ML13308B416

From kanterella
Jump to navigation Jump to search
Amend 77 to License DPR-13 Changing Tech Specs Re Administrative Controls & Ets.Certificate of Svc Encl
ML13308B416
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 04/18/1979
From:
Southern California Edison Co
To:
Shared Package
ML13308B415 List:
References
NUDOCS 7904230177
Download: ML13308B416 (12)


Text

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION Application of SOUTHERN CALIFORNIA EDISON COMPANY and SAN DIEGO GAS & ELECTRIC COMPANY for a Class 104(b) License to Acquire,

)

DOCKET NO. 50-206 Possess, and Use a Utilization Facility as Part of Unit No. 1 of the San Onofre Nuclear

)

Amendment No. 77 Generating Station SOUTHERN CALIFORNIA EDISON COMPANY AND SAN DIEGO GAS & ELECTRIC COMPANY, pursuant to 10 CFR 50.90, hereby submit Amendment No. 77.

This amendment consists of Proposed Change No. 77 to the Technical Specifications incorporated in Provisional Operating License No. DPR-13 as Appendices A and B.

Proposed Change No. 77 would incorporate station and corporate reorganization changes into the appropriate Administrative Controls Sections of the Appendix A Technical Specifications and Appendix B Environmental Technical Specifications.

In the event of conflict, the information in this Amendment No. 77 supersedes the information previously submitted.

In our opinion, the proposed change does not present significant hazards considerations not described or implicit in the Final Safety Analysis and there is reasonable assurance that the health and safety of the public will not be endangered by the proposed change.

7904230 171

-2 Pursuant to 10 CFR 170.22, Proposed Change No. 77, submitted as Amendment No. 77, is determined to be a Class II change.

The basis for this determination is that the change is administrative in nature.

Accordingly, the fee of $1,200.00 corresponding to this determination is remitted herewith as required by 10 CFR 170.22.

Subscribed on this 4

day of

, 1979 Respectfully submitted, SOUTHERN CALIFORNIA EDISON COMPANY By J.

H.

Drak~e Vice Preside

Charles R. Kocher James A. Beoletto Attorneys for Southern California Edison Company By CC__

Subscribed and swor to before me this

/

day of

, 1979.

-7 or OFFICIAL SEAL AGNESCRABTREE NOTARY PUBLIC - CALIFORNIA PRINCIPAL OFFICE IN LOS ANGELES COUNTY Notarg/Public in and for the County of

'm MyCommissionExp.Aug.27,1982 Los Angeles, State of California My Commission Expires

?7

/_f,2,_.

SAN DIEGO GAS & ELECTRIC COMPANY By David R. Pigott Subscribed and sworn to before me this Samuel B. Casey p

day of March 1979.

Chickering & Gregory Attorneys for San Diego Gas & Electric Company Notary Pu 11c in and for the City and County of San Diego, Californ By __

My Commission Expires July 25, 1981 OFFICIAL SEAL ANGELA B. SNYDER i0TARY PUBLIC - CALIFORNIA Principal Office. San Diego Co. Calif.

My Commission Exp. July 25, 1981

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of SOUTHERN CALIFORNIA EDISON COMPANY and SAN DIEGO GAS & ELECTRIC )

Docket No. 50-206 COMPANY (San Onofre Nuclear Generating Station Unit No. 1)

CERTIFICATE OF SERVICE I hereby certify that a copy of Amendment No. 77 was served on the following by deposit in the United States Mail, postage prepaid, on the 18th day of April 1979.

Henry J. McGurren, Esq.

Staff Counsel U. S. Nuclear Regulatory Commission Washington, D.C.

20545 David R. Pigott Samuel B. Casey Chickering & Gregory Three Embarcadero Center San Francisco, California 94111 I. R. Caraco Bechtel Corporation P. 0. Box 60860, Terminal Annex Los Angeles, California 90060 Michael L. Mellor, Esq.

Thelen, Marrin, Johnson & Bridges Two Embarcadero Center San Francisco, California 94111 Norman B. Livermore Secretary for Resources State of California 1416 Ninth Street Sacramento, California Richard D. Gravelle, General Counsel California Public Utilities Commission 5072 State Building.

San Francisco, California 94102

-2 J.

Rengel Atomic Power Division Westinghouse Electric Corporation Box 355 Pittsburgh, Pennsylvania 15230 A. E. Gaede P. 0. Box 127 San Clemente, California 92672 William R. Johnson,.Secretary California Public Utilities Commission 5050 State Building San Francisco, California 94102 Charles R. Kocher Assistant General Counsel Southern California Edison Co..

-4).

DESCRIPTION OF PROPOSED CHANGE AND SAFETY AND ENVIRONMENTAL ANALYSIS PROPOSED CHANGE NO.

77 TO THE TECHNICAL SPECIFICATIONS PRDVISIONAL OPERATING LICENSE DPR-13 This is a request to revise Technical Specification 6.5.1.2 and Figures 6.2.1.1, 6.2.2.2 arid 6.2.3.1 of Appendix A and Environmental Technical Specification 5.3.1 and Figures 5.2-1 and 5.2-2 of Appendix B.

REASON FOR PROPOSED CHANGE This proposed change would incorporate station and corporate reor ganization changes into the appropriate Administrative Controls Sections of the Appendix A Technical Specifications and Appendix B Environmental Tech nical Specifications.

EXISTING SPECIFICATIONS The existing sections and figures within Technical Specifications 6.0 and Environmental Technical Specifications 5.0 are as constituted in the Apoendices A and B Technical Specifications, respectively, for San Onofre Unit 1.

PROPOSED SPECIFICATIONS Both Section 6-5 of Appendix A and Section 5.3 of Appendix B would be revised by deleting the Watch Engineer as a member of the OSRC and adding the Supervisor of Plant Operations.

Appendix A, Section 6.5.1.2, would be revised as follows:

6.5.1.2 The OSRC shall be composed of the following:

Chairman:

Plant Manager Member:

Superintendent Member:

Supervising Engineer Member:

Supervisor of Plant Operations Member:

Supervisor of Plant Instrumentation Member:

Supervisor of Chemistry & Radia tion Protection Member:

Supervisor of Plant Maintenance Member:

Nuclear Engineer Member:

San Diego Gas & Electric Representative Revised Figure 6.2.2.2 is attached.

Also attached are revised Figures 6.2.1.1 and 6.2.3.1 reflecting corporate level changes.

gropoed Change No. 77 The balance of Technical Specification 6.0 would remain unchanged.

Appendix B, Section 5.3, would be revised as follows:

a. Membership (1) Plant Manager (Chairman)

(2)

Superintendent (3)

Supervising Engineer (4)

Supe-visor of Plant Operations (5)

Supervisor of Plant Instrumentation (6)

Supervisor of Chemical & Radiation.Protection (7)

Supervisor of Plant Maintenance (8)

Nuclear Engineer (9)

San Diego Gas & Electric Representative Revised Figures 5.2-2 and 5.2-1 are attached.

The balance of Technical Specification 5.0 would remain unchanged.

SAFETY AND ENVIRONENTAL FINDING The proposed changes to the Technical Specifications described herein are administrative in nature and will have no detrimental impact on the environment, nor do they involve an unreviewed safety question as defined in 10 CFR 50.59.

GTMd20a

FIURE 6.2.1.1 OFFSITE ORGANIZATION CHAIRMAN OF THE BOARD PRESIDENT SENIOR VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PR SIDENT VICE PRESIDENT NUC (FUEL SUPPLY (P&OER SUPPLY)

(SYSTEM (ENGINEERING &

(ADVANCED CONTOL DEVEL)PMENT)

CONSTRUCTION)

ENGINEERING)

BOARD

  • GENERAL NUCLEAR SUPERINTENDENT AUDIT AND REVIEW MANAGER OF MANAGER OF MANAGER OF COMlITEE STEAM GENERATION ENVIR)NMENTAL ENGINEERING DESIGN AFFAIRS MANAGER OF GENERATION ENGINEERING SERVICES HEADUARTEPS
MANAGER, CHIEF OF CHIEF OF
MANAGER, STAFF NUCLEAR GENERATION NUCLEAR DEVELOPMENT AND QUALITY NGINEERING ENVIRONMENTAL ASSURANCE ENGINEERING

=

=

rma_

_ a m

m__m mm G m m

STATION PLANT d - ITE STAF

.MANAGER REVIEW

FICURE 6.2.2.2 FACILITY ORGANIZATION PLANT MANAGER SUPE RINTENDENT STkIION SUPE VI SING ADMINISTATIVE ENGINEER SUPERVISOR SUPERVISOR OF NUCLEAR PIANT SECURITY ENGINEERS ADMINISTRATIVE SECURITY STAFF

'STAFF SUPERVISOR SUPERVISOR SUPERVISOR SUPERVISOR OF PLANT OF CHEM &

OF. PLANT OF PLANT MAINTENANCE PAD PROTECTION INSTRUMENTATION OPEPARIONS*

CHEM RAD WATCH.

PROT ENGINEERS ENGINEERS*,

CHEM RAD OPERATING*

FOREMAN PPDT FOREMAN FOREMAN FOREMAN TRAINING ADMINISTRATOR MAINTENANCE CHEM RAD INSTRUMENT-PLANT PERSONNEL PROTECTION TEST TECHNICIANS OPERATORS**

Senior Reactor Operator License Required Control and Assistant Control Operators are holders of Reactor Operator Licenses

Vice President Power Supply Department General General Corporate Fire Superintendent Superintendent Prevention Committee Administrator of Power. Supply Department Manager oP Services Steam Generation Fire Control and

Manager, Nuclear Generation Conservation RepresentativeN a

HEADQUARTERS n~ M Iem M=m--ma E amman m anm m f 1EI EM pm FIELD Plant Manager Fire Equipment Superintendent Inspectors San Onofre Unit 1 Station Supervisor Station Fire Brigade Plant Maintenance Fire Committee FIGURE 6.2.3.1 FIRE PROTECTION STAFF AND LINE ORGANIZATIONS 6-5b

PLANT MANAGER.

SUPERINTENDENT STATION I

SUPERVISING ADMINISTRATIVE ENGINEER SUPERVISOR SUPL iSOR OF NUCLEAR PLANT SECURITY ENGINEERS ADMINISTRATIVE SECURITY STAFF STAFF SUPERVISOR SUPERVI.SOR SUPERVISOR SUPERVISOR OF PLANT OF CHEN &

OF PLANT OF PLANT MAINTENANCE PAD PROTECTION INSTRUOIENTATION OPERAmIONS*

CHEM RAD WATO PROT ENGINEERS ENGINEERS*T CHEM RAD OPERATING*

FOREM-IAN PROT FOREMAN FORE AN FOREMAN TRAINING ADMINISTRATOR MAINTENANCE CHEM RAD INSTRUMENT-PLANT PERSONNEL PROTECTION TEST TECHNICIANS OPERATORS**

Senior Reactor Operator License Required Control and Assistant Control Operators are holders of Reactor Operator Licenses FIGURE 5.2-2 SAN ONORE NUCLEAR G ERATING STATION (UNIT 1)

ORGANIZATION

CHAIRNAN OF THE BOARD PRESIDENT 5 ~

~

~

~

m um mmn mm no xm ma ac mc rnm SENIOR VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT VICE PRESIDENT NU (FUEL SUPPLY (POWER SUPPLY)

(SYSTEM (ENGINEERING &

(ADVANCED COTROL DEVELDPMENT)

CONSTRUCTION)

ENGINEERING)

BOARD GENERAL NUCLEAR SUPERINTENDENT AUDIT AND REVI EW MANAGER OF MANAGER OF MANAGER OF COMMITTEE STEAM GENERATION ENVIRONMENTAL ENGINEERING DESIGN AFFAIRS MANAGER OF GENERATION ENGINEERING SERVICES HEADQUARPRS

MANAGER, CHIEF OF CHIEF OF
MANAGER, STAFF NUCLEAR GENERATION NUCLEAR DEVELOPMENT AND QUALITY ENGINEERING ENVIRONMENTAL ASSURANCE ENGINEERING STATIOE PLANTE STAFF MANAGER

,E7 Q'4 FIGURE 5.2-1 SOUTHERNT CALIFORNIA EDISON COMIPANY CORPORATE ORGANIZATION'