ML13309A348
| ML13309A348 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 11/03/1992 |
| From: | Quay T Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML13309A347 | List: |
| References | |
| DPR-13-A-151 NUDOCS 9211100391 | |
| Download: ML13309A348 (6) | |
Text
jkREG 14a UNITED STATES NUCLEAR REGULATORY COMMISSION o
WASHINGTON, D.C. 20558 SOUTHERN CALIFORNIA EDISON COMPANY SAN DIEGO GAS AND ELECTRIC COMPANY DOCKET NO. 50-206 SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 151 License No. DPR-13
- 1.
The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A.
The application for amendment by Southern California Edison Company (the licensee) and the San Diego Gas and Electric Company dated September 16, 1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-13 is hereby amended to read as follows:
9211100391 921103 PDR ADOCK 05000206 P
-2 (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 151, are hereby incorporated in the license.
Southern California Edison Company shall operate the facility in accordance with the Technical Specifications.
- 3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Theodore R. Quay, Director Project Directorate V Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
November 3, 1992
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 151 TO FACILITY OPERATING LICENSE NO. DPR-13 DOCKET NO. 50-206 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by the captioned amendment number and contain marginal lines indicating the areas of change.
REMOVE INSERT i
i iii iii 4.2-1 4.2-1
APPENDIX A TECHNICAL SPECIFICATIONS LIST OF EFFECTIVE PAGES Page Amendment No.
Page Amendment No.
Page Amendment No.
i 147, 148, 151 2.1-4 43, 117, 121, 122, 3.1-23 83, 130 ii 148 130 3.2-1 102, 130 iii 151 2.1-5 43, 97, 117, 121, 3.2-2 25, 102, 130 iv 139, 145 122, 130 3.3-1 25, 37, 86, 124 v
90, 130, 131 2.1-6 55, 130 130, 146 vi 90, 130, 131, 145 3.0-1 43, 56, 64, 83 3.3-2 25, 130, 146 vii 90, 102, 130, 131 130 3.3-3 25, 38, 86, 124, 145 3.0-2 56, 64, 83, 130, 130, 142, 146 viii 90, 130, 131, 145 135 3.3-4 25, 37, 124, 130, 146 ix 90, 91, 102, 130 3.0-3 135 3.3-5 25, 130, 146 131, 145 3.0-4 135 3.3-6 25, 102, 120, 130 x
90, 91, 130, 131 3.1-1 29, 38, 70, 83, 3.3-7 25, 102, 130 145 91, 96, 130 3.3-8 25, 38, 122, 130, 148 xi 55, 92, 102, 110, 3.1-2 29, 83, 96, 130 3.3-9 25, 38, 122, 130, 148 111, 130, 131, 143 3.1-3 43, 77, 103, 130 3.3-10 25, 130 xii 56, 58, 71, 79, 3.1-4 77, 130 3.3-11 NRC Order 83, 104, 117, 130, 3.1-5 77, 125, 130 4/20/81, 130 131, 143, 145 3.1-6 77, 102, 130 3.3-12 NRC Order xiii 31, 56, 58, 79, 3.1-7 77, 102, 103, 130 4/20/81, 130 83, 84, 91, 117, 3.1-8 43, 102, 103, 130 3.4-1 29, 82, 125, 130 130, 131, 143, 145 3.1-9 77, 102, 130 3.4-2 29, 130 xiv 131, 143, 145 3.1-10 Change No. 14, 38, 3.4-3 82, 125, 130, 138 xv 143 102, 130 3.4-4 82, 125, 130, 138 1.0-1 31, 56, 59, 83, 3.1-11 Change No. 14, 38, 3.5-1 83, 117, 130, 143 117, 130 102, 130 3.5-2 43, 56, 58, 83, 1.0-2 31, 56, 59, 83, 3.1-12 Change No. 14, 92, 117, 128, 130 104, 117, 130 130 3.5-3 43, 56, 58, 83, 1.0-3 31, 56, 59, 79, 3.1-13 Change No. 14, 92,
- 117, 121,
- 122, 83, 104, 117, 130, 130 130, 143 145 3.1-14 Change No. 14, 3.5-4 55, 58, 83, 117, 1.0-4 31, 56, 59, 79, 102, 130 118, 121, 128, 130 83, 117, 130, 145 3.1-15 Change No. 14, 3.5-5 83, 117, 130 1.0-5 77, 79, 83, 117, 102, 130 3.5-5a 143 130, 145 3.1-16 Change No. 14, 3.5-5b 143 1.0-6 79, 83, 96, 117, 102, 130 3.5-5c 143 130 3.1-17 Change No. 14, 3.5-6 7, 11, 25, 35, 55, 1.0-7 58, 83, 117, 130 102, 130 56, 111, 130, 148 1.0-8 56, 83, 117, 130 3.1-18 Change No. 7, 37, 3.5-7 7, 11, 25, 35, 49, 2.1-1 43, 55, 97, 117, 55, 91, 119, 130 55, 56, 111, 122, 130 3.1-19 Change No. 7, 55, 130, 148 2.1-2 43, 97, 117, 121, 119, 130 3.5-8 11, 49, 111, 122, 130 3.1-20 37, 55, 119, 130 130, 148 2.1-3 43, 117, 121, 122, 3.1-21 58, 59, 83, 130 3.5-9 11, 25, 56, 111, 130 3.1-22 58, 130 130 SAN ONOFRE -
UNIT 1 i
AMENDMENT NO. 151
00 LIST OF EFFECTIVE PAGES (Cont.)
Page Amendment No.
Page Amendment No.
Page Amendment No.
4.1-10 117, 130 4.3-6 75, 87, 130 4.14-4 21, 63, 81, 105, 4.1-11 25, 130 4.3-7 58, 130 130 4.1-12 Change No. 5, 25, 4.3-8 58, 59, 83, 130 4.15-1 31, 37, 38, 44, 130 4.3-9 58, 83, 130 130, 131 4.1-13 79, 130, 145 4.4-1 Change No. 12, 25, 4.15-2 31 44, 130, 131 4.1-14 79, 130, 145 56, 82, 84, 95, 4.15-3 31, 130, 131 4.1-15 58, 130, 145 104, 123, 130, 136, 4.15-4 130, 131 4.1-16 58, 130, 145 147 4.15-5 130, 131 4.1-17 58, 130, 145 4.4-2 25, 84, 130, 136 4.15-6 31, 130, 131 4.1-18 58, 83, 130, 145 4.4-3 25, 56, 82, 84, 4.15-7 31, 130, 131 4.1-19 58, 83, 117, 125, 117, 130, 134, 136 4.15-8 130, 131 130, 145 4.4-4 25, 82, 84, 95, 4.15-9 130, 131 4.1-20 58, 109, 130, 145 104, 123, 124, 130, 4.15-10 130, 131 4.1-21 58, 130, 145 134, 136, 143, 147 4.15-11 130, 131 4.1-22 58, 82, 125, 130, 4.4-5 84, 130, 136, 147 4.15-12 130, 131 145 4.4-6 25, 56, 84, 104, 4.16-1 31, 101, 115, 130, 4.1-23 58, 82, 125, 130, 123, 130, 136, 147 133 145 4.4-7 25, 56, 84, 130, 4.16-2 37, 101, 115, 130, 4.1-24 65, 82, 125, 130, 134, 136 133, 149 145 4.4-8 136, 147 4.16-3 37, 101, 115, 130, 4.1-25 65, 125, 130, 4.4-9 136, 147 133 Revised by NRC 4.4-10 136, 147 4.16-4 37, 55, 101, 115, letter 2/12/92, 145 4.4-11 147 130, 133 4.1-26 82, 130, 145 4.5-1 Change No. 10, 38, 4.16-5 37, 91, 101, 105, 4.1-27 83, 130, 145 79, 130, 145 115, 130, 133 4.1-28 83, 130, 145 4.6-1 38, 79, 130, 145 4.17-1 79, 130, 145 4.1-29 83, 130, 145 4.6-2 79, 130, 145 4.18-1 79, 130, 145 4.1-30 119, 130, 145 4.6-3 79 130, 145 4.19-1 79, 105, 130, 145 4.1-31 119, 130, 145 4.6-4 79, 130, 145 4.20-1 102, 130 4.2-1 25, 37, 54, 114, 4.6-5 79, 130, 145 5.1-1 25, 72, 130 130, 151 4.6-6 79, 130, 145 5.1.2 72, 79, 130 4.2-2 25, 37, 114, 130 4.7-1 Change No. 14, 46, 5.2-1 72, 130 4.2-3 25, 37, 114, 130 130 5.2-2 72, 130 4.2-4 25, 37, 114, 124, 4.8-1 91, 130 5.2-3 72, 130 130 4.9-1 Change No. 14, 130 5.3-1 3, 72, 130 4.2-5 25, 37, 114, 124, 4.9-2 130 5.3.2 3, 37, 72, 130 130 4.10-1 13 94, 130 5.4-1 130 4.2-6 37, 114, 130 4.10-2 13, 94, 130 6.1-1 12, 39, 66, 4.2-7 NRC Order 4.11-1 14 109, 130 91, 130 4/20/81, 54, 130 4.11-2 14, 109, 130 6.2-1 44, 66, 91 4.3-1 24, 58, 75, 130 4.12-1 91, 130, Revised 110, 130 4.3-2 5, 24, 58, 75, 87, by NRC letter 6.2-2 88, 91, 130 118, 130 2/12/92 6.2-3 66 88, 91, 4.3-3 24, 58, 87, 118, 4.13-1 18, 113, 105, 110, 126, 130 130 130 4.3-4 24, 87, 130 4.14-1 21, 33, 63, 81, 6.2-4 12, 58, 91, 130 4.3-5 24, 75, 87, 130 130 4.14-2 21, 63, 81, 130 4.14-3 21, 63, 81, 130 SAN ONOFRE -
UNIT 1 CAMENDMENT NO. 151
4.2 SAFETY INJECTION AND CONTAINMENT SPRAY SYSTEM 4.2.1 SAFETY INJECTION AND CONTAINMENT SPRAY SYSTEM PERIODIC TESTING APPLICABILITY: Applies to testing of the Safety Injection System and the Containment Spray System.
OBJECTIVE:
To verify that the Safety Injection System and the Containment Spray System will respond promptly and properly if required.
SPECIFICATION:
I. System Tests A. Hot Safety Injection System Test**
(1) When the plant is planned to be shutdown from MODE 1 operation and is planned to enter MODE 5 operation, a Hot SIS Test shall be performed in MODE 3 while RCS pressure is above 1500 psi but not more often than once every 9 months. The test shall include a deter mination of the force required to open valves HV-851A and B and the margin of available actuation force.
(2) The test will be considered satisfactory if:
(a) control board indication and visual observations indicate all components have operated and sequenced properly. That is, the appropriate pumps have started and/or stopped and started, and all valves have completed their travel.
(b) the measured actuator force for both the HV-851 A and B valves is equal to or less than 10,000 lb f.*
(3) If the measured actuator force of either HV-851 A or B is between 10,000 and 22,000 lbf, the HV-851 A and B valves shall be considered OPERABLE but the future testing interval shall be accelerated as determined by the following equation:
- Upon receipt of satisfactory data from continuing testing and analysis, the NRC staff will consider a request from Southern California Edison Company to change this number to more accurately reflect existing conditions.
- An exemption to this Specification is authorized for the shutdown at the end of Cycle 11 in 1992.
SAN ONOFRE - UNIT 1 4.2-1 AMENDMENT NO. 25, $7, 50, 114, 1$0, 151