UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIA BOULEVARD
SUITE 202, WALNUT CREEK PLAZA
WALNUT CREEK, CALIFORNIA 94596
November 28, 1980
Docket No. 50-206
Southern California Edison Company
P. 0. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention:
Dr. L. T. Papay
Vice President, Advanced Engineering
Gentlemen:
Subject:
NRC Inspection -
San Onofre Unit 1
This refers to the inspection conducted by Mr. L. Miller of this office on
September 29, 1980 through October 31, 1980, of activities authorized by NRC
License No. DPR-13, and to the discussion of our findings held by Mr. Miller
with Messrs. Curran and Haynes and other representatives of the Southern.
California Edison Company at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed .inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspector.
No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with Section 2.790 of the NRC's "Rules of Pratice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20
days of the date of this letter, requesting that such information be withheld
from public disclosure. The application must include a full statement of
.the reasons why it is claimed that the information is proprietary. The
application should be prepared so that any proprietary information identified
is contained in an enclosure to the application, since the application without
the enclosure will also be placed in.the Public Document Room. If we do not
hear from you in.
this regard within the specified period, the report will
be placed in the Public Document Room.
Southern California Edison Company
-2-
10D
1
1980
Should you have any questions concerning this inspection, we will be glad
to discuss them with you.
Sincerely,
/LrbW4,
Chief
Oeactor Operations and
Nuclear Support Branch
Enclosure:
IE Inspection Report
No. 50-206/80-31
cc w/o enclosure:
R. Dietch, Vice President Nuclear
Engineering & Operations, SCE
J. M. Curran, SCE
0II