ML13302B474

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-26, Boron Loss from BWR Control Blades. No Response Required
ML13302B474
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/20/1979
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Arenal A
SOUTHERN CALIFORNIA EDISON CO.
References
NUDOCS 7911300037
Download: ML13302B474 (1)


Text

REGuj o

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION V 1990 N. CALIFORNIA BOULEVARD SUITE 202, WALNUT CREEK PLAZA WALNUT CREEK, CALIFORNIA 94596 November 20, 1979 Docket Nos. 50-361 50-362 Southern California Edison Company P. 0. Box 800 2244 Walnut Grove Avenue Rosemead, CAlifornia 91770 Attention: Mr. A. Areanl, Vice President Advanced Engineering Gentlemen:

The enclosed IE Bulletin No. '79-26 is forwarded to you for information.

No written response is required. If you desire additional information regarding this matter, please contact this office.

Sincerely, R. H. Engelken Director

Enclosures:

1. IE Bulletin No. 79-26
2. List of Recently Issued IE Bulletins cc w/enclosures:

J. H. Drake, SCE 79113 00