ML13312A122

From kanterella
Jump to navigation Jump to search
Correction of an Error in License Amendment Request Regarding Changes to Technical Specification 3/4.9.16, Shielded Cask
ML13312A122
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/31/2013
From: Mark D. Sartain
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML13312A122 (2)


Text

Dominion Nuclear Connecticut, Inc.

  • Dominion 5000 Dominion Boulevard, Glen Allen, VA 23060 Web Address: www.dom.com October 31, 2013 U.S. Nuclear Regulatory Commission Serial No. 13-056A Attention: Document Control Desk NSSL/MAE RO Washington, DC 20555 Docket No. 50-336 License No. DPR-65 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 2 CORRECTION OF AN ERROR IN LICENSE AMENDMENT REQUEST REGARDING CHANGES TO TECHNICAL SPECIFICATION 314.9.16, "SHIELDED CASK."

By letter dated April 3, 2013 (Agencywide Documents Access and Management System Accession No. ML13102A133), Dominion Nuclear Connecticut, Inc. submitted a license amendment request (LAR) to revise Technical Specification 3.9.16 "Shielded Cask," due to changes to the minimum decay time for fuel assemblies adjacent to the spent fuel pool cask laydown area for Millstone Power Station, Unit 2.

The purpose of this letter is to correct an error on the marked-up technical specification page provided in Attachment 2 of the LAR. Paragraph numbers 3.19.16 and 4.19.16 in the rectangular boxes in Attachment 2 are incorrect. The correct numbers are 3.9.16 and 4.9.16.

Should you have any questions in regard to this submittal, please contact Wanda D. Craft at (804) 273-4687.

Sincerely, Mark D. Sartain Vice President - Nuclear Engineering and Development Notary Public Commonwealth of Virginia 140542 COMMONWEALTH OF VIRGINIA ) My Commission Expires May 31. 2014 COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain, who is Vice President - Nuclear Engineering and Development of Dominion Nuclear Connecticut, Inc.

He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this 3/!'day of _ AeAL.,2013.

My Commission Expires: 5,- 3/ - ,"_"

Nofary Public

Serial No. 13-056A Docket No. 50-336 Page 2 of 2 Commitments made in this letter: None Attachments: None cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 James S. Kim Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C2A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station Director Bureau of Air Management Monitoring and Radiation Division Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127