ML13331B119
| ML13331B119 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 01/11/1989 |
| From: | Dietch R Southern California Edison Co |
| To: | |
| Shared Package | |
| ML13331B118 | List: |
| References | |
| NUDOCS 8901190312 | |
| Download: ML13331B119 (5) | |
Text
BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION' Application of SOUTHERN CALIFORNIA EDISON
)
COMPANY and SAN DIEGO GAS & ELECTRIC COMPANY )
for a Class 104(b) License to Acquire,
)
DOCKET NO. 50-206 Possess, and Use a Utilization Facility as
)
Part of Unit No. 1 of the San Onofre Nuclear )
Amendment No. 164 Generating Station
)
SOUTHERN CALIFORNIA EDISON COMPANY and SAN DIEGO GAS & ELECTRIC COMPANY, pursuant to 10 CFR 50.90, hereby submit Amendment Application No. 164.
This amendment consists of Proposed Change No. 204 to Provisional Operating License No. DPR-13. Proposed Change No. 204 modifies the Technical Specifications incorporated in Provisional Operating License No. DPR-13 as Appendix A.
Proposed Change No. 204 is a request to revise Appendix A Technical Specifications 2.1, "REACTOR CORE - Limiting Combination of Power, Pressure, and Temperature," 3.5.2, "Control Group Insertion Limits," 3.11, "Continuous Power Distribution Monitoring," 3.3.3, "Refueling Water Storage Tank," 4.1.1, "Operational Safety Items" and 4.2.1, "Safety Injection and Containment Spray System Periodic Testing" to allow San Onofre Unit 1 to be operated as described in the forthcoming report, "Reload Safety Evaluation, San Onofre Nuclear Generating Station, Unit 1, Cycle 10."
8901190312 8 9111 PFR ADOCK 05000206 P
-2 The Reload Safety Evaluation for Cycle 10 is currently underway.
The technical specification changes identified above represent the expected scope of specifications impacted by the reload safety evaluation. Additional information in support of Proposed Change No. 204, as well as the actual values and setpoints, will be provided when available as revisions to Proposed Change 204.
In the event of conflict, the information in Amendment Application No. 164 supersedes the information previously submitted.
Based on the significant hazards analysis provided in the Description of Proposed Change and Significant Hazards Analysis of Proposed Change No. 204, it is concluded that (1) the proposed change does not involve a significant hazards consideration as defined in 10 CFR 50.92, and (2) there is reasonable assurance that the health and safety of the public will not be endangered by the proposed change.
Pursuant to 10 CFR 170.12, the fee of $150 is herewith remitted.
-3 Subscribed on this 1Z4 day of
, 1989.
Respectfully submitted, SOUTHERN CALIFORNIA EDISON COMPANY By:
Robert Dietch Vice President Subscyibed and swor to before me this
//
day of ff__
OFFICIAL SEAL AGNES CRABTREE LOS ANGELES COUNTY My Comm. Exp. Sep. 14, 1990 Los Angeles, State of California Charles R. Kocher James A. Beoletto Attorneys for Southern California Edison Company By:
C!
Charles R. Kocher
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of SOUTHERN
)
CALIFORNIA EDISON COMPANY
)
and SAN DIEGO GAS & ELECTRIC
)
Docket No. 50-206 COMPANY (San Onofre Nuclear
)
Generating Station Unit No. 1
)
CERTIFICATE OF SERVICE I hereby certify that a copy of Amendment Application No. 164 was served on the following by deposit in the United States Mail, postage prepaid, on the 11th day of January
, 1989.
Benjamin H. Vogler, Esq.
Staff Counsel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 David R. Pigott, Esq.
Samuel B. Casey, Esq.
Orrick, Herrington & Sutcliffe 600 Montgomery Street San Francisco, California 94111 L. G. Hinkleman Bechtel Power Corporation P.O. Box 60860, Terminal Annex Los Angeles, California 90060 Michael L. Mellor, Esq.
Thelen, Marrin, Johnson & Bridges Two Embarcadero Center San Francisco, California 94111 Huey Johnson Secretary for Resources State of California 1416 Ninth Street Sacramento, California 95814 Janice E. Kerr, General Counsel California Public Utilities Commission 5066 State Building San Francisco, California 94102
-2 C. 3. Craig Manager U. S. Nuclear Projects I ESSD Westinghouse Electric Corporation Post Office Box 355 Pittsburgh, Pennsylvania 15230 A. I. Gaede 23222 Cheswald Drive Laguna Niguel, California 92677 Frederick E. John, Executive Director California Public Utilities Commission 5050 State Building San Francisco, California 94102 Docketing and Service Section Office of the Secretary U.S. Nuclear Regulatory Commission Washington, D.C. 20555 CI Charles R. Kocher