Forwards IE Inspec Repts 50-361/78-13 & 50-362/78-10 on 780918-22 & Notice of Violation
ML13309A588
Person / Time
Site: San Onofre  
Issue date: 10/24/1978
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Johari Moore
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13309A589 List:
References
NUDOCS 7812110237
Download: ML13309A588 (4)


See also: IR 05000361/1978013

Text

.pR REGU

UNITED STATES

0

NUCLEAR REGULATORY COMMISSION

0

REGION V

Ln

SUITE 202, WALNUT CREEK PLAZA

1990 N. CALIFORNIA BOULEVARD

WALNUT CREEK, CALIFORNIA 94596

OCT 2 4 EUS

Docket Nos. 50-361

50-362

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention:

Mr. J. B. Moore, Vice President

Gentlemen:

Subject:. NRC Inspection - San Onofre Units 2 and 3

This refers to the inspection conducted by Messrs. R. J. Pate, J. H. Eckhardt,

G. Hernandez and P. P. Narbut of this office on September 18-22, 1978 of

activities authorized by NRC Construction Permit Nos. CPPR 97 and 98,

and to the discussion of our findings held by Mr. Pate with Mr. H. B. Ray

and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, in

terviews with personnel, and observations by the inspectors.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix A.

These items of noncompliance have been categorized into a level as de

scribed in our correspondence to all NRC licensees dated December 31,

1974.

This notice is sent to you pursuant to the provisions of Section 2.201,

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office,

within thirty (30) days of your receipt of this notice, a written state

ment or explanation in reply including (1) corrective steps which have

been taken by you and the results achieved; (2) corrective steps which

will be taken to avoid further violations; and (3) the date when full

compliance will be achieved.

78'/2 1/o2-.7

.

OCT 24

Southern California Edison Company

-2

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 30 days of the date of this letter, requesting

that such information be withheld from public disclosure. The applica

tion must include a full statement of the reasons why it is claimed that

the information is proprietary. The application should be prepared so

that any proprietary information identified is contained in an enclosure

to the application, since the application without the enclosure will

also be placed in the Public Document Room. If we do not-hear from you

in this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

G. S. Spe cer, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

A.

Notice of Violation

B. IE Inspection Report

Nos. 50-361/78-13

50-362/78-10

cc w/o enclosure B:

J. H. Drake, Vice President

Engineering and Construction, SCE

UNITED

STATES

NUCLEAR REGULATORY

COMMISSION

REGION V

SUITE 202, WALNUT CREEK PLAZA

1990 N. CALIFORNIA BOULEVARD

WALNUT CREEK, CALIFORNIA 94596

OCT 2 4 US

Docket Nos.

361

r~~rS ~

17

-1777

77j

tid

62

Southern California Edison Company

P. 0. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention: Mr. J. B. Moore, Vice President

Gentlemen:

Subject: NRC Inspection -

San Onofre Units 2 and 3

This refers to the inspection conducted by Messrs. R. J. Pate, J. H. Eckhardt,

G. Hernandez and P. P. Narbut of this office on September 18-22, 1978 of

activities authorized by NRC Construction Permit Nos. CPPR 97 and 98,

and to the discussion of our findings held by Mr. Pate with Mr. H. B. Ray

and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, in

terviews with personnel, and observations by the inspectors.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix A.

These items of noncompliance have been categorized into a level as de

scribed in our correspondence to all NRC licensees dated December 31,

1974.

This notice is sent to you pursuant to the provisions of Section 2.201,

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office,

within thirty (30) days of your receipt of this notice, a written state

ment or explanation in reply including (1) corective steps which have

been taken by you and the results achieved; (2) corrective steps which

will be taken to avoid further violations; and (3) the date when full

compliance will be achieved.

78121109-37

Q

OCT 2 4 ~'

Southern California Edison Company

-2

In accordance with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 30 days of the date of this letter, requesting

that such information be withheld from public disclosure. The applica

tion must include a full statement of the reasons why it is claimed that

the information is proprietary. The application should be prepared so

that any proprietary information identified is contained in an enclosure

to the application, since the application without the enclosure will

also be placed in the Public Document Room. If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

G. S. Spe

er, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

A. Notice of Violation

B. IE Inspection Report

Nos. 50-361/78-13

50-362/78-10

cc w/o enclosure B:

J. H. Drake, Vice President

Engineering and Construction, SCE