CP-201301322, License Amendment Request (LAR) 13-003, for Approval of the Revised CPNPP Cyber Security Plan Implementation Schedule
| ML13338A436 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/21/2013 |
| From: | Thomas McCool Luminant Generation Co, Luminant Power |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| CP-201301322, TAC ME4251, TAC ME4252, TXX-13168 | |
| Download: ML13338A436 (9) | |
Text
Attachment I and Enclosure - Security Related Information - Withhold under 10 CFR 2.390 Rafael Flares Luminant Power Senior Vice President P.O. Box 1002
& Chief Nuclear Officer 6322 North FM 56 rafael.flores@luminant.com Glen Rose, TX 76043 Luminant 2548975590 C 817 559 0403 F 254 897 6652 CP-201301322 Ref:
10 CFR 50.90 Log # TXX-13168 November 21, 2013 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT (CPNPP)
DOCKET NOS. 50-445, 50-446 and 72-74 LICENSE AMENDMENT REQUEST (LAR)13-003, FOR APPROVAL OF THE REVISED CPNPP CYBER SECURITY PLAN IMPLEMENTATION SCHEDULE
REFERENCES:
- 1) Letter logged TXX-11043 dated March 31, 2011, from Rafael Flores to the NRC, "Response to the Request for Additional Information Regarding Revision to the Facility Operating License and Request for Review and Approval of the Cyber Security Plan (Tac Nos. ME4251 And ME4252)"
- 2) Letter from the NRC to Rafael Flores dated July 26, 2011, approving the CPNPP Cyber Security Plan and proposed Cyber Security Plan Implementation Schedule
Dear Sir or Madam:
Pursuant to 10CFR50.90, Luminant Generation Company LLC (Luminant Power) hereby requests an amendment to the Facility Operating License (FOL) for Comanche Peak Nuclear Power Plant (CPNPP)
Unit 1 Operating License (NPF-87) and CPNPP Unit 2 Operating License (NPF-89). This change request applies to both Units. LAR 13-003 proposes a change to the CPNPP Cyber Security Plan (CSP) Milestone 8 full implementation date as set forth in the CPNPP Cyber Security Plan Implementation Schedule submitted via Reference 1 and approved by the NRC (Reference 2). provides a detailed description of the proposed changes, a technical analysis of the proposed changes, Luminant Power's determination that the proposed changes do not involve a significant hazard consideration, a regulatory analysis of the proposed changes and an environmental evaluation. provides the marked-up copy of the proposed FOL change and Attachment 3 provides retyped FOL pages which incorporate the requested changes.
The Enclosure with this letter is the proposed revised CPNPP Cyber Security Plan Implementation Schedule. The only change to the schedule is the revised regulatory commitment date for full implementation of the NRC approved Cyber Security Plan (Milestone 8).
Luminant Power requests approval of the proposed License Amendment by August 28, 2014, to be implemented within 90 days of the issuance of the license amendment.
A member of the STARS Alliance Callaway Comanche Peak. Diablo Canyon Palo Verde South Texas Project Wolf Creek Cý5
U. S. Nuclear Regulatory Commission TXX-13168 Page 2 of 3 11/21/2013 In accordance with 10CFR50.91(b), Luminant Power is providing the State of Texas with a copy of this proposed amendment. and the Enclosure with this letter contain security related information (SRI) which could reasonably be expected to be useful to potential adversaries. Luminant Power requests that Attachment 1 and the Enclosure be withheld from public disclosure in accordance with 10 CFR 2.390.
This communication contains the following revised regulatory commitment which will be completed as noted:
Number Commitment Due Date 3834209 Fully implement the CPNPP Cyber Security Plan 06/30/2017 for all SSEP functions.
The commitment numbers are used by Luminant Power for the internal tracking of CPNPP regulatory commitments.
Should you have any questions, please contact Mr. Jim Barnette at (254) 897-5866.
I state under penalty of perjury that the foregoing is true and correct.
Executed on November 21, 2013 Sincerely, Luminant Generation Company, LLC Rafael Flores By:
Thomas P. McCool Vice President, Station Support
U. S. Nuclear Regulatory Commission TXX-13168 Page 3 of 3 11/21/2013 Attachments
- 1. Description and Assessment (SRI)
- 2. Proposed Facility Operating License Changes (Mark-Up)
- 3. Retyped Facility Operating License Changes Enclosure -
CPNPP Cyber Security Plan Implementation Schedule (SRI) c -
Marc L. Dapas, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak Helen Watkins Inspection Unit Manager Texas Department of State Health Services PO Box 149347 Austin TX 78714-9347
ATTACHMENT 2 to TXX-13168 PROPOSED FACILITY OPERATING LICENSE CHANGES (MARK-UP)
Pages 8 (Unit 1) 8 (Unit 2)
(3)
Luminant Generation Company LLC shall promptly notify the NRC of any attempts by subsurface mineral rights owners to exercise mineral rights, including any legal proceeding initiated by mineral rights owners against Luminant Generation Company LLC.
G.
Luminant Generation Company LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report through Amendment 78 and as approved in the SER (NUREG-0797) and its supplements through SSER 24, subject to the following provision:
Luminant Generation Company LLC may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
H.
Luminant Generation Company LLC shall fully implement and maintain in effect all provisions of the physical security, training and qualification, and safeguards contingency plans, previously approved by the Commission, and all amendments made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain safeguards information protected under 10 CFR 73.21, are entitled: "Comanche Peak Steam Electric Station Physical Security Plan" with revisions submitted through May 15, 2006, with limited approvals as provided for in the Safety Evaluation by the office of Nuclear Reactor Regulation dated December 5, 2000; "Comanche Peak Steam Electric Station Security Training and Qualification Plan" with revisions submitted through May 15, 2006; and "Comanche Peak Steam Electric Station Safeguards Contingency Plan" with revisions submitted through May 15, 2006. Luminant Generation Company LLC shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54 (p). Luminant Generation Company LLC CSP was approved by License Amendment No. 155.
The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Sectio 170 of the Atomic Energy Act of 1954, as amended, to cover public liability ims.
J.
NOT USED as supplemented by a change approved by License Amendment XXX Unit 1 Amendment No. 68, 82, 90, 13g,155 Revised by letter dated March 15, 2007 H.
Luminant Generation Company LLC shall fully implement and maintain in effect all provisions of the physical security, guard training and qualification, and safeguards contingency plans, previously approved by the Commission, and all amendments made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain safeguards information protected under 10 CFR 73.21, are entitled: "Comanche Peak Steam Electric Station Physical Security Plan" with revisions submitted through May 15, 2006, with limited approvals as provided for in the Safety Evaluation by the Office of Nuclear Reactor Regulation dated December 5, 2000; "Comanche Peak Steam Electric Station Security Training and Qualification Plan" with revisions submitted through May 15, 2006; and "Comanche Peak Steam Electric Station Safeguards Contingency Plan" with revisions submitted through May 15, 2006. Luminant Generation Company LLC shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
Luminant Generation Company LLC CSP was approved by License Amendment
- 1.
The Ii ensee shall have and maintain financial protection of such type and in such mounts as the Commission shall require in accordance with Section 170 of t Atomic Energy Act of 1954, as amended, to cover public liability claims.
J.
N TUSED K.
his license is effective as of the date of issuance and shall expire at Midnight on February 2, 2033.
)plemented by a change approved FOR THE NUCLEAR REGULATORY COMMISSION nse Amendment No. XXX original signed by:
Thomas E. Murley, Director Office of Nuclear Reactor Regulation Attach ments/Appendices:
- 1.
Appendix A - Technical Specifications (NUREG-1468)
- 2.
Appendix B - Environmental Protection Plan
- 3.
Appendix C - Antitrust Conditions Date of Issuance: April 6, 1993 Unit 2 Amendment No. 68, 82, 89, 90, 139, 155 Revised by letter dated July 26, 2007
ATTACHMENT 3 to TXX-13168 RETYPED FACILITY OPERATING LICENSE CHANGES Pages 8 (Unit 1) 8 (Unit 2)
(3)
Luminant Generation Company LLC shall promptly notify the NRC of any attempts by subsurface mineral rights owners to exercise mineral rights, including any legal proceeding initiated by mineral rights owners against Luminant Generation Company LLC.
G.
Luminant Generation Company LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report through Amendment 78 and as approved in the SER (NUREG-0797) and its supplements through SSER 24, subject to the following provision:
Luminant Generation Company LLC may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
H.
Luminant Generation Company LLC shall fully implement and maintain in effect all provisions of the physical security, training and qualification, and safeguards contingency plans, previously approved by the Commission, and all amendments made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain safeguards information protected under 10 CFR 73.21, are entitled: "Comanche Peak Steam Electric Station Physical Security Plan" with revisions submitted through May 15, 2006, with limited approvals as provided for in the Safety Evaluation by the office of Nuclear Reactor Regulation dated December 5, 2000; "Comanche Peak Steam Electric Station Security Training and Qualification Plan" with revisions submitted through May 15, 2006; and "Comanche Peak Steam Electric Station Safeguards Contingency Plan" with revisions submitted through May 15, 2006. Luminant Generation Company LLC shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). Luminant Generation Company LLC CSP was approved by License Amendment No. 155, as supplemented by a change approved by License Amendment XXX.
The licensees shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
J.
NOT USED Unit 1 Amendment No. 68, 82, 0,139, 15, H.
Luminant Generation Company LLC shall fully implement and maintain in effect all provisions of the physical security, guard training and qualification, and safeguards contingency plans, previously approved by the Commission, and all amendments made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain safeguards information protected under 10 CFR 73.21, are entitled: "Comanche Peak Steam Electric Station Physical Security Plan" with revisions submitted through May 15, 2006, with limited approvals as provided for in the Safety Evaluation by the Office of Nuclear Reactor Regulation dated December 5, 2000; "Comanche Peak Steam Electric Station Security Training and Qualification Plan" with revisions submitted through May 15, 2006; and "Comanche Peak Steam Electric Station Safeguards Contingency Plan" with revisions submitted through May 15, 2006. Luminant Generation Company LLC shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
Luminant Generation Company LLC CSP was approved by License Amendment No. 155, as supplemented by a change approved by License Amendment No.
XXX.
The licensee shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
J.
NOT USED K.
This license is effective as of the date of issuance and shall expire at Midnight on February 2, 2033.
FOR THE NUCLEAR REGULATORY COMMISSION original signed by:
Thomas E. Murley, Director Office of Nuclear Reactor Regulation Attachments/Appendices:
- 1.
Appendix A - Technical Specifications (NUREG-1468)
- 2.
Appendix B - Environmental Protection Plan
- 3. _
Appendix C - Antitrust Conditions Date of Issuance: April 6, 1993 Unit 2 Amendment No. 68,82, 89,90,139, 155,