Amend 71 to License DPR-13,approving Tech Spec Changes Requiring Manual Valves CVS-301 & CVS-313 of Sphere Purge Air Supply & Air Outlet Line,Respectively,To Be Locked During Modes 1-4
ML13316A583
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 02/17/1984
From: Crutchfield D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML13316A582 List:
References
DPR-13-A-071, TAC-52532 NUDOCS 8402230136
Download: ML13316A583 (5)


Text

0 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555 SOUTHERN CALIFORNIA EDISON COMPANY AND SAN DIEGO GAS AND ELECTRIC COMPANY DOCKET NO. 50-206 SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1 AMENDMENT TO PROVISIONAL OPERATING LICENSE Amendment No. 71 License No. DPR-13

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Southern California Edison Company and San Diego Gas and Electric Company (the licensees) dated September 9, 1983 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and.regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

56 (46217 ppA0CK 05o00206 PD

-2

2. Accordinoly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 3.B of Provisional Operating License No.,

DPR-13 is hereby amended to read as follows:

B. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 71, are hereby incorporated in the license. Southern California Edison Company shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Dennis M.CrutchfieldC ief Operating Reactors Bra 5

Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance:

February 17, 1984

ATTACHMENT TO LICENSE AMENDMENT NO. 71 PROVISIONAL OPERATING LICENSE NO. DPR-13 DOCKET NO. 50-206 Revise Appendix A Technical Specifications and Bases by removing the following pages and by inserting the enclosed pages. The revised pages contain the captioned amendment number and marginal lines indicating the area of change.

PAGES 35a 35b

35a 3.6.2 Containment Isolation Valves Applicability: Applies to the containment isolation valves listed in Table 3.6.2-1 for MODES 1, 2, 3, and 4.

Objective:

To provide assurance that containment isolation will function.

when initiated by appropriate sensors.

Specification: A. The containment isolation valves specified in Table 3.6.2-1 shall be OPERABLE.

B. With one or more of the isoaltion valve(s) specified in Table 3.6.2-1 inoperable, maintain at least one isolation valve OPERABLE in each affected penetration that is open and either:

1. Restore the inoperable valve(s) to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, or
2. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one deactivated automatic valve secured in the isolation position, or
3. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of. at least one closed manual valve or blind flange, or
4. Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Basis:

The OPERABILITY of the containment isolation valves ensures that the containment atmosphere will be isolated from the outside environment in the event of a release of radioactive material to the containment atmosphere or pressurization of the containment. Containment isolation ensures that the release of radioactive material to the environment will be con sistent with the assumptions used in the analyses for a LOCA.

The isolation valves of the Sphere Purge Air Supply and Air Outlet lines have not been demonstrated capable of closure under the differential pressures generated by a design basis accident. For this reason, containment isolation in these lines shall be maintained. This configuration shall be accomplished by locking closed manual isolation valves CVS-301 and CVS-313 of these lines. These valves shall remain locked closed during MODES 1, 2, 3, and 4 until they can be demonstrated capable of performing their containment isolation function under post accident conditions.

References:

(1) NRC letter dated July 2, 1980, from D.G. Eisenhut.to all pressurized water reactor licensees.

Amendment No. 71

o

0.

C11 TABLE 3.6.2-1 POWER OPERATED OR AUTOMATIC CONTAINMNT ISOLATION VALVE

SUMMARY

DESCRIPTION INSIDE SPHERE ALIGIMENT*

OUTSIDE SPHERE AL I wl KTI

1. Sphere Sump Discharge CV-102 ISV-10B, 8

CV-103 SVill A

2. RUS Ur 1k Discharge CV-104 SV-110 a

CV-105 1V09)

A

3. RCS Dr Tk Vent CV-106 SV-112 a

CY-1O) (SV-113 A

4. P2 to RCS Drain Tank and PRT CV-536 A

55 a

5. GRS 1211/1212 Sphere CV-147 (SV-1212-1)

B A

Sample Supply A

b. 0MS 1211/1212 Sphere CV-146 (SV-1212-6) a SW12128 Sample Return A
7. A Sta. Gen. St.. Sample Rone SV-120 A
8. 8 Sta. Gen.

St.. Sample kone SV-120 A

9.

C Stm. Gen.

St.. Sample None SV-121 A

.10. A Sta. Gen.

Blowdown Sample None 5V-123 Aa I. 8 Sta. *Gen. Blowdown Sample None SV-122 A

12 C Stm. Gen. Blowdown Sample None SV-124 A

6

13. Service Water to Sphere CV-53 A

B

14. Service Air to Sphere Check Valve SV-72A A
15. SI Loop C Vent SV-7020 A

S-702A 8

16. 51 Loop B Vent SV-702*

A sV-402C

17. PRY Gas Sample CV-948**

A CV-949 S'-99

18. RC Loop Sample (CV-955, CV-956. CV-962)**

A CV-957 SV4~57)

B

20. Sphere Purge Air Supply

A

21. Sphere Purge Air Outlet ***..

POV-10 SV23 A

22. Sphere Equalizing/Sphere Vent CV-116 (SV-27)

B CV-10 SV-28 Inst. Air Vent CV-40 (SV-19)

B CV-534 B

23. Primary Makeup to Press CV-533 A

't. 1k CV-515*

A

24. Cont. Cooling Out 2!. Cont. Cooling In
26. NZ Supply to PORV Check Valve CV-532*
21. Letdown CV-526o A

CV-526' 211.

Seal Water Return CV-527*

A CV4281%6

29. Deleted Logic Hest C. Train A is aligned to power train F; Logic Nest D. Train B is aligned to power train G.

These valves do not receive an automatic containment Isolation signal.

They are operated by remote manual switch (RMS).

      • Manual valves CVS-301 and CVS-313 of the Sphere Purge Air Supply and Air Outlet lines, respectively, shall be locked closed during MODES 1, 2, 3 and 4 in order to ensure that the containment purge lines maintain containment isolation.

Amendment No.