ML13324A651

From kanterella
Jump to navigation Jump to search
Forwards Request for Addl Info Re Recent Part 21 Repts from Tdi Needed to Continue Review of Tdi Engine Reliability Issues.Response Requested within 45 Days of Date of Ltr
ML13324A651
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 06/17/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Baskin K
Southern California Edison Co
References
REF-PT21-85 LSO5-85-06-021, LSO5-85-6-21, NUDOCS 8506190323
Download: ML13324A651 (4)


Text

June 17, 1985 Docket No. 50-206 LS05-85-06-021 Mr. Kenneth P. Baskin, Vice President Nuclear Engineering Safety and Licensing Department Southern California Edison Company 2244 Walnut Grove Avenue Post Office Box 800 Rosemead, California 91770

Dear Mr. Baskin:

SUBJECT:

TRANSAMERICA DELAVAL INC. (TDI) DIESEL GENERATORS - RECENT 10 CFR PART 21 REPORTS FROM TDI Re:

San Onofre Nuclear Generating Station Unit No. 1 The NRC staff is continuing the review of the TDI engine reliability issues. The staff finds that the additional information identified in the enclosure is needed to continue our review. Please provide your response within 45 days of the date of this letter.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, Prienh1 signod bys John A. Zwolinski, Chief Operating Reactor Branch No. 5 Division of Licensing

Enclosure:

As stated cc w/enclosure:

See next page DISTRIBUTION Docket File NRC PDR Local PDR ORB#5 Reading HThompson OELD EJordan 8506190323 850617 BGrimes PDR ADOCK 05000206 JPartlow P

PDR WPaulson CJamerson ACRS (10)

CBerlinger DL:ORB#

DL:ORB#5 DL:ORB#5 CJamerso WPaul on:tm JZwolinski 06/43/85 06/17/85 06//85

tpkREG(,a o

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 June 17, 1985 Docket No. 50-206 LS05-85-06-021 Mr. Kenneth P. Baskin, Vice President Nuclear Engineering Safety and Licensing Department Southern California Edison Company 2244 Walnut Grove Avenue Post Office Box 800 Posemead, California 91770

Dear Mr. Baskin:

SUBJECT:

TRANSAMERICA DELAVAL INC. (TDI) DIESEL GENERATORS - RECENT 10 CFR PART 21 REPORTS FROM TDI Re:

San Onofre Nuclear Generating Station Unit No. 1 The NRC staff is continuing the review of the TDI engine reliability

-issues. The staff finds that the additional information identified in the

- enclosure is needed to continue our review. Please provide your response within 45 days of the date of this letter.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, John A. Zwolinski, Chief Operating Reactor Branch No. 5 Division of Licensing

Enclosure:

As stated cc w/enclosure:

See next page

Mr. Kenneth P. Baskin San Onofre Nuclear Generating Station Southern California Edison Company Unit No. 1 cc Charles R. Kocher, Assistant Joseph 0. Ward, Chief General Counsel Radiological Healt Branch James Beoletto, Esquire State Department of Health Southern California Edison Company Services Post 0"'fice Fox 800 714 P Street, Office Bldg. 8 Rosemead, California 91770 Sacramento, California 95814 David R. Pigott Orrick, Herrington & Sutcliffe 600 Montgomery Street San Francisco, California 94111 er Lou Bernath San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Resident Inspector/San Onofre NPS c/o U.S. NRC P. 0. Box 4329 San Clemente, California 92672 Mayor City of San Clemente San Clementp, California 92672 Chairman Board of Suoervisors County of San Diego San Diego, California 92101 Director Energy Facilities Siting Division Energy Resources Conservation &

Development Commission 1516 9th Street Sacramiento, California 95814 Regional Administrator Nuclear Regulatory Commission, Region V 1450 Maria Lane Walnut Creek, California 94596

ENCLOSURE REQUEST FOR INFORMATION NUCLEAR UITTLTTY OWNERS OF TDI DIESEL GENERATORS The NRR staff plans to issue a Safety Evaluation (SE) for each plant with TDI EDGs to close out the TDI engine reliability issues.

This final SE will 6e based, inpart, upon the Design Review/Ouality Revalidation (DR/QR) RepoFrY issued for each plant. However, during the preparation and subsequent submittal of the DR/OP reports a number of Part 21 notifications have been issued by TDI regarding potentially generic issues, which need to be addressed by each TDT owner utility.

To permit the staff to complete its review and prepare the final SE for each plant, utilities are requested to identify to NRR recent Part 21 reports issued by TDI (since April 1984) which concern problems potentially applicable to their plant, but which are not addressed in the DR/QR report for their plant. For each such Part 21 report, the utility should describe the actions it has taken to assess whether these potential problems exist at their plants, causes of these problems, short and lona term corrective actions to be taken, and implementation schedules.

With respect to recently observed problems with Clow Williams-Pacar check valves (Part 21 notifications from TDI dated March 12, March 14, April 4, and April 10, 1985), each utility is requested to address its actions relative to such valves located not just in the air start system, but also arfy such valves located in other EDG systems (e.g., jacket water and lube oil).

Tf corrective actions have not been implemented, the 4ustification for further delays shoild be provided.

Pending issuance of the final SE by the staff, the reauested information should also be provided on a similar schedule For any future Part 21 notifications from TDI.