Concurs W/Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Post-implementation Audit Insps to Verify Adequacy of Effort in Performing Instrument Air Sys Design Will Be Conducted
ML13304A441
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/17/1989
From: Kokajko L
Office of Nuclear Reactor Regulation
To: Cotton G, Ray H
San Diego Gas & Electric Co, Southern California Edison Co
References
GL-88-014, TAC-71714, TAC-71715 NUDOCS 8911280079
Download: ML13304A441 (3)


Text

November 17, 1989 Docket Nos. 50-361 and 50-362 Mr. Harold B. Ray Mr. Gary D. Cotton Vice President Senior Vice President Southern California Edison Co.

Engineering and Operations Irvine Operations Center San Diego Gas & Electric Co.

23 Parker Street 101 Ash Street Irvine, California 92718 San Diego, California 92112 Gentlemen:

SUBJECT:

STATUS OF GENERIC LETTER 88-14, INSTRUMENT AIR SUPPLY SYSTEM PROBLEMS AFFECTING SAFETY-RELATED EQUIPMENT, SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NOS. 2 AND 3 (TAC NOS. 71714 AND 71715)

By letter dated October 30, 1989, you responded to our August 8, 1988 Generic Letter 88-14, "Instrument Air Supply System Problems Affecting Safety-Related Equipment."

We have reviewed your response and concluded that it adequately addresses the points stated in Generic Letter 88-14.

We concur in your assessment that you should verify that leakage from the check valves used to isolate the safety-related nitrogen backup system from the instrument air system is within acceptable limits, and should be included in the SONGS 2/3 ASME Section XI Test Program. Therefore, your commitment to install the isolation valves and test connections necessary to conduct this testing during the Unit 2 and Unit 3 Cycle 5 refueling outages is acceptable.

We expect that a prompt notification in writing will be made as soon as the modifications have been completed.

We will conduct post implementation audit inspections to verify the adequacy of your efforts in performing the requested instrument air system design/operational verification and subsequent modifications. Therefore, the licensing activities on the above TAC numbers are considered closed.

Sincerely, original signed by Lawrence E. Kokajko Lawrence E. Kokajko, Project Manager Project Directorate V Division of Reactor Projects -

III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION

@4 -HE

iTTe, JLee OGC DRSPR D5 DRSP/D:PD5 NRC & LPDRs LKokajko EJordan jKokajko:dr GWKnighton PD5 Reading GEdison ACRS (10)

U 11/1q /89 11A /89 JZwolinski WLeFave

[TAC 71714/5 LETTER]

Li I.

280-9 -911"717 P

a REG0q0 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 November 17, 1989 Docket Nos. 50-361 and 50-362 Mr. Harold B. Ray Mr. Gary D. Cotton Vice President Senior Vice President Southern California Edison Co.

Engineering and Operations Irvine Operations Center San Diego Gas & Electric Co.

23 Parker Street 101 Ash Street Irvine, California 92718 San Diego, California 92112 Gentlemen:

SUBJECT:

STATUS OF GENERIC LETTER 88-14, INSTRUMENT AIR SUPPLY SYSTEM PROBLEMS AFFECTING SAFETY-RELATED EQUIPMENT, SAN ONOFRE NUCLEAR GENERATING STATION, UNIT NOS. 2 AND 3 (TAC NOS. 71714 AND 71715)

By letter dated October 30, 1989, you responded to our August 8, 1988 Generic Letter 88-14, "Instrument Air Supply System Problems Affecting Safety-Related Equipment."

We have reviewed your response and concluded that it adequately addresses the points stated in Generic Letter 88-14.

We concur in your assessment that you should verify that leakage from the check valves used to isolate the safety-related nitrogen backup system from the instrument air system is within acceptable limits, and should be included in the SONGS 2/3 ASME Section XI Test Program. Therefore, your commitment to install the isolation valves and test connections necessary to conduct this testing during the Unit 2 and Unit 3 Cycle 5 refueling outages is acceptable.

We expect that a prompt notification in writing will be made as soon as the modifications have been completed.

We will conduct post implementation audit inspections to verify the adequacy of your efforts in performing the requested instrument air system design/operational verification and subsequent modifications. Therefore, the licensing activities on the above TAC numbers are considered closed.

Sincerely, Lawrence E. Kokajko, Project Manager Project Directorate V Division of-Reactor Projects -

III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:

See next page

Mr: Harold B. Ray San Onofre Nuclear Generating Southern California Edison Company Station, Units 2 and 3 cc:

Charles R. Kocher, Esq.

Mr. F. B. Marsh, Project Manager James A. Beoletto, Esq.

Bechtel Power Corporation Southern California Edison Company P.O. Box 60860 Irvine Operations Center Terminal Annex 23 Parker Los Angeles, California 90060 Irvine, California 92718 Mr. Robert G. Lacy Orrick, Herrington & Sutcliffe Manager, Nuclear Department ATTN: David R. Pigott, Esq.

San Diego Gas & Electric Company 600 Montgomery Street P. 0. Box 1831 San Francisco, California 94111 San Diego, California 92112 Alan R. Watts, Esq.

Mr. John Hickman Rourke & Woodruff Senior Health Physicist 701 S. Parker St. No. 7000 Environmental Radioactive Mgmt. Unit Orange, California 92668-4702 Environmental Management Branch State Department of Health Services Mr. Sherwin Harris 714 P Street, Room 616 Resource Project Manager Sacramento, California 95814 Public Utilities Department City of Riverside Resident Inspector, San Onofre NPS 3900 Main Street c/o U.S. Nuclear Reguldtory Commission Riverside, California 92522 Post Officc Box 4329 San Clemente, California 92672 Mr. Charles B. Brinkman Combustion Engineering, Inc.

Mayor, City of San Clemente 12300 Twinbrook Parkway, Suite 330 San Clemente, California 92672 Rockville, Maryland 20852 Regional Administrator, Region V Mr. Phil Johnson U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 1450 Maria Lane/Suite 210 Region V Walnut Creek, California 94596 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Chairman, Board of Supervisors San Diego County Mr. Don Womeldorf 1600 Pacific Highway, Room 335 Chief Environmental Management Branch San Diego, California 92101 California Department of Health 714 P Street, Room 616 Sacramento, California 95814 (14)