Forwards IE Insp Rept 50-206/80-28 on 800904-26 & Notice of Violation
ML13323A878
Person / Time
Site: San Onofre 
Issue date: 10/24/1980
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13323A879 List:
References
NUDOCS 8012040313
Download: ML13323A878 (2)


See also: IR 05000206/1980028

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIA BOULEVARD

SUITE 202, WALNUT CREEK PLAZA

WALNUT CREEK, CALIFORNIA 94596

Docket No. 50-206

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention:

Dr. L. T. Papay

Vice President, Advanced Engineering

Gentlemen:

S

Subject:

NRC Inspection - San Onofre Unit 1

This refers to the inspection conducted by Mr. L. Miller of this office

on September 4-26, 1980, of activities authorized by NRC License

No. DPR-13, and to the discussion of his findings held by Mr. Miller with

Mr. Curran and other representatives of the Southern California Edison

Company at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, in

terviews with personnel, and observations by the inspector.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix A.

These items of noncompliance have been categorized into a level as de

scribed in our correspondence to all NRC licensees dated December 31, 1974.

This notice is sent to you pursuant to the provisions of Section 2.201,

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Section 2.201 requires you to submit to this office,

within twenty (20)

days of your receipt of this notice, a written statement

or explanation in reply including (1) corrective steps which have been

taken by you and the results achieved; (2) corrective steps which will

be taken to avoid further violations;.and (3) the date when .full compliance

will be achieved.

8I P o',313I

Southern California Edison Company

-2

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure. The application

must include a full statement of the reasons why it is claimed that the

information is proprietary. The application should be prepared so that

any proprietary information identified is contained in an enclosure to

the application, since the application without the enclosure will also

be placed in the Public Document Room. If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

jii

r s, Chief

ieacto,Operations and Nuclear

Support Branch

Enclosures:

1.

Notice of Violation - Appendix A

2.

IE Inspection Report

No. 50-206/80-28

cc w/o enclosure 2:

R. Dietch, Vice President

Nuclear Engineering & Operations, SCE

J. M. Curran, SCE