ML13330A806

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 79-24, Proper Installation & Calibr of Core Spray Pipe Break Detection Equipment on Bwrs. No Response Required
ML13330A806
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/26/1979
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Arenal A
SOUTHERN CALIFORNIA EDISON CO.
References
NUDOCS 7912070023
Download: ML13330A806 (1)


Text

vpR AREG,,

ot UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1990 N. CALIFORNIA BOULEVARD SUITE 202, WALNUT CREEK PLAZA WALNUT CREEK, CALIFORNIA 94596 November 26, 1979 Docket Nos. 50-206, 50-361 50-362 Southern California Edison Company P. 0. Box 800 2244 Walnut Grove Avenue Rosemead, California 91770 Attention:

Mr. A. Arenal, Vice President Advanced Engineering Gentlemen:

The enclosed Circular No. 79-24 is forwarded to you for information. No written response is required. Should you have any questions related to your understanding of the recommendations on this matter, please contact this office.

Sincerely, R. H. Engelken Director

Enclosures:

1. IE Circular No. 79-24
2. Recently Issued IE Circulars cc w/enclosures:

J. M. Curran, SCE J. T. Head, SCE J. H. Drake, SCE 72070 021