ML13323A617
| ML13323A617 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 09/21/1979 |
| From: | Crews J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Arenal A SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML13323A615 | List: |
| References | |
| NUDOCS 7911090153 | |
| Download: ML13323A617 (2) | |
See also: IR 05000206/1979012
Text
UNITED STATES
0
.JJCLEAR REGOiLATORY COMMISSION
REGiON V
1990 N. CALIFORNIA BOULEVARD
SUITE 202, WALNUT CREEK PLAZA
WALNUT C
ALIFORNIA 94596
Docket No. 50-206
Southern California Edison Company
P. 0. Box 800
2244 Walnut Grove Avenue
Attention: Mr. A. Arenal
Vice President, Advanced Engineering
Gentlemen:
Subject:
NRC Inspection - San Onofre Unit 1
This refers to the inspection conducted by Messrs. L. Miller and M. Bagaglio
of this office on July 31 - August 2, 1979 of activities authorized by NRC
License No. DPR-13, and to the discussion of our findings held by Mr. Miller
with Mr. J. Curran and other members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the enclosed inspection
report.
Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspectors.
Based on the results of this inspection, it appears that two of your activities
were not conducted in full compliance with the NRC requirements, as set.forth
in the Notice of Violation, enclosed herewith as Appendix A. These items of
noncompliance have been categorized into a level as described in our correspon
dence to all NRC licensees dated December 31, 1974.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20 days
of the date of this letter, requesting that such information be withheld from
public disclosure. The application must include a full statement of the
reasons why it is claimed that the information is proprietary. The application
should be prepared so that any proprietary information identified is contained
in an enclosure to the application, since the application without the enclosure
will also be placed in the Public Document Room. If we do not hear from you
in this regard within the specified period, the report will be placed in the
Public Document Room.
7911 090
SEP31E,
Southern California Edison Company
-2
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincerely,
a '
Crews , 'Chief
Rpactor Operations and
Nuclear Support Branch
Enclosure:
IE Inspection Report
No. 50-206/79-12
cc w/o enclosure:
J. T. Head, Vice President
Power Supply, SCE
J. M. Curran, SCE
San Clemente, CA