ML13330A109

From kanterella
Jump to navigation Jump to search
Errata to Steam Generator Repair Rept, Nonproprietary Version
ML13330A109
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 08/29/1980
From:
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
Shared Package
ML13311A244 List:
References
SE-SP-58(80)-ERR, SE-SP-58(80)ERR, NUDOCS 8009190365
Download: ML13330A109 (1)


Text

ERATTA SHEET STEAM GENERATOR REPAIR REPORT Part A: Sleeving Report (page 6.34)

Table 6.11 Conclusions to Date

1. Change Item le to read:

Possible sensitization of tube or sleeve

2. Change Item 3 to read:

Compatibility of Au-Ni Braze alloy

3. Change Item 4 Findings to read:

(controlled potential and model boiler tests)

4. Change Item 5 Findings to read:

Design criteria met in all tests to date (internal pressurization, external collapse, and axial fatigue).

B~9 19, 306