Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIA BOULEVARD
SUITE 202, WALNUT CREEK PLAZA
WALNUT CREEK, CALIFORNIA 94596
JUL 10 1980
Docket No. 50-361,(50)-362
Southern California Edison Company
P. 0. Box 800
2244 Walnut Grove Avenue
Rosemead, California
91770
Attention: Dr. L. T. Papay, Vice President
Advanced Engineering
Gentlemen:
Subject:
NRC Inspection of San Onofre Units 2 and 3
This refers to the inspection conducted by Messrs. J. H. Eckhardt and J. 0. Eln
of this office on April 28-May 1, 1980 of activities authorized by NRC Construction
Permit Nos. CPPR-97 and 98, and to the discussion of their findings held by
Mr. Eckhardt with Mr. P. A. Croy and other members of your staff at the conclusion
of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and obser
vations by the inspector.
No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within (30)
days of the date of this letter, requesting that such information be withheld
from public disclosure. The application must include a full statement of the
reasons why it claimed that the information is proprietary. The application
should be prepared so that any proprietary information identified is contained
in an enclosure to the application, since the application without the enclosure
will also be placed in the Public Document Room. If we do not hear from you
in this regard within the specified period, the report will be placed in the
Public Document Room.
Southern California Edison Company
-2-
JUL 10 u8
Should you have any questions concerning this inspection, we will be glad
to discuss them with you.
Sincerely,
G. S. Spencer, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
A. Inspection Report
Nos. 50-361/80-09
50-362/80-06
cc w/o enclosure:
R. Dietch, Vice President
Nuclear Engineering & Operations, SCE