Revised Proposed Change 85 to Tech Specs 6.0 & ETS 5.0
ML13322A760
Person / Time
Site: San Onofre 
Issue date: 05/09/1980
From:
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML13322A759 List:
References
NUDOCS 8005130529
Download: ML13322A760 (6)


Text

D. M. Crutchfield, Chief

-2 We hope that this information assists the NRC staff in their review of Amendment No. 87.

If you have any questions or desire additional information, please contact me.

Very truly yours, Enclosure

()(

DESCRIPTION OF PROPOSED CHANGE AND SAFETY AND ENVIRONMENTAL ANALYSIS PROPOSED CHANGE NO. 85 TO THE TECHNICAL SPECIFICATIONS PROVISIONAL OPERATING LICENSE DPR-13 This is a request to revise Technical Specification 6.0 of Appendix A, and Environmental Technical Specification 5.0 of Appendix B.

REASON FOR PROPOSED CHANGE This proposed change would incorporate corporate reorganization changes into the appropriate Administrative Controls Sections of the Appendix A Technical Specifications and Appendix B Environmental Technical Specifications.

The review and submittal responsibilities of the Nuclear Control Board are redefined to comply with the guidance provided the NRC, by letter dated March 5, 1979.

That letter indicates that the provisions in Section 6.5.3.5a shall not be interpreted to impose requirements for reporting violations of technical specifications beyond the requirements set forth in Section 6.9 "Reporting Requirements."

EXISTING SPECIFICATIONS The existing sections within Technical Specifications 6.0 and Environmental Technical Specifications 5.0 are as constituted in the Appendices A and B Technical Specifications, respectively, for San Onofre Unit 1.

PROPOSED SPECIFICATIONS Appendix A Section 6.0 would be revised as follows:

(1) 6.5.2.2 The NARC shall be composed of the:

Manager of Engineering Design Manager of Environmental Affairs Manager, Nuclear Engineering & Licensing Manager, Quality Assurance Manager of Nuclear Operations Chief of Nuclear Engineering Manager, Biological Systems Research and Development San Diego Gas & Electric Representative Chairmanship shall be designated by the Nuclear Control Board.

(2) 6.5.3.2 The NCB shall be composed of the:

Vice-President (Nuclear Engineering & Operations)

Vice-President (Advanced Engineering)

Vice-President (Engineering & Construction)

Vice-President (San Diego Gas & Electric)

-2 (3) 6.5.3.5 a. Review reportable occurrences submitted to the NRC in accordance with Technical Specification 6.9.2.

(4) 6.2.3 Fire Protection Organizations The responsibility for the Fire Protection Program at the San Onofre Nuclear Generating Station Unit 1 is vested in the Senior Vice President.

The implementation of this program is delegated to staff and line organizations within the Nuclear Engineering and Operations Department and the Power Supply Department as shown in Figure 6.2.3.1.

Revised Figures 6.2.1.1, Offsite Organization and 6.2.3.1, Fire Protection Staff and Line Organizations are attached.

The balance of Technical Specification 6.0 would remain unchanged.

Appendix B Section 5.0 would be revised as follows:

(1) 5.3.2

a. Membership (Chairman designated by the Nuclear Control Board)

(1) Manager of Engineering Design (2) Manager of Environmental Affairs (3) Manager, Nuclear Engineering & Licensing (4) Chief of Nuclear Engineering (5) Manager, Biological Systems Research and Development (6) Manager, Quality Assurance (7) Manager of Nuclear Operations (8) San Diego Gas & Electric Representative (2) 5.3.3

a. Membership (1) Vice President (Nuclear Engineering & Operations)

(2)

Vice President (Advanced Engineering)

(3) Vice President (Engineering and Construction)

(4) Vice President (San Diego Gas & Electric Company)

Revised Figure 5.2-1 is attached.

The balance of Technical Specification 5.0 would remain unchanged.

SAFETY AND ENVIRONMENTAL FINDING The proposed change to the Technical Specifications described herein are administrative in nature and will have no detrimental impact on the environment, nor do they involve an unreviewed safety question as defined in 10CFR5O.59.

REVISED 6.2.1.1 OFFSITE ORGANIZATION CHAIRMAN OF THE BOARD PRESIDENT SENIOR VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT NUCAR (FUEL SUPPLY)

(NUCLEAR ENGINEERING (POWER SUPPLY)

(SYSTEM (ENGINEERING &

(ADVANCED CONTROL AND OPERATIONS)

DEVELOPMENT)

CONSTRUCTION)

ENGINEERING)

BOARD@

I NUCLEAR AUDIT AND REVIEW COMMITTEE

MANAGER, MANAGER OF MANAGER OF MANAGER OF NUCLEAR ENGINEERING NUCLEAR ENVIRONMENTAL ENGINEERING

& LICENSING OPERATIONS AFFAIRS DESIGN I

I

.DIRECTOR OF

MANAGER, RESEARCH AND QUALITY I

DEVELOPMENT ASSURANCE I ~I.

CHIEF OF PROJECT MANAGER

MANAGER, NUCLEAR SAN ONOFRE UNIT 1 BIOLOGICAL ENGINEERING RETROFIT PROJECTS SYSTEMS R&D I

I HEADQUARTERS STAFF STATION PLANT ON-SITE STAFF MANAGER REVIEW COMMITTEE

REVISED SENIOR VICE PRESIDENT rI VICE PRESIDENT VICE PRESIDENT POWER SUPPLI DEPARTMENT NUCLEAR ENGINEERING & OPERATIONS I

I GENERAL CORPORATE FIRE SUPERI4TENDENT PREVENTION COMMITTEE ADMINISTRATOR OF POWER SUPPLY DEPARTMENT SERVICES I

FIRE CONTROL AND MANAGER OF CONSERVATION NUCLEAR OPERATIONS REPRESENTATIVE HEADQUARTERS mmmmmmmmmmemmmmmmmmmmmmmer--

mmm m m FIELD PLANT MANAGER FIRE EQUIPMENT SUPERINTENDENT INSPECTORS SAN ONOFRE UNIT 1 STATION SUPERVISOR STATION FIRE BRIGADE PLANT MAINTENANCE FIRE COMMITTEE Figure 6.2.3.1 FIRE PROTECTION STAFF AND LINE ORGANIZATIONS

REVISED CHAIRMAN OF THE BOARD I

PRESIDENT SENIOR VICE P"ESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT NUCAAR (FUEL SUPPLY)

(NUCLEAR ENGINEERING (POWER SUPPLY)

(SYSTEM (ENGINEERING &

(ADVANCED CONTROL AND OPERATIONS)

DEVELOPMENT)

CONSTRUCTION)

ENG NEERING)

BOAR I

NUCLEAR AUDIT AND REVIEW COMMITTEE

MANAGER, MANAGER OF MANAGER OF MANAGER OF NUCLEAR ENGINEERING NUCLEAR ENVIRONMENTAL ENGINEERING

& LICENSING OPERATIONS AFFAIRS DESIGN I

I DIRECTOR OF

MANAGER, RESEARCH AND QUALITY DEVELOPMENT ASSURANCE I

I.

CHIEF OF PROJECT MANAGER

MANAGER, NUCLEAR SAN ONOFRE UNIT 1 BIOLOGICAL ENGINEERING RETROFIT PROJECTS SYSTEMS R&D I

I HEADQUARTERS STAFF m

mm m m m mmmmmm mmmm ummmemmmWmmmmUsMMMa mmmmm Mm 4 STATION PLANT ON-SITE STAFF.

MANAGER REVIEW FIGURE 5.2-1 SOUTHERN CALIFORNIA EDISON COMPANY CORPORATE ORGANIZATION COMMITTEE