ML13323A313
| ML13323A313 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 08/30/1982 |
| From: | Novak T Office of Nuclear Reactor Regulation |
| To: | Dietch R Southern California Edison Co |
| References | |
| NUDOCS 8209100287 | |
| Download: ML13323A313 (2) | |
Text
DISTRIBUTION AUG 3 0 1982 Document Control (50-361)
Docket No. 50-361 NRC PDR L PDR PRC System NSIC Mr. Robert Dietch Vice President LB#3 Reading Southern California Edison Company FMiraglia 2244 Walnut Grove Avenue HRood Post Office Box 800 JLee Rosemead, California 91770 Attorney, OELD OI&E
Dear Mr. Dietch:
ZRosztoczy
Subject:
San Onofre Nuclear Generating Station, Unit 2 By letter dated August 23, 1982, you affirmed the implementation of maintenance procedures as required by the San Onofre Unit 2 license condition 2.C.(5)C. We find that the implementation of the maintenance program procedures delineated in your August 23, 1982 letter are acceptaple provided that all matters relating to item 3 of the above cited letter be fully implemented by first refueling but in no case later than two years from the issuance date of the San Onofre Unit 2 low power license.
Sincerely, Original signed by:
Thomas M. Novak Thomas M. Novak, Assistant Director for Licensing Division of Licensing L
209100287 820830 PDR ADOCK 05000361 P_ -
- See previous concurrence for initials OFFICE DL:LB 3 *... DL:LBf3 E.Q.B SURNAME R
- d. 1............
F...iraglia......
Z.osztocz DATE.. 124..... 0.8.24/2.
.8.
2......
88 NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981-335-960
- /
DISTRIBUTION Document Control (50-361)
NRC/PD R L PDR Docket No. 50-361 PRC System NSIC Mr. Robert Dietch Vice President LB#3 Reading Southern California Edison Company FMiraglia 2244 Walnut Grove Avenue JLee P.O. Box 800 HRood Rosemead, California 91770 Attorney, OELD OI&E
Dear Mr. Dietch:
ACRS(16)
ZRosztoczy
Subject:
San Onofre Nuclear Generating Station, Unit 2 By letter dated August 23, 1982, you affirmed the implementation of maintenance procedures as required by the San Onofre, Unit 2 license con dition 2.C,(5)C., We find that the implementation of the maintenance pro gram procedures delineated in your August 23, 1982, letter are acceptable provided that all matters relating to item 3 of the above cited letter be fully implemented by first refueling but in no case later than two years from the issuance date of the San Onofre-jUn-it--2-44o power license.,
Thomas M. Novak, Assistant Director for Licensing Division of Licensing OFFICE SURNAME)
.H o d/ ac..Z..
ia..........
Zr b -0G 7.... Novalk..........................................
DATE
.88 RCM/ 0240 OF1FI82C I L...
R.
I.CO RD.
CO.PY..s..o..ea.--.a.
NRC FOR3M 318 (10-80) NR ICM 0240 OFFICIAL RECORDJ COPY USGPO.18-3-8