|
---|
Category:Letter
MONTHYEARML23339A1332024-01-26026 January 2024 Exemption from the Req of 10 CFR Part 50.82(a)(8)(i)(A) to Use the Kewaunee Decommissioning Trust Fund for the Management of Site Restoration Activities IR 05000305/20230022023-12-27027 December 2023 NRC Inspection Report 05000305/2023002 (Drss); 07200064/2023001 (Drss) ML23332A1922023-11-28028 November 2023 Solutions, Inc., Request for Exemptions from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23278A1002023-10-0505 October 2023 Response to Request for Additional Information (RAI) Application for Kewaunee Solutions (Ks) Site Restoration Activities ML23222A1522023-08-29029 August 2023 Letter RAI KPS Exemption Site Restoration Final Repaired IR 05000305/20230012023-08-17017 August 2023 NRC Inspection Report No. 05000305/2023001-Kewaunee Power Station ML23171B0822023-07-0505 July 2023 Letter - Kewaunee Power Station - Issuance of Exemption from Certain Requirements from 10 CFR Part 20, Appendix G, Section Iii.E ML23132A0012023-05-11011 May 2023 2022 Annual Radiological Environmental Operating Report ML23116A2182023-04-26026 April 2023 2022 Annual Radioactive Effluent Release Report ML23089A3042023-03-30030 March 2023 Decommissioning Fund Status Report ML23088A2752023-03-29029 March 2023 Solutions, Inc., Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML23093A0312023-03-29029 March 2023 Solutions, Inc., Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) for Site Restoration Activities ML23087A0402023-03-27027 March 2023 Annual Property Insurance Status Report ML23087A0292023-03-27027 March 2023 2022 Annual Report of Occupational Radiation Exposure ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring IR 05000305/20220022023-01-0303 January 2023 NRC Inspection Report Nos. 05000305/2022002(DRSS) Kewaunee Power Station ML22292A2302022-11-25025 November 2022 U.S. Nuclear Regulatory Commissions Analysis of Dominion Energy Kewaunees Decommissioning Funding Status Report for Kewaunee Power Station, Docket No. 50-305 ML22290A0052022-10-13013 October 2022 Resubmittal of Kewaunee Power Station Independent Spent Fuel Storage Installation (ISFSI) Only Emergency Plan (Ioep) and IOEP- Emergency Action Level (EAL) Basis Document, Revision 0KS ML22241A0302022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 5 IR 05000305/20220012022-08-0101 August 2022 NRC Inspection Report Nos. 05000305/2022001(DNMS) - Kewaunee Power Station ML22215A1512022-07-27027 July 2022 Executed Financial Assurance Instruments for the Kewaunee License Transfer License No. DPR-43 (Docket Nos. 50-305, 72-64) ML22209A1252022-07-26026 July 2022 Amendment No. 11 to Indemnity Agreement No. B-53 for Kewaunee Power Station (KPS) - Signed by Kewaunee Solutions, Inc ML22175A1132022-06-30030 June 2022 Solutions, Inc. - Letter for Review and Acceptance of the Energysolutions, LLC Decommissioning Quality Assurance Program with Enclosure ML22160A5272022-06-28028 June 2022 Enclosure 1 - Amendment No. 221 to Renewed Facility Operating License No. DPR-43 ML22160A5282022-06-28028 June 2022 Enclosure 2 - Amendment No. 11 to Indemnity Agreement B-53 ML22160A5262022-06-28028 June 2022 Letter - KPS - Issuance of Conforming License Amendment Regarding Indirect Transfer of License from DEK, Inc. to Kewaunee Solutions, Inc ML22188A0812022-06-23023 June 2022 ISFSI, Virgil C. Summer Nuclear Station, Unit 1 & ISFSI, North Anna Power Station, Units 1 & 2 & ISFSI, Surry Power Station, Units 1 & 2 & ISFSI - Submission of Revision 32 of the Quality Assurance Topical Report ML22172A2452022-06-22022 June 2022 Notification of Planned Closing Date and Required Regulatory Approvals for the Kewaunee License Transfer Transaction ML22175A0662022-06-17017 June 2022 Designation of Additional Reviewing Official for ISFSI and 10 CFR Part 37 Program Security Background Investigations ML22166A3392022-06-13013 June 2022 Notification of Nuclear Insurance ML22138A2552022-05-10010 May 2022 Submittal of 2021 Annual Radiological Environmental Operating Report ML22158A2112022-05-10010 May 2022 Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML22108A0352022-04-0101 April 2022 License Transfer to Kewaunee Solutions, Inc ML22091A1892022-04-0101 April 2022 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report ML22089A2432022-03-30030 March 2022 Decommissioning Funding Status Report, Financial Test and Independent Public Accountants' Letter of Attestation ML22076A0652022-03-15015 March 2022 Energy Solutions and Dominion Energy Kewaunee - Supplement to License Transfer Application Related to Use of Existing Dominion Energy Quality Assurance Program ML22060A1912022-02-25025 February 2022 Response to Request for Additional Information Related to Submittal for Approval of the Kewaunee Solutions Decommissioning Quality Assurance Program (Dqap), Revision O for Kewaunee Power Station (KPS) ML22066A4982022-02-24024 February 2022 Nuclear Property Insurance Coverage ML22047A0572022-02-16016 February 2022 Supplement to License Transfer Application Related to Decommissioning Quality Assurance Program ML22032A3242022-02-0202 February 2022 Letter to C. Sly, Dominion, from B. Watson, NRC - Dominion Energy Kewaunee, Inc. - RAI Regarding Energysolutions Submittal for Approving Decommissioning Quality Assurance Program IR 05000305/20210012021-12-27027 December 2021 NRC Inspection Report Nos. 05000305/2021001 (Dnms); 07200064/2021001 (DNMS) ML21351A4352021-12-19019 December 2021 U.S. Nuclear Regulatory Commission'S Analysis of Dominion Energy Kewaunee, Inc.'S Decommissioning Funding Status Report for Kewaunee Power Station, Docket No. 50-305 ML21355A2972021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21309A0152021-11-0909 November 2021 Acceptance Review of Dominion Energy Kewaunee, Inc. - Energysolutions Submittal for Approving Decommissioning Quality Assurance Program (EPID L-2021-DP3-0000) ML21301A1782021-10-28028 October 2021 Response to Request for Additional Information Regarding Application for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License ML21294A3652021-10-21021 October 2021 Changes to Decommissioning Trust Agreement ML21288A5572021-10-18018 October 2021 Energysolutions Submittal for Approving Decommissioning Quality Assurance Program (EPID L-2021-DP3-0000) ML21257A0682021-09-30030 September 2021 Request for Additional Information Regarding Application for Order Approving Transfer of Control of Kewaunee Power Station License and Conforming License Amendments ML21277A2462021-09-29029 September 2021 Resubmittal of Solutions Decommissioning Quality Assurance Program (Dqap), Revision 0 2024-01-26
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY CO~MISSION WASHINGTON, D.C. 20555~0001 January 22, 2014 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.
lnnsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060
SUBJECT:
KEWAUNEE POWER STATION- RESPONSE TO REQUEST FOR RELIEF FROM RESPONDING FURTHER TO THE MARCH 2012 REQUEST FOR INFORMATION LETTER FOR RECOMMENDATION 9.3
Dear Mr. Heacock:
By letter dated March 12, 2012, 1 the Nuclear Regulatory Commission (NRC) issued a request for information per Title 10 to the Code of Federal Regulations (1 0 CFR), Section 50.54(f)
(referred to as the 50.54(f) letter), to all nuclear power reactor licensees and construction permit holders in response to lessons-learned from Japan's March 2011, earthquake and subsequent tsunami. Enclosure 5 to the 50.54(f) letter includes Recommendation 9.3 for emergency preparedness, as part of the response.to the Near- Term Task Force [NTTF] Recommendations for Enhancing Reactor Safety in the 21st Century report, issued July 12, 2011. 2 The 50.54(f) letter requested licensees, in part, to assess their 1) current communications systems and ",
equipment used during an emergency event and 2) current staffing levels and determine the appropriate staff to fill all necessary positions for responding to a multi-unit event.
3 By letter dated February 25, 2013, Dominion Energy Kewaunee (DEK) submitted a letter t6 the NRC stating its intention to cease operation of Kewaunee Power Station (Kewaunee) on May 7, 2013, per 10 CFR 50.82(a)(1 )(ii). In response to the 50.54(f) letter, Enclosure 5, Required Response, DEK submitted an April 29, 2013, letter, 4 stating that Kewaunee will no longer be authorized to operate the reactor once fuel is removed from the reactor vessel.
Further, it stated that once a certification of permanent removal of fuel is submitted to the NRC, Kewaunee will be in a permanently shutdown and defueled condition and the obligations of the 50.54(f) letter will no longer apply. DEK therefore requested to be relieved from responding further to the 50.54(f) letter.
By letter5 dated May 14,.2013, DEK submitted a certification of permanent removal of fuel from the Kewaunee reactor vessel per 10 CFR 50.82(a)(1 )(ii). Subsequently, the NRC staff verified that the Kewaunee certifications are docketed, therefore, the license no longer authorizes operation of the ~eactor or placement or retention of fuel in the reactor vessel. The staff has The 10 CFR 50.54(f) letter is available via the Agehcywide Documents Access and Management System (ADA,MS) under Accession No. ML12053A340.
The February letter is available in ADAMS under Accession No. ML13058A065.
The April letter is available in ADAMS under Accession No. ML13123A004.
The May letter is available in ADAMS under Accession No. ML13135A209.
D. Heacock reviewed your request to be relieved from the emergency preparedness actions related to the communications and staffing evaluation described in Enclosure 5 of the 50.54(f) letter, and has determined that the*requests are no longer necessary for Kewaunee.
No furtherresponses or actions associated with the 50.54(f) lette~ are necessary since the licensee is' no longer authorized to load fuel into the vessel and potential fuel-related accident scenarios are limited to the spent fuel pool. Unlike the reactor, the safety of fuel located in the spent fuel pool is assured for an extended period through maintenance of pool structural integrity, which preserves coolant inventory and maintains margin to prevent criticality.
Furthermore, for beyond design basis external events challenging the safety of the spent fuel, recovery and mitigation actions could be completed over a long period of time due to the slow progression of any accident as a result of the very low decay heat levels present in the pool within a few months following permanent shutdown of the reactor. Thus, spent fuel pool beyond design basis accident* scenarios at decommissioning reactor sites do not require the enhanced communication and staffing that may be necessary for the reactor-centered events the 50.54(f) letter addresses.
Should you have any questions regarding this letter, please contact Mr. Brian Harris at 301-415-2277 or Brian.Harris2@nrc.gov.
Sincerely, Michele G. Evans, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
. Docket No. 50-305 cc: Distribution via Listserv
- ML13322B255 OFFICE NRR/JLD/PM NRR/DORLILA NRR/DORL!LPL4-2/PM NRR/JLD/PMB/BC NAME BHarris SRohrer CGratton MMitchell DATE 01/13/14 11/20/13 01/16/14 11/26/13 OFFICE NRR/DORL/LPL4-2/BC NSIR/DSEA/0 OGC* NRR/DORL/0 NAME DBroaddus Rlewis EHouseman ME vans DATE 01/16/14 12/18/13 01/13/14 01/22/14