Forwards IE Insp Repts 50-361/78-20 & 50-362/78-16 on 781201-29.No Noncompliance Noted
ML13309A606
Person / Time
Site: San Onofre  
Issue date: 01/25/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Johari Moore
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13309A607 List:
References
NUDOCS 7903120488
Download: ML13309A606 (2)


See also: IR 05000361/1978020

Text

U NITED

STATES

NUCLEAR

REGULATORY

COMMISSION

REGION V

SUITE 202, WALNUT CREEK PLAZA

.v2-

P

01990

N. CALIFORNIA BOULEVARD

WALNUT CREEK, CALIFORNIA

94596

JAN 2~

S'979

Docket Nos. 50-361

50-362

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California

91770

Attention: Mr. J. B. Moore

Vice President

Gentlemen:

Subject:

NRC ITspection at San Onofre Units 2 and 3

This refers to the inspections conducted by Mr. R. J. Pate of this

office during the period December 1-29, 1978 of activities authorized by

NRC Construction Permit Nos. CPPR-97 and 98, and to the discussions of

his findings held with Mr. H. B. Ray and other members of your staff on

December 8 and 15, 1978.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the.inspection consisted of

selective examinations of procedures and representative records, inter

views with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 20 days of the date of this letter, requesting

.that

such information be withheld from public disclosure. The applica

tion must include a full statement of the reasons why it is claimed that

the information is proprietary. The application should be prepared so

7903120

Southern California Edison Company

-2-

JAN

o 5

y

that any proprietary information identified is contained in an enclosure

to the application, since the application without the enclosure will

also be placed in the Public Document Room. If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

G. S.

pencer, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report

Nos. 50-361/78-20

50-362/78-16

cc w/o enclosure:

J. H. Drake, Vice President

Engineering & Construction, SCE