ML13316B510
| ML13316B510 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 11/08/1990 |
| From: | Dyer J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML13316B508 | List: |
| References | |
| DPR-13-A-137 NUDOCS 9011160027 | |
| Download: ML13316B510 (7) | |
Text
0; RUNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY DOCKET NO. 50-206 SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1 AMENDMENT TO PROVISIONAL OPERATING LICENSE Amendment No. 137 License No. DPR-13
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Southern California Edison Company and San Diego Gas and Electric Company (the licensee) dated June 11, 1990, complies with the standards and require ments of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of'the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Provisional Operating License No. DPR-13 is hereby amended to read as follows:
Ft'R
)50
0 0
-2 B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 137, are hereby incorporated in the license. Southern California Edison Company shall operate the facility in accordance with the Technical Specifications, except where otherwise stated in specific license conditions.
- 3. This license amendment is effective as of the date of its issuance and must be fully implemented no later than 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION James E. Dyer, Acting Director Project Directorate V Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: November 8, 1990
ATTACHMENT TO LICENSE AMENDMENT NO. 137 PROVISIONAL OPERATING LICENSE NO. DPR-13 DOCKET NO. 50-206 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT i
i ii ii 4.0-1 4.0-1 4.0-2 4.0-2
APPENDIX A TECHNICAL SPECIFICATIONS LIST OF EFFECTIVE PAGES Page Amendment No.
Page Amendment No.
Page Amendment No.
137 3.0-1 43, 56, 64, 83 3.3-3 25, 38, 86, 124, 1
r130 130 iii 3.0-2 56, 64, 83, 130, 3.3-4 25, 37, 124, 130 iv 131 135 3.3-5 25, 130 v
90, 130, 131 3.0-3 135 3.3-6 25, 102, 120, 130 vi 90, 130, 131 3.0-4 135 3.3-7 25, 102, 130 vii 90, 102, 130, 131 3.1-1 29, 38, 70, 83, 3.3-8 25, 38, 122, 130 viii 90, 130 91, 96, 130 3.3-9 25, 38, 122: 130 ix 90, 91, 102, 130 3.1-2 29, 83, 96, 130 3.3-10 25, 130 131 3.1-3 43, 77, 103, 130 3.3-11 NRC Order x
90, 91, 130, 131 3.1-4 77, 130 4/20/81, 130 xi 55, 92, 102, 110, 3.1-5 77, 125, 130 3.3-12 NRC Order 111, 130, 131 3.1-6 77, 102, 130 4/20/81, 130 xii 56, 58, 71, 79, 3.1-7 77, 102, 103, 130 3.4-1 29, 82, 125, 130 83, 104, 117, 130, 3.1-8 43, 102, 103, 130 3.4-2 29, 130 131 3.1-9 77, 102, 130 3.4-3 82, 125, 130 xiii 31, 56, 58, 79, 3.1-10 Change No. 14, 38, 3.4-4 82, 125, 130 83, 84, 91, 117, 102, 130 3.5-1 83, 117, 130 130, 131 3.1-11 Change No. 14, 38, 3.5-2 43, 56, 58, 83, xiv 131 102, 130 117, 128, 130 1.0-1 31, 56, 59, 83, 3.1-12 Change No. 14, 92, 3.5-3 43, 56, 58, 83, 117, 130 130 117, 121, 122, 130 1.0-2 31, 56, 59, 83, 3.1-13 Change No. 14, 92, 3.5-4 55, 58, 83, 117, 104, 117, 130 130 118, 121, 128, 130 1.0-3 31, 56, 59, 79, 3.1-14 Change No. 14, 3.5-5 83, 117, 130 83, 104, 117, 130 102, 130 3.5-6 7, 11, 25, 35, 55, 1.0-4 31, 56, 59, 79, 3.1-15 Change No. 14, 56, 111, 130 83, 117, 130 102, 130 3.5-7 7, 11, 25, 35, 49, 1.0-5 77, 79, 83, 117, 3.1-16 Change No. 14, 55, 56, 111, 122, 130 102, 130 130 1.0-6 79, 83, 96, 117, 3.1-17 Change No. 14, 3.5-8 11, 49, 111, 122, 130 102, 130 130 1.0-7 58, 83, 117, 130 3.1-18 Change No. 7, 37, 3.5-9 11, 25, 56, 111, 1.0-8 56, 83, 117, 130 55, 91, 119, 130 130 2.1-1 43, 55, 97, 117, 3.1-19 Change No. 7, 55, 3.5-10 56, 130 130 119, 130 3.5-11 56, 130 2.1-2 43, 97, 117, 121, 3.1-20 37, 55, 119, 130 3.5-12 56, 130 130 3.1-21 58, 59, 83, 130 3.5-13 56, 130 2.1-3 43, 117, 121, 122, 3.1-22 58, 130 130 3.1-23 83, 130 2.1-4 43, 117, 121, 122, 3.2-1 102, 130 130 3.2-2 25, 102, 130 2.1-5 43, 97, 117, 121, 3.3-1 25, 37, 86, 124 122, 130 130 2.1-6 55, 130 3.3-2 25, 130 SAN ONOFRE -
UNIT 1 AMENDMENT NO. 137
LIST OF EFFECTIVE PAGES (Cont.)
Page Amendment No.
Page Amendment No.
Page Amendment No.
3.5-14 56, 130 3.8-1 25, 36, 37, 3.14-26 130, 131 3.5-15 58, 83, 130 73, 77, 130 3.15-1 79, 130 3.5-16 58, 83, 130 3.8-2 36, 77, 130 3.15-2 79, 90, 91, 3.5-17 58, 83, 130 3.8-3 25, 36, 73, 105, 130 3.5-18 58, 72, 130 77, 130 3.15-3 79, 90, 91, 3.5-19 58, 83, 125, 130 3.8-4 36, 73, 77, 130 105, 130 3.5-20 125, 130 3.8-5 36, 73, 77, 130 3.16-1 79, 130 3.5-21 58, 83, 117, 124, 3.9-1 3, 10, 112, 130 3.16-2 79, 90, 91, 125, 130 3.9-2 3, 10, 112, 130 105, 130 3.5-22 64, 82, 125, 130 3.10-1 7, 8, 112, 122, 3.16-3 79, 90, 91, 3.5-23 58, 82, 125, 130 130 105, 130 3.5-24 58, 82, 125, 130 3.10-2 7, 112, 122, 130 3.16-4 79, 90, 91, 3.5-25 58, 82, 125, 129, 3.11-1 7, 8, 11, 35, 105, 130 130 55, 112, 117, 3.16-5 79, 130 3.5-26 79, 90, 105, 130 122, 130 3.16-6 79, 90, 130 3.5-27 79, 90, 130 3.11-2 7, 11, 112, 3.16-7 79, 90, 130 3.5-28 79, 130 117, 122, 130 3.17-1 79, 90, 91, 3.5-29 79, 90, 105, 130 3.12-1 14, 130 105, 130 3.5-30 79, 90, 130 3.13-1 21, 63, 81, 130 3.17-2 79, 90, 130 3.5-31 79, 90, 130 3.13-2 21, 63, 81, 130 3.18-1 79, 91, 105, 130 3.5-32 83, 130 3.14-1 31, 44, 93, 130, 3.18-2 79, 90, 130 3.5-33 83, 130 131 3.18-3 79, 130 3.5-34 83, 91, 130 3.14-2 31, 130, 131 3.18-4 79, 130 3.6-1 25, 56, 58, 3.14-3 31, 130, 131 3.18-5 79, 130 73, 130 3.14-4 31, 93, 130, 131 3.18-6 79, 130 3.6-2 Change No. 7, 3.14-5 31, 130, 131 3.18-7 79, 91, 105, 130 56, 130 3.14-6 130, 131, 134 3.18-8 79, 90, 130 3.6-3 58, 99, 130 3.14-7 130, 131 3.18-9 79, 90, 105, 130 3.6-4 58, 71, 99, 130 3.14-8 130, 131 3.19-1 79, 90, 105, 130 3.6-5 58, 59, 71, 3.14-9 130, 131 3.20-1 102, 130 99, 130 3.14-10 130, 131 3.20-2 102, 130 3.6-6 58, 59, 83, 130 3.14-11 31, 93, 130, 131 4.0-1 83, 130, 135,137 3.7-1 25, 52, 68, 3.14-12 31, 130, 131 4.0-2 83, 130, 135,137 84, 130, 134, 136 3.14-13 31, 130, 131 4.0-3 135 3.7-2 25, 84, 106, 130, 3.14-14 31, 130, 131 4.0-4 135 134, 136 3.14-15 31, 93, 130, 131 4.1-1 29, 56, 83, 3.7-3 25, 84, 130, 134, 3.14-16 31, 130, 131 117, 130 136 3.14-17 31, 130, 131, 134 4.1-2 7, 22, 83, 3.7-4 25, 52, 68, 84, 3.14-18 31, 130, 131 117, 122, 130 106, 130, 134, 136 3.14-19 130, 131 4.1-3 117, 130 3.7-5 25, 52, 68, 84, 3.14-20 130, 131 4.1-4 25, 29, 70, 106, 120, 130, 134, 3.14-21 130, 131 96, 117, 130 136 3.14-22 130, 131 4.1-5 25, 29, 70, 3.7-6 134, 136 3.14-23 130, 131 96, 130 3.7-7 134, 136 3.14-24 130, 131 4.1-6 25, 29, 56, 70, 3.7-8 136 3.14-25 130, 131 100, 122, 130, 134 SAN ONOFRE - UNIT 1 ii AMENDMENT NO. 137
4.0 SURVEILLANCE REQUIREMENTS (GENERAL)
APPLICABILITY: Applies to the surveillance requirements to be implemented in these specifications.
OBJECTIVE: To define the conditions under which the surveillance requirements of Section 4 Specifications are applicable.
SPECIFICATION:
4.0.1 Surveillance Requirements shall be met during OPERATIONAL MODES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirement.
4.0.2 Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25% of the specified surveillance interval.
4.0.3 Failure to perform a Surveillance Requirement within the allowed surveillance interval, defined by Specification 4.0.2, shall constitute noncom pliance with the OPERABILITY requirements for a Limiting Condition for Opera tion. The time limits of the ACTION requirements are applicable at the time it is identified that a Surveillance Requirement has not been performed. The ACTION requirements may be delayed for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to permit the completion of the surveillance when the allowable outage time limits of the ACTION require ments are less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Surveillance Requirements do not have to be performed on inoperable equipment.
4.0.4 Entry into an OPERATIONAL MODE or other specified condition shall not be made unless the Surveillance Requirement(s) associated with the Limiting Con dition for Operation have been performed within the stated surveillance interval or as otherwise specified. This provision shall not prevent passage through or to OPERATIONAL MODES as required to comply with ACTION requirements.
BASIS:
Specifications 4.0.1 through 4.0.4 establish the general requirements applicable to Surveillance Requirements. These requirements are based on the Surveillance Requirements stated in the Code of Federal Regulations, 10 CFR 50.36(c)(3):
"Surveillance requirements are requirements relating to test, calibration, or inspection to ensure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions of operation will be met."
Specification 4.0.1 establishes the requirement that surveillances must be performed during the OPERATIONAL MODES or other conditions for which the requirements of the Limiting Conditions for Operation apply unless otherwise stated in an individual Surveillance Requirement. The purpose of this specifi cation is to ensure that surveillances are performed to verify the operational SAN ONOFRE - UNIT 1 4.0-1 AMENDMENT NO. 137
4.0 SURVEILLANCE REQUIREMENT (GENERAL) status of systems and components and that parameters are within specified limits to ensure safe operation of the facility when the plant is in a MODE or other specified condition for which the associated Limiting Conditions for Operation are applicable. Surveillance Requirements do not have to be performed when the facility is in an OPERATIONAL MODE for which the requirements of the associated Limiting Condition for Operation do not apply unless otherwise specified. The Surveillance Requirements associated with a Special Test Exception are only applicable when the Special Test Exception is used as an allowable exception to the requirements of a specification.
Specification 4.0.2 establishes the limit for which the specified time interval for Surveillance Requirements may be extended. It permits an allowable extension of the normal surveillance interval to facilitate surveillance scheduling and consideration of plant operating conditions that may not be suitable for con ducting the surveillance; e.g., transient conditions or other ongoing surveil lance or maintenance activities. It also provides flexibility to accommodate the length of a fuel cycle for surveillances that are performed at each refuel ing outage and are specified with an 18-month surveillance interval. It is not intended that this provision be used repeatedly as a convenience to extend sur veillance intervals beyond that specified for surveillances that are not per formed during refueling outages. The limitation of specification 4.0.2 is based on engineering judgment and the recognition that the most probable result of any particular surveillance being performed is the verification of conformance with the Surveillance Requirements. This provision is sufficient to ensure that the reliability ensured through surveillance activities is not signifi cantly degraded beyond that obtained from the specified surveillance interval.
Specification 4.0.3 establishes the failure to perform a Surveillance Require ment within the allowed surveillance interval, defined by the provisions of Specification 4.0.2, as a condition that constitutes a failure to meet the OPERABILITY requirements for a Limiting Condition for Operation. Under the pro visions of this specification, systems and components are assumed to be OPERABLE when Surveillance Requirements have been satisfactorily performed within the specified time interval.
However, nothing in this provision is to be construed as implying that systems or components are OPERABLE when they are found or known to be inoperable although still meeting the Surveillance Requirements. This specification also clarifies that the ACTION requirements are applicable when Surveillance Requirements have not been completed within the allowed surveil lance interval and that the time limits of the ACTION requirements apply from the point in time it is identified that a surveillance has not been performed and not at the time that the allowed surveillance interval was exceeded. Com pletion of the Surveillance Requirement within the allowable outage time limits of the ACTION requirements restores compliance with the requirements of Speci fication 4.0.3. However, this does not negate the fact that the failure to have performed the surveillance within the allowed surveillance interval, defined by SAN ONOFRE -
UNIT 1 4.0-2 AMENDMENT NO. 137