Forwards IE Insp Rept 50-206/79-12 on 790731-0802 & Notice of Violation
ML13323A617
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 09/21/1979
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Arenal A
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13323A615 List:
References
NUDOCS 7911090153
Download: ML13323A617 (2)


See also: IR 05000206/1979012

Text

UNITED STATES

0

.JJCLEAR REGOiLATORY COMMISSION

REGiON V

1990 N. CALIFORNIA BOULEVARD

SUITE 202, WALNUT CREEK PLAZA

WALNUT C

ALIFORNIA 94596

Docket No. 50-206

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Attention: Mr. A. Arenal

Vice President, Advanced Engineering

Gentlemen:

Subject:

NRC Inspection - San Onofre Unit 1

This refers to the inspection conducted by Messrs. L. Miller and M. Bagaglio

of this office on July 31 - August 2, 1979 of activities authorized by NRC

License No. DPR-13, and to the discussion of our findings held by Mr. Miller

with Mr. J. Curran and other members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the enclosed inspection

report.

Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspectors.

Based on the results of this inspection, it appears that two of your activities

were not conducted in full compliance with the NRC requirements, as set.forth

in the Notice of Violation, enclosed herewith as Appendix A. These items of

noncompliance have been categorized into a level as described in our correspon

dence to all NRC licensees dated December 31, 1974.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure. The application must include a full statement of the

reasons why it is claimed that the information is proprietary. The application

should be prepared so that any proprietary information identified is contained

in an enclosure to the application, since the application without the enclosure

will also be placed in the Public Document Room. If we do not hear from you

in this regard within the specified period, the report will be placed in the

Public Document Room.

7911 090

SEP31E,

Southern California Edison Company

-2

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

a '

Crews , 'Chief

Rpactor Operations and

Nuclear Support Branch

Enclosure:

IE Inspection Report

No. 50-206/79-12

cc w/o enclosure:

J. T. Head, Vice President

Power Supply, SCE

J. M. Curran, SCE

San Clemente, CA