Forwards Enforcement Conference Rept 50-206/91-17 on 910503. Violation Noted.Violation Viewed as Another Example of Larger Issue for Which Enforcement Action Taken
ML13316A075
Person / Time
Site: San Onofre 
Issue date: 05/30/1991
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13316A076 List:
References
EA-91-051, EA-91-51, NUDOCS 9106180175
Download: ML13316A075 (3)


See also: IR 05000206/1991017

Text

p; REGy &t4UNITED

STATES

IV

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIA LANE, SUITE 210

WALNUT CREEK, CALIFORNIA 94596

MAY 3 0 1991

Docket No. 50-206

License No. DPR-13

EA No.91-051

Southern California Edison Company

Irvine Operations Center

23 Parker Street

Irvine, California 92718

Attention: Mr. Harold B. Ray, Senior Vice President, Nuclear

Gentlemen:

This refers to the Enforcement Conference held between Southern California

Edison Company and Region V management at the Region V office on May 3, 1991.

The matters discussed during this conference are described in the enclosed

meeting report. A copy of the conference agenda is also attached.

The purpose of this meeting was to discuss the significance of the misalign

ment of a Unit 1 containment spray flow limiter valve, S1-CRS-CV-518, which

occurred during the cycle refueling X outage. This misalignment was not

discovered until 22 months later, during the Cycle XI refueling outage. This

occurrence was the subject of Special NRC Inspection Report No. 50-206/91-11,

dated April 25, 1991.

Based on the results of our special inspection, as discussed during the

enforcement conference, it appears that one of your activities was not

conducted in full compliance with NRC requirements, as specified in the

enclosed Notice of Violation. Although we consider this violation to have

been a serious lapse in the proper control of safety systems, we view it as

another example of a larger issue for which enforcement action has already

been taken. That issue involved insufficient attention by your staff to the

thorough resolution of safety problems, as addressed by our January 4, 1991

Notice of Violation and Proposed Imposition of Civil Penalties for Unit 2.

In the Unit I case, a questioning attitude was not demonstrated in February

1989 when the redundant valve, CV-517, was found to be in an abnormal confi

guration. If a more inquiring assessment had been conducted at that time,

the misalignment of CV-518 would likely have been detected or prevented.

During this conference you stated that additional analysis had shown that

with valve CV-518 misaligned, sufficient containment spray flow would have

been provided, even if no operator actions were assumed. This conclusion was

subsequently documented in Licensee Event Report (LER)91-001, Revision 3.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. In that you

have submitted a Licensee Event Report (LER 91-001, Revision 3) on this

subject, corrective actions already identified in that document may be

included by reference. After reviewing your response to this Notice and your

discussion in the LER, including your proposed corrective actions, and after

9106160175 910530

PDR

ADOCK 05000206

PDR

-2

considering the results of future inspections, the NRC will determine whether

further NRC enforcement action is necessary to ensure compliance with NRC

regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter, the enclosures, and your response will be placed in the NRC

Public Document Room.

The response directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

R. P. Zimmerman, Direct r

Division of Reactor Safety

and Projects

Enclosures:

1. Notice of Violation

2. Meeting Report No. 50-206/91-17, with Attachment

3. Conference Agenda

cc w/Enclosures:

H. E. Morgan, Vice President and Site Manager (San Clemente)

R. W. Krieger, Station Manager (San Clemente)

State of California

-3

bcc w/copy of enclosures:

Docket File

Project Inspector

Resident Inspector

G. Cook

B. Faulkenberry

J. Martin

J. Lieberman

A. Johnson

P. Johnson

G. Kalman, NRR

L. Kokajko, NRR

J. Bradfute, NRR

J. Caldwell, OEDO

bcc w/Enclosure 1:

M. Smith

N. Western

J. Zollicoffer

REGION V

T nd

)a

C

1

PJ ,

n

SRichards

Ado

on

5/2/91

fe5/v/91

5/7-&

1

5/98 /91

5/

/91

UEST COPY ] REMEST COPY ]R

EST COPY ] gEWEST COPY ] REQUEST

YES

/ NO

]LYES) /

NO

0

YS/

NO

YES)/ NO

1YES

KPerk s

RZimmermae'

<

5/60 / q,5/30/91

REQUEST

] REQUEST

]

YES

1 YES

/.%0/

]

TO PDR

YES

NO