Forwards SALP Repts 50-206/87-26,50-361/87-26 & 50-362/87-28 for June 1986 - Sept 1987.Overall Performance Acceptable.Mgt Meeting to Discuss SALP Assessment Requested
ML13316B846
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/19/1988
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Baskin K
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13316B848 List:
References
NUDOCS 8802020088
Download: ML13316B846 (2)


See also: IR 05000206/1987026

Text

JAN

1 9 g8

8

Docket Nos. 50-206, 50-361, 50-362

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 92770

Attention: Mr. Kenneth P. Baskin, Vice President

Nuclear Engineering Safety and Licensing

Gentlemen:

Subject: Systematic Assessment of Licensee Performance (SALP)

The NRC Systematic Assessment of Licensee Performance (SALP) Board has

completed its periodic evaluation Of Your performance associated with the San

Onofre Nuclear Generatino Station durinthpeidue1,98trog

Septei,iber 30, 196;.

rnthpeidJe1.98trog

The performance of San Onofre was evaluated in the functional areas of plant

operations, radiological controls, maintenance, surveillance, fire protection,

emergency preparedness, security and safeguards, outages, quality programs and

administrative controls, licensing activities training and qualificatio

n

effectiveness, anC engineering/technica support. The criteria used in

conducting this assessment and the SALP Board's evaluation of your performance

in these functional areas are contained in the enclosed SALP report.

A managemnt~ meeting to discuss the results of the SALP Board's assessment is

not a requiremnt but may be held as a public meeting at the discretion of

the licensee or NRC.

We believe that a management meeting to discuss the SALP

bassessment would be useful and productive, especially to establish a

performance baseline given the recent senior management change at the San

Onofre site. Accordingly, we are requesting such a management meeting and

request that meeting arrangements be coordinated with Mr. P.erc

son of y

staff.

H ono fm

Overall, the SALP Board found your performance to be acceptable and directed

toward safe facility operation

Improvement in Plant oPerating performance

was observed during this period, Particularly in the reduction of plant trips

and forced outages. A new functional area, ,E g n e g T c n c l S p o t a

been added. Additionally, we perceive that improvements may be in order to

strengten the problem identification and correction roles exercised by your

quality assurance organization and oversight committees. We intend to focus

additional attention on -these areas during the next SALP period, and encourage

You to do the same.

A management overview is provided in Section 111, Summary of Results, of the

nlsdSALP report.

Perceived strenigths and weaknesses, along with the SALP

oard's recommendations, are identified in Section IV, Performance Analysis.

8802020088 880119

PDR

ADOCK 05000206

G

PDR

-2-

JAN 19 1988

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosure

will be placed in the NRC's Public Document Room, as well as any comments you

may wish to submit to NRC regarding the content of the SALP report.

No reply to this letter is required; however, should you have any questions

concerning the enclosed SALP report, we would be pleased to discuss them with

you.

Sincerely,

J. B. Martin

Regional Administrator

Enclosure:

SALP Report Nos. 50-206/87-26, 50-361/87-26, 50-362/87-28

cc w/enclosure:

0. J. Fogarty, SONGS

H. B. Ray, SONGS

H. E. Morgan, SONGS (San Clemente)

State of California

bcc w/enclosure:

Resident Inspector

Project Inspector

Drew Persinko, NRR

G. Cook

B. Faulkenberry

J. Martin

docket file

T. Murley, NRR

M. Johnson, OEDO

Commissioners

J. Roe, NRR

bcc w/o enclosure: M. Smith

LFMB

RE

jk

PJ

7

RZimmerman

AChaffee

DKir'sh

.12

7'1?

12

//8/0

ST COPY ] R

EST COPY ] REQUEST COPY I

QUEST COPY

ES

NO

] F',y /

NO

IYES

/

NO

E

-NO

RScaran

G

onG

ton

/3/88.

12/5U/87

ST COPY ]

ST COPY

YE N

] E]N

YES

/NO

]

/N

J=atiR

/ /8