Informs of Issuance of Encl Div of Licensing Order Confirming Licensee Commitment to Maintain Shutdown Condition Until Completion of Seismic Mods & Until NRC Approval for Restart Obtained,Per 820615 & 24 Submittals
ML13308A786
Person / Time
Site: San Onofre 
Issue date: 08/06/1982
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Nader R
CENTER FOR PROGRESSIVE LAW
Shared Package
ML13308A785 List:
References
NUDOCS 8208170348
Download: ML13308A786 (3)


Text

DISTRIBUTION Docket JMurray NRC PDR A&hejacd V Local PDR ACRS (10)

ORB Reading NSIC Docket No. 50-206 EDO Reading SEPB HDenton LBickwit ECase SChilk DEisenhut TRehm TNovak KCornell JHeltemes SHanauer Mr. Ralph Nader DCrutchfield RVollmer Center for Progressive Law HSmith BSnyder Post Office Box 19367 WPaulson Washington, D. C. 20036 OELD (Chandler/Burns)

OI&E

Dear Mr. Nader:

CMiles RE:

SOUTHERN CALIFORNIA EDISON COMPANY SCavanaugh (San Onofre Nuclear Generating Station, Unit No. 1)

By letter dated November 16, 1981, in response to your letter of July 10, 1981, I informed you that this office determined not to issue an order sus pending or revoking License No. DPR-13, which authorizes Southern California Edison Company to operate San Onofre Nuclear Generating Station, Unit No. 1.

My-letter enclosed "Director's Decision Under 10 CFR Section 2.206" and it also enclosed the Decision under 10 CFR 2.206 pertaining to petitions filed by California residents which also requested that the Nuclear Regulatory Commission suspend or revoke the operating license for San Onofre Unit 1.

The Decision pertaining to petitions filed by California residents included an interim NRC staff report regarding the seismic capability of San Onofre Nuclear Generating Station, Unit 1.

After additional evaluation by the NRC staff and the licensee, the licensee informed the staff by letter dated June 15, 1982, that the licensee would extend its current outage pending completion of necessary modifications to upgrade the seismic capability of the facility. Because of the importance of this commitment to public health and safety the enclosed confirmatory order has been issued, which requires that San Onofre Unit I be maintained in the shutdown condition until modificationsd7scirbed in Southern California Edison's submittal dated-June 15, 1982 as supplemented by letter dated June 24, 1982,are completed and NRC approval is obtained for restart.

NRR: D/DIR NRR: DIR Sincerely, ECase HDenton

/ /82

/

/82 Harold R. Denton, Director Officeof Nuclear Reactor Regulation

Enclosure:

6208170348 820811 Order PDR ADOCK 05000206 P

PDR

  • SEE PREVIOUS TISSUE FOR CONCURRENCE OFFICE DL:.B D

RB..#...

OELOBD*

DL: SEPB*

DL:OR.. 5:..

D DIR HSmith:cc WPaulson SBurns WRussell DCrutchfield GLa-inas lisenhut 7/98 17/19/82 7/19/82...

/82 DAT O 31 0.24..........

/240 /82ICIAL RECORD COP.U2PO 181-2 NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COP Y USGPO: 1981-335-960

DISTRIBUTION Docket SCavanaugh NRC PDR JMurray Local PDR AShepard ORB Reading ACRS (10)

Docket No. 50-206 EDO Reading NSIC HDenton SEPB ECase LBickwit DEisenhut SChilk Mr. Ralph Nader TNovak TRehm Center for Progressive Law JHeltemes KCornell Post Office Box 19367 DCrutchfield SHanauer Washington, 0. C. 20036 HSmith TMurley WPaulson RVollmer

Dear Mr. Nader:

0ELD(Chdly/60ms) BSnyder OI&E RE:

SOUTHERN CALIFORNIA EDISON COMPANY CMiles (San Onofre Nuclear Generating Station, Unit No. 1)

By letter dated November 16, 1981, in response to your letter of July 10, 1981, I informed you that this office determined not to issue an order sus pending or revoking License No. DPR-13, which authorizes Southern California Edison Company to operate San Onofre Nuclear Generating Station, Unit No. 1.

My letter enclosed "Director's Decision Under 10 CFR Section 2.206" and it also enclosed the Decision under 10 CFR 2.206 pertaining to petitions filed by California residents which also requested that the Nuclear Regulatory Commission suspend or revoke the operating license for San Onofre Unit 1.

The Decision pertaining to petitions filed by California residents included an interim NRC staff report regarding the seismic capability of San Onofre Nuclear Generating Station, Unit 1.

After additional evaluation by the NRC staff and the licensee, the licensee informed the staff by letter dated June 15, 1982, that the licensee would extendkt its current outage pending completion of necessary modifications to upgrade the seismic capability of the facility. Because of the importance of this commitment to public health and safety the enclosed confirmatory order has been issued, which requires that San Onofre Unit 1 be maintained in the shutdown condition until modifications are completed and approved by the NRC staff to upgrade the facility to 0.67g Housner Spectra ground motion as described in Southern California Edison's submittal dated June 15, 1982 as supplemented by letter dated June 24, 1982. At the completion of our review and prior to startup the NRC staff will issue a report on the seismic capability of San Onofre Unit 1. A copy of this report will be forwarded to you when it is completed.

Sincerely, NRR: D/DIR NRR: DIR ECase HDenton

/

/82

/

/82 Harold R. Denton, Director Office of Nuclear Reactor Regulation

Enclosure:

Order OFFICEO...

D.S R.

. L DL: DIR SURNAMEIH~

.~

WPgso'2Cr chfieldGL na /-

ie'.jL SURN ME.HS..

P son

.___.D.....

c.h... d..0.

........ s E nhqgkyt.....

DATE

/82 1

/82

/

82

/-

82

/12/18

/82 NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO:1981-335-960

Mr. Ralph Nader August 11, 1982 cc Charles R. Kocher, Assistant Mr. R. Dietch, Vice President General Counsel Nuclear Engineering and Operations James Beoletto, Esquire Southern California Edison Company Southern California Edison Company 2244 Walnut Grove Avenue Post Office Box 800 Post Offie Box 800 Rosemead, California 91770 Rosemead, California David-R. Pigott The Honorable Jerry Brown Orrick, Herrington & Sutcliffe Governor of the State of California 600 Montgomery Street State Capitol San Francisco, California 94111 Sacramento, California 95814 Harry B. Stoehr San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Resident Inspector/San Onofre NPS c/o U. S. NRC P. 0. Box 4329 San Clemente, California 92672 Mayor City of San Clemente San Clemente, California 92672 Chairman Board of Supervisors County of San Diego San Diego, California 92101 California Department of Health ATTN:

Chief, Environmental Radiation Control Unit Radiological Health Section 714 P Street, Room 498 Sacramento, California 95814 U. S. Environmental Protection Agency Region IX Office ATTN:

Regional Radiation Representative 215 Freemont Street San Francisco, California 94111 Robert H. Engelken, Regional Administrator Nuclear Regulatory Commission, Region V 1450 Maria Lane WalRnut Creek, California 94596