Forwards SALP Board Repts 50-206/88-25,50-361/88-26 & 50-362/88-28 for Period Oct 1987 - Sept 1988.Need to Improve Mgt Involvement in Developing self-critical Attitude at All Levels of Util Organization Noted
ML13329A124
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/25/1988
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Baskin K
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13329A126 List:
References
NUDOCS 8812150133
Download: ML13329A124 (3)


See also: IR 05000206/1988025

Text

0

0

Docket No. 50-206, 361, 362

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 92770

Attention: Mr. Kenneth P. Baskin, Vice President

Nuclear Engineering, Safety, and Licensing

Gentlemen:

Subject: Systematic Assessment of Licensee Performance (SALP)

The NRC Systematic Assessment of Licensee Performance (SALP) Board has

completed its periodic evaluation of the performance of your San Onofre Nuclear

Generating Station during the period October 1, 1987 through September 30,

1988.

The performance of San Onofre was evaluated in the functional areas of plant

operations, radiological controls, maintenance/surveillance, emergency

preparedness, security, engineering/technical support, and safety

assessment/quality verification. The criteria used in conducting this

assessment and the SALP Board's evaluation of your performance in these

functional areas are contained in the enclosed SALP report.

Based upon discussions with your staff, a management meeting to discuss the

results of the SALP Board's assessment has been scheduled for December 13,

1988, at your Rosemead offices. Arrangements for the management meeting will

be discussed further with your staff in the near future.

Overall, the SALP Board found your performance to be acceptable and directed

toward safe facility operation. Good performance was noted to have continued

in the Plant Operations area; and Radiological Controls, Emergency Preparedness,

and Security were also perceived as areas of strength. However, several

concerns were identified by the NRC during this assessment period. The Board

found that there was a need to improve the involvement of management in

developing a self-critical attitude at all levels of your organization. This

need was common to several functional areas, and most pronounced in the areas

of engineering and safety assessment.

-

Engineering/Technical Support -

insufficient understanding of plant

design, inadequate control of aesign processes, and discrepancies in the

design data base.

-

Safety Assessment/Quality Verification - insufficient aggressiveness of

quality groups in identifying developing plant problems, inadequate safety

reviews, improper reportability determinations, and inadequately supported

amendment requests.

FIR

ADOCK 05000206

0

PDIC

NOV 2

18

-2

Actions were initiated late in the assessment period to start improvements,

but these actions are still in the formative stages.

A management summary of this assessment is provided in Section 11 of the

enclosed report. Perceived strengths and weaknesses and Board recommenda

tions are discussed in Section IV, Performance Analysis.

You are requested to provide to this office, within 30 days after our manage

ment meeting, a written response which addresses the two functional areas

assessed by the SALP Board as Category 3. This response should describe

actions which you have taken or plan to take to provide improved performance in

these functional areas. Actions described in previous correspondence may be

included by reference if appropriate. Your response may also include comments

on or amplification of the SALP report in other areas, as appropriate.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosed SALP

report, and your response will be placed in the NRC's Public Document Room.

The NRC's Office for Analysis and Evaluation of Operational Data performed an

assessment of licensee event reports submitted for San Onofre. This assess

ment was provided as an input to the SALP process; a copy is therefore provided

as Attachment 1 to the enclosed report.

The response requested by this letter is not subject to the clearance proce

dures of the Office of Management and Budget as required by the Paperwork

Reduction Act of 1980, PL 96-511.

Should you have any questions concerning the SALP report, we will be pleased to.

discuss them with you.

Sincerely,

J. B. Martin

Regional Administrator

Enclosure:

SALP Report No. 50-206/88-25, 361/88-26, 362/88-28

Attachment 1 Enclosed in SALP Report

cc w/enclosure:

D. H. Fogarty, (Rosemead)

C. B. McCarthy, (San Clemente)

H. E. Morgan, SONGS (San Clemente)

State of California

--NOJV

251983

-3

bcc w/enclosure:

Chairman Zech

B. Faulkenberry

Commissioner Roberts

SALP Board Members

Commissioner Rogers

G. Cook

Commissioner Carr

T. Foley, NRR

Commissioner Curtiss

N. Western

V. Stello, EDO

Docket File

T. Murley, NRR

bcc w/o enclosure:

LFMB

Maurine Smith

Region

('

F'

CCaldak1

PJoh so

RZimmerman

RScarabo

GKnighton

11 / 2/8 8

11 / Z 88

11/

4/88

11/ldf/l8 8

11/58 8

EST COPY jRE

ST COPY

REQUEST COPY j REQUEST COPY

.QUEST CoPY

YES /

NO

Y

/ NO

YE9 /

NO

YES /NO

YES/

NO

DKir

Mar

11

1/ / 8

.

E

ST COP

EST CUPY

ES

NO

YES /

NO

ENDOT

DR

YES / NO