ML13326A539
| ML13326A539 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 07/06/1979 |
| From: | Ziemann D Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML13326A538 | List: |
| References | |
| DPR-13-A-042 NUDOCS 7908070827 | |
| Download: ML13326A539 (8) | |
Text
UNITED STATES 1-NUCLEAR REGULATORY COMMISSION WASHINGTON, 0. C. 20555 SOUTHERN CALIFORNIA EDISON COMPANY AND SAN DIEGO GAS AND ELECTRIC COMPANY DOCKET NO. 50-206 SAN ON0FRE NUCLEAR GENERATING STATION, UNIT 1 AMENDMENT TO PROVISIONAL OPERATING LICENSE Amendment No.
42 License No. DPR-13
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Southern California Edison Company and San Diego Gas and Electric Company (the licensees) dated April 18, 1979 (Proposed Change No. 77), as supplemented by letters dated May 11 and May 31, 1979, complies with the standards and requirements of the Atomjc Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities.authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
-2
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B of Facility Operating License No. DPR-13 is hereby amended to read as follows:
"B.
. Technical Specifications The Technical Specifications contained in Appendices A and 8, as revised through Amendment No. 42, are hereby incorporated in the license. Southern California Edison Company shall operate.the facility in accordance with the Technical Speci fications."
- 3. This license amendment is effective as of the date if its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Dennis L. Ziemann hief Operating Reactors Branch #2 Division of Operating Reactors
Attachment:
Changes to the Technical Specifications Date of Issuance: July 6, 1979
ATTACHMENT TO LICENSE AMENDMENT NO. 42 PROVISIONAL OPERATING LICENSE NO. DPR-13 DOCKET NO. 50-206 Revise Appendix A Technical Specifications and Bases and Appendix B Technical Specifications by removing the following pages and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain vertical lines indicating the areas of change.
PAGES (Appendix A) 70 70a 73 (Appendix B) 5-3 5-5
FIGURE 6.2.2.2 FACILITY ORGANIZATION PLANT MANAGER SUPERIMENDENT STATION SUPERVISING ADMINISTRATIVE ENGINEER SUPERVISOR SUPERVISOR OF NUCLEAR PLANT SECURITY ENGINEERS ADMINISTRATIVE
- SECUITY STAFF STAFF I
I I
SUPERVISOR SUPERVISOR SUPERVISOR SUPERVISOR OF PLANT OF CHEM &
OF PLANT OF PLANT MAINMENANCE RAD PFTECPION INSTRUMErPrATION OPERA IONS*
CHEM RAD WAIi.
PIO ENGINEERS ENGINEERS*
CHEM PAD OPERATING*
FOREMAN PI FOREMAN FOREMAN FOREMAN TRAINING I I IADMINISTRATOR MAIbrTENANCE PLANT PERS(NNEL TECHNICIANS TECHNICIANS OPERAIORS" Senior Reactor Operator License Required Control and Assistant Control Operators are holders of Reactor Operator Licenses
-70.-
Amendment No. 3, 42
Vice President Power Supply Department General eea C)ka0 Superintendent Superintendent Prevention Conuiittee Administrator of Power Supply Department Manager or Services Steam Generation
- Manager, Control nd Nuclear Generation Conse -. ation Representativ.e HEADQUARTERS FIELD Plant Manager Fire Equipment Superintendent Inspectors San Onofre Unit 1 Station Supervisor Station Fire Brigade Plant Maintenance Fire Committee FIGURE 6.2.3.1 FIRE PROTECTION STAFF AND LINE ORGANIZATIONS 70a Amendment No. M. 42
6.5 REVIEW AND AUDIT 6.5.1 ONSITE REVIEW COMI TTEE (OSRC)
FUNCTION 6.5.1.1 The OSRC shall function to advise the Plant Manager on all matters related to nuclear safety.
COMPOSITION:
6.5.1.2 The OSRC shall be composed of the:
Chaiman:
Plant Manager Member:
Superintendent Member:
Supervising Engineer Member:
Supervision of Plant Operations Member:
Supervisor of Plant Instrumentation Member:
Supervisor of Chemistry 'a Radiation Protection Member:
Supervisor of Plant Maintenance Member:
Nuclear Engineer Member:
San Diego Gas & Electric Representative ALTEP-NA-E 6.5.1.3 Alternate =e-e.s shall be appointed in writing by the Serve on a eorary basis; however, Supra t erve fPatOeain no more than two alternates shll participate in OSRC activities at any one timie.
M~rTING FREOL'E::cy 6.5.1.4 The OSRC shall meet at least once per calender month and as convened by the OSRC Chairman.
QUORU.
6.5.1.5 A quorum of the OSRC shall consist of the Chairman or his designated alternate and three members, including alternates. For environ.ental matters, the Supervisor of Chemistry & Radiation Protection or an adequately qualified representative shall be present.
RErSv4OSIB 7 --rES 6.5.1.6 In perfomizz their duties with regard to these Appendix A Tec6:ica1 Specifications, the OSRC shall be respons ble for:
- a. Review of 1) all procedures required by Specifi cation 6.8and changes thereto, 2) anyother proposed procedures or changes thereto as detersined by the Plant Manager to affect nuclear safety.
- b. Review of all prcposedtests and experients that affect nuclear safety.
Amendment No. 79, 42
5-3 PLANT MANAGER SUPERITENDENT STATION SUPERVISING ADMINISTRATIVE ENGINEER SUPERVISOR SUPERVISOR OF NUCLEAR PLANT SECURITY ENGINEERS ADMINISTRATIVE
'SECULTY STAFF STAFF I
I I
SUPERVISOR SUPERVISOR SUPERVISOR SUPERVISOR OF PLANT OF CHEM &
OF PLANT OF PLANT MAINTENANCE PAD PF JUECTION INSTRUMETrATION OPERA IONS*
CHEM RAD WNII.
PIOP ENGINEERS ENGINEERS*
CHEM RAD OPERATING*
FOREMAN PIT FOREMAN FOREMAN FOREMAN TRAINING ADMINISTRAIOR MAIPTENANCE PLANT PERSONNEL TECHNICIANS TECHNICIANS OPERATORS*
Senior Reactor Operator License Required Control and. Assistant Control Operators are holders of Reactor Operator Licenses FIGURE 5.2-2 SAN ONOFRE NUCLEAR GENERATING STATION (UNIT 1)
ORGANIZATION Amendment No.
3.
5.3.2 The membership of the Nuclear'Audit and Rev iew Committee and the responsibilities and authorities of the Committee with respect to these environmental technical specifications are as follows:
- a.
Membership (Chairman designated by the Nuclear Control Board)
(1) Plant Manager (Chairman)
(2) Superintendent (3) Supervising Engineer (4) Supervisor of Plant.Operations (5
Supervisor of.Plant Instrumentation (f
Supervisor of Chemical & Radiation Protection (6)
() Superintendent Minennc (8) Nuclear Engineer (9) San Diego Gas & Electric Representative
- b.
Responsibilities (1) Review and investigate reports concerning violations of the Environmental Technical Specifications. Where investigation indicates, evaluate and prepare recomenda tions to prevent their recurrence.
(2) Review proposed changes to the Environmental Technical Specifications. Coordinate environmental technical specifications with the safety technical specifications to avoid conflicts and maintain consistency. Submit approved proposed changes to the Environ=ental Technical Specifications to the Nuclear Control Board for transmittal.
(3) Review and approve proposed changes to the facility and its procedures or proposed tests or experiments which are forwarded by the Onsite Review Committee when they involve a change in the Environmental Technical Specifications, or a change which would significantly alter the environmental impact of the facility. Submit such proposed changes when required with appropriate environmental analysis to the Nuclear Control Board for transmittal.
(4) Review all environmental surveillance programs for compliance with these environmental technical specifications.
(5) Review all design changes related to changes in the Station which relate to the environmental impact of the station and its operation.
(6) Review overall.facility activities as they relate to environmental impact by:
(a) formal facility review annually and as direc.
by the Comittee Chairman.
5-5 Amendment No. 39. 42