023021, Quality Assurance Program Changes2023-04-10010 April 2023 Quality Assurance Program Changes NLS2023020, Decommissioning Funding2023-03-29029 March 2023 Decommissioning Funding NLS2023019, Property Insurance Coverage2023-03-23023 March 2023 Property Insurance Coverage NLS2023010, Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station2023-02-0909 February 2023 Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station NLS2023005, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20222023-01-19019 January 2023 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2022 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2022055, Emergency Plan, Revision 812023-01-0404 January 2023 Emergency Plan, Revision 81 NLS2022053, CNS-2022-11 Post Exam Submittal2022-11-22022 November 2022 CNS-2022-11 Post Exam Submittal NLS2022050, Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library2022-11-0909 November 2022 Notification of Revision to Cooper Nuclear Station Emergency Response Data System Data Point Library NLS2022048, Management Change and Correspondence Update2022-11-0101 November 2022 Management Change and Correspondence Update 2024-07-30
[Table view] |
Text
N Nebraska Public Power District Always there when you need us NLS2013092 October 1, 2013 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Supplemental Information Related to Response to Request for Additional Information Regarding Core Plate Hold Down Bolt Stress Analysis Cooper Nuclear Station; Docket No. 50-298, License No. DPR-46
Reference:
- 1. Letter from Oscar A. Limpias, Nebraska Public Power District, to U.S.
Nuclear Regulatory Commission, dated July 3, 2013, "Response to Request for Additional Information Regarding Core Plate Hold Down Bolt Stress Analysis" (NLS2013065)
- 2. Letter from David W. Van Der Kamp, Nebraska Public Power District, to U.S. Nuclear Regulatory Commission, dated January 16, 2012, "Completion of License Renewal Commitment NLS2009100-1 (Revision 1)"
(NLS2012002)
- 3. E-mail from Lynnea Wilkins, U.S. Nuclear Regulatory Commission, to David Van Der Kamp, Nebraska Public Power District, dated September 20, 2013, "Cooper - Request for Additional Information Regarding Core Plate Hold Down Bolt Stress Analysis (ME9550)"
- 4. Letter from George A. Wilson, U.S. Nuclear Regulatory Commission, to Vermont Yankee Site Vice President, Entergy Nuclear Operations, Inc., dated March 28, 2012, "Core Plate Hold Down Bolt Inspection Plan and Analysis -
Vermont Yankee Nuclear Power Station (TAC No. ME6248)"
Dear Sir or Madam:
The purpose of this letter is for the Nebraska Public Power District (NPPD) to provide to the Nuclear Regulatory Commission (NRC) supplemental information related to the response to a request for additional information (RAI) provided in Reference 1 regarding the Core Plate Hold Down Bolt Stress Analysis provided in Reference 2. This submittal is made pursuant to a conference call conducted on September 19, 2013, as described in Reference 3.
In the RAI response, NPPD indicated that visual test (VT)-3 inspections would be performed on 25% of core plate bolts on the top side on a periodic basis, consistent with the Boiling Water Reactor Vessel Internals Project (BWRVIP) interim guidance. In the September 1 9 th conference COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com
NLS2013092 Page 2 of 2 call, the NRC discussed NPPD's response and determined VT-3 inspections on the top side of a 25% sample of the core plate bolts every ten years provides insufficient assurance of component integrity. The NRC noted that the VT-3 inspections committed to by the Vermont Yankee Nuclear Power Station, as documented in Reference 4, provided the minimum number of inspections that would be acceptable. Accordingly, NPPD hereby makes the following commitment:
Until the NRC endorses the revised inspection guidance of BWRVIP-25, NPPD will perform VT-3 inspections on the top side of a 50% sample of the Core Plate Hold Down Bolts every other refueling outage.
A commitment is made in this submittal, as noted in the Attachment to this submittal. NPPD will implement this commitment within 30 days after receipt of the Safety Evaluation on the Core Plate Hold Down Bolt Stress Analysis. Should you have any questions concerning this matter, please contact Dave Van Der Kamp, Cooper Nuclear Station (CNS) Licensing Manager, at (402) 825-2904.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on: ;O0 0I, 1 (Date)
Sincer ly, Osc Lmias Vice President - T uclear and Chief Nuclear Officer OAL/wv
Attachment:
List of Regulatory Commitments cc: Regional Administrator w/Attachment USNRC - Region IV Cooper Project Manager w/Attachment USNRC - NRR Project Directorate IV-1 Senior Resident Inspector w/Attachment USNRC - CNS NPG Distribution w/o Attachment CNS Records w/Attachment
NLS2013092 Attachment Page 1 of I ATTACHMENT LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Nebraska Public Power District in this document. Any other actions discussed in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE (Check one) SCHEDULED COMMITMENT/COMMITMENT NO. ONE-TIME CONTINUING COMPLETION ACTION COMPLIANCE DATE Until the NRC endorses the revised X Implementation inspection guidance of BWRVIP-25, 30 days after NPPD will perform VT-3 inspections on issuance of the the top side of a 50% sample of the Core Safety Plate Hold Down Bolts every other Evaluation refueling outage. [NLS2013092-01 ]
.4 4