ML13316B170
| ML13316B170 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 11/08/1988 |
| From: | Trammell C Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML13316B167 | List: |
| References | |
| NUDOCS 8811230431 | |
| Download: ML13316B170 (2) | |
Text
7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION SOUTHERN CALIFORNIA EDISON COMPANY, ET AL.
DOCKET NO. 50-206 NOTICE OF ISSUANCE OF AMENDMENT TO PROVISIONAL OPERATING LICENSE The U.S. Nuclear Regulatory Commission (Commission) has issued Amendment No.113 to Provisional Operating License No. DPR-13, issued to Southern California Edison Company and San Diego Gas and Electric Company (the licensees), which revised the Technical Specifications for operation of the San Onofre Nuclear Generating Station, Unit No. 1, located in San Diego County, California. The amendment was effective as of the date of issuance.
The amendment deletes the requirement to conduct a turbine deck load test every four years and prohibits use of the air pallet system for spent fuel cask handling.
The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations. The Commission has made appropriate findings as required by the Act and the Commission's regulations in 10 CFR Chapter I, which are set forth in the license amendment.
Notice of Consideration of Issuance of Amendment and Opportunity for Hearing in connection with the amendment request, of which this action is a part, was published in the FEDERAL REGISTER on June 24, 1988 (53 FR 23820).
No request for a hearing or petition for leave to intervene was filed following this notice.
SS:@112:304-31 83-81108 PDR ADOCK 05000206 P
PDIC2
-2 The Commission has prepared an Environmental Assessment related to this action and has concluded that an environmental impact statement need not be prepared because operation of the facility in accordance with this amendment will have no significant adverse effect on the quality of the human environment.
For further details with respect to the action see (1) the application for amendment dated April 28, 1988, (2) Amendment No.113 to License No. DPR-13, (3) the Commission's related Safety Evaluation and (4) the Commission's Environmental Assessment. All of these items are available for public inspec tion at the Commission's Public Document Room, 2120 L Street NW., Washington, DC 20555, and at the General Library, University of California, P.O. Box 19557, Irvine, California 92713. A copy of items (2), (3) and (4) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, DC.20555, Attention: Director, Division of Reactor Projects -
III, IV, V and Special Projects.
Dated at Rockville, Maryland this 8thday of November, 1988.
FOR THE NUCLEAR REGULATORY COMMISSION Charles M. Trammell, Senior Project Manager Project Directorate V Division of Reactor Projects -
- III, IV, V and Special Projects Office of Nuclear Reactor Regulation