Confirms Thermal Hydraulic Performance of Facility Spent Fuel Pool Cooling Sys Included in Amend Application 182 & Associated Proposed Change 224
ML13322B163
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 06/04/1990
From: Nandy F
Southern California Edison Co
To:
NRC/IRM
References
NUDOCS 9006070412
Download: ML13322B163 (2)


Text

Southern California Edison Company 23 PARKER STREET IRVINE. CALIFORNIA 92718 F. R. NANDY June 4 1990 TELEPHONE MANAGER OF NUCLEAR LICENSING (714) 587-5400 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.

20555 Gentlemen:

Subject:

Docket No. 50-206 Confirmation of Spent Fuel Pool Cooling System Thermal Performance Previously Included in Amendment Application No.

182 San Onofre Nuclear Generating Station Unit 1 The purpose of this letter is to confirm the thermal hydraulic performance of the Unit 1 Spent Fuel Pool Cooling System that was included in Amendment Application No. 182 and associated Proposed Change No. 224 (submitted by letter dated May 16, 1990).

The calculations that supported the cooling system thermal performance described in those documents were characterized as preliminary because the independent review and verification process had not been completed when the amendment application was submitted.

Those calculations have now been independently verified and have been confirmed as being accurate. Specifically, the results summarized in Table 1 of the May 16, 1990 cover letter (and in Section II of PCN-224) are confirmed as correct. We have repeated these results in the enclosure for your convenience. This completes our action to confirm the correctness of these results.

If you have any questions or comments on this subject, please contact me.

Very truly yours, AA No182.SN Enclosure cc:

J. B. Martin, Regional Administrator, NRC Region V C. Caldwell, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3 90007012900604\\

IDR ADOCK 05000206 P

~

PDC

Enclosure TABLE 1 SFP COOLING SYSTEM DECAY HEAT REMOVAL CAPABILITY COMPARED TO CURRENT UFSAR MAX. ABNORMAL HEAT LOAD*

Time to Boil Max. SFP Heat Max. SFP Upon Loss of Plant Condition Load (MBtu/h)

Temp (*F)

Cooling (hr)

Current UFSAR Max.

6.8 116 47 Abnormal Heat Load Fuel Cycle 10 0.5

<90 No Boiling (current SFP (By Observation) fuel inventory)

Cycle 11 Outage 8.6 138 21 Fuel Cycle 11 14.7 179 6

(with postulated emergency defueling)

Corrected UFSAR Max.

17.0 193 3

Abnormal Heat Load These values were previously submitted in Amendment Application No. 182 (and PCN-224) as preliminary and have now been confirmed.