ML13316B168

From kanterella
Jump to navigation Jump to search
Amend 113 to License DPR-13,deleting Requirement to Conduct Turbine Deck Load Test Every 4 Yrs & Prohibiting Use of Air Pallet Sys for Spent Fuel Cask Handling
ML13316B168
Person / Time
Site: San Onofre 
Issue date: 11/08/1988
From: Knighton G
Office of Nuclear Reactor Regulation
To:
Shared Package
ML13316B167 List:
References
DPR-13-A-113 NUDOCS 8811230420
Download: ML13316B168 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY DOCKET NO. 50-206 SAN ON0FRE NUCLEAR GENERATING STATION, UNIT NO. 1 AMENDMENT TO PROVISIONAL OPERATING LICENSE Amendment No. 113 License No. DPR-13

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Southern California Edison Company and San Diego Gas and Electric Company (the licensee) dated April 28, 1988 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

F R

- D C

P

-2

2. Accordingly, the license is amended by changes to the Technical Speci fications as indicated in the attachment to this license amendment, and paragraphs 3.B. and 3.C of Provisional Operating License No. DPR-13 are hereby amended to read as follows:

B. Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 113, are hereby incorporated in the license. Southern California Edison Company shall operate the facility in accordance with the Technical Specifications, except where otherwise stated in specific license conditions.

C. The licensee shall not conduct spent fuel shipments using the air pallet across the turbine deck. [Amd. No.

113 ].

3. This license amendment is effective as of the date of its issuance and must be fully implemented no later than 30 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION George W. Knighton, Director Project Directorate V Division of Reactor Projects -

III, IV, V and Special Projects

Attachment:

Changes to the Technical Specifications Date of Issuance: November 8, 1988

ATTACHMENT TO LICENSE AMENDMENT NO.113 PROVISIONAL OPERATING LICENSE NO. DPR-13 DOCKET NO. 50-206 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the area of change.

REMOVE INSERT 60-H 60-H

60-H 4.13 Turbine Deck Load Bearing Test and Visual Inspection (deleted)

Amendment No. 113