ML13289A225

From kanterella
Jump to navigation Jump to search
6.a.ii.12 SQN Hours of Operation Annual Air Report 2010
ML13289A225
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/12/2011
From: Langdon K
Tennessee Valley Authority
To: Frazier J
Office of Nuclear Reactor Regulation
Shared Package
ML13289A109 List: ... further results
References
Download: ML13289A225 (2)


Text

Tennessee Valley Authority, Post Office Box 2000, Soddy Daisy, Tennessee 37384-2000 May 12, 2011 Mr. J. Alan Frazier Chattanooga-Hamilton County Air Pollution Control Bureau 6125 Preservation Drive Chattanooga, Tennessee 37416

Dear Mr. Frazier:

SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT Please find enclosed the annual report for the hours of operation from April 1,2010 to March 31,2011 for Auxiliary Boilers A and B, Diesel Generators i-A, 2-A, 1-B, and 2-B, and Blackout Diesel Generators 1 and 2. This report is required by Air Pollution Permits 4150-1 0200501-08C and 4150-20200102-11 C.

If you have any questions regarding this report, please contact Stephanie Howard at (423)843-6700 or Lynne Koby at (423)843-6713 of Sequoyah's Environmental staff.

Sincerely, Kenneth Langdon Plant Manager Signatory Authority for Michael D. Skaggs Site Vice President Sequoyah Nuclear Plant Enclosure

SEQUOYAH NUCLEAR PLANT - HOURS OF OPERATION ANNUAL REPORT APRIL 1, 2010 to MARCH 31, 2011 Equipment Name Maximum Permitted Actual Hours Hours of Operation of Operation Auxiliary Boilers 2,000 (combined)

Boiler A o Hours Boiler B o Hours Total 2,000 (combined) o Hours Emergency Diesel 204 Hours 32.4 Hours Generator 1-A Emergency Diesel 204 Hours 50.2 Hours Generator 2-A Emergency Diesel 204 Hours 53.5 Hours Generator 1-B Emergency Diesel 204 Hours 51.1 Hours Generator 2-B Blackout Diesel 204 Hours 5.3 Hours Generator 1 Blackout Diesel 204 Hours 12.9 Hours Generator 2