NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIA BOULEVARD
.
SUITE 202, WALNUT CREEK PLAZA
WALNUT CREEK, CALIFORNIA 94596
Docket Nos. 50-361
50-362
Southern California Edison Company
P. 0. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention:
Mr. J. B. Moore
Vice President
Gentlemen:
Subject: NRC Inspection at San Onofre Units 2 and 3
This refers to the inspection conducted by Messrs. R. J. Pate, W. G. Albert
and J. 0. Elin of this. office during the period June 1-30, 1979, of activities
authorized by NRC Construction Permit Nos. CPPR-97 and CPPR-98, and to the
disccusion of our findings held with Mr. D. E. Nunn and other members of your
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and obser
vations by the inspectors.
No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room. If this
report contains any information that you believe to be proprietary, it is necessary
that you submit a written application to this office, within 20 days of the date
of this letter, requesting that such information be withheld from public disclos
ure. The application must include a full statement of the reasons why it is
claimed that the information is proprietary.
The application should be prepared
Southern California Edison Company
-2-
JUL 3 1 179
so that any proprietary information identified is contained in an enclosure to
the application, since the application without the enclosure will also be placed
in the Public Document Room. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincerely,
G. S. Spencer, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection Report
Nos. 50-361/79-19
50-362/79-19
cc w/o enclosure:
J. H. Drake, Vice President
Engineering & Construction, SCE