ML23242A21431 August 2023Request for Extension of Comment Period Associated with Draft Nuregs: Revision 1 of Subsequent License Renewal Guidance Documents, and Supplement 1 to Associated Technical Basis Document, Docket Id NRC-2023-0096
ML22055A56223 February 2022NEI Draft FAQ 22-01 - ANS to Erfer PITime of Discovery
Significance Determination Process
ML21270A13124 September 2021NEI 17-06 NEI Response to NRC CommentsCommercial Grade Dedication
ML21244A2679 August 2021EPFAQ 2021-001 Clarification of Section 4.3 of NUREG-7002, Criteria for Development of Evacuation Time Estimate Studies, Regarding Acceptable Error And/Or Confidence Interval
ML21089A06226 March 2021NEI Responses to Initial NRC Comments on Draft NEI 20-07 Draft B - for Discussion with NRC_032621
ML21003A00812 January 2021NEI Feedback on POV Inspections Dec 8 2020 (1)Pandemic
ML20191A2314 January 2021Responses to Public Comments to DG-1287 for Regulatory Guide 1.177, Revision 2, an Approach for Plant-Specific, Risk Informed Decisionmaking: Technical SpecificationsProbabilistic Risk Assessment
Large early release frequency
ML21006A30921 December 2020NEI Feedback on Draft IMC-0335 12/21/2020Surveillance Frequency Control Program
ML20339A48423 November 2020Summary of Remaining October 2020 NRC Comments on NEI 20-09
ML20168A39116 June 2020EPFAQ on EPG-SAG R4 - BWROG Update to Question 2019-04-02FLEX
ML20162A06910 June 2020EPFAQ 2019-04 Supplement to Question 2019-04-02FLEX
ML20080J34928 January 2020EPFAQ 2020-02 Clarification of Emergency Preparedness Communication Equipment Relative to Extended Loss of All Power Communication EquipmentFLEX
Fukushima Dai-Ichi
ML20017A08917 January 2020NEI Description - Best Practice for Issue Escalation_012220
ML20008E4446 January 2020EPFAQ 2020-01 Relief from Annual Evacuation Time Estimate (ETE) Update When Performing a Census Baseline ETE Study
ML19196A30219 July 2019Disposition Table for NEI and EPRI Comments Draft Safety Evaluations for EPRI Depletion TRs 3002010613 and 3002010614
ML19196A27631 January 2019Attachment 3: Proposed Changes for EPRI Utilization Report & NEI 12-16, Revision 3
ML19196A27531 January 2019Attachment 2: Comments on Draft SER, Revision 2
ML19196A27431 January 2019Attachment 1: Evaluation of Depletion Reactivity Decrement Bias and Uncertainty Values Using Linear Versus Quadratic Weighted Least Squares Regression Models
ML19149A4729 January 2019EPFAQ 2019-01 CU1 and CA1 IC Clarification Public Comment
ML18338A06411 December 2018Session 2 Biographies for M. Billone, R. Montgomery, and B. Hanson
ML18338A2904 December 2018Completed EPFAQ 2018-01 RCS Barrier Loss ClarificationPressure Boundary Leakage
ML18338A3084 December 2018Completed EPFAQ 2018-02 BWR Unisolable LeakGrace period
ML18338A3974 December 2018Completed EPFAQ 2018-03 Single Containment Fire Detector Alarm
ML18178A58627 June 2018Draft NEI 18-03, Rev. FMission time
Anticipated operational occurrence
Probabilistic Risk Assessment
Functionality Assessment
Condition Adverse to Quality
Tornado Generated Missile
Pressure Boundary Leakage
ML18157A14231 May 2018EPFAQ 2018-04 Hazardous Events Effects on Safety Systems Clarification
ML18081A28822 March 2018EPFAQ 2018-001 RCS Barrier Loss ClarificationPressure Boundary Leakage
ML18081A30222 March 2018EPFAQ 2018-002 BWR Unisolable Leak Question
ML18081A30922 March 2018EPFAQ 2018-003 Containment Detector
ML18068A40612 March 2018NEI Examples- Use of COL License Conditions to Address Significant Errors in a Referenced Design CertificationIncorporated by reference
ML18068A6095 March 2018Resolutions to 11/30/17 NRC Comments on NEI 12-04, Revision 1AEarthquake
ML18030A77123 January 2018Ensuring the Future of Us Nuclear Energy: Creating a Streamlined and Predictable Licensing Pathway to Deployment
ML18016A12511 January 2018White Paper Addressing the Impact of CCF and Application of Qualitative R1Significance Determination Process
ML18176A17831 December 2017Draft NEI 96-07, Appendix D Rev 0eAnticipated operational occurrence
ML17312A7958 November 2017NEI 96-07 Appendix D Section 4.3.6 RevisedSafe Shutdown
Anticipated operational occurrence
ML17249A10030 September 2017NEI Response to NRC Comment Set 1Fitness for Duty
Incorporated by reference
B.5.b Mitigating Strategies
ML17268A10619 September 2017NEI 96-07, App Edits from September 19-21, 2017 MeetingPost Accident Monitoring
Incorporated by reference
ML17241A02829 August 2017NEI 16-16, Draft 2, Staff Comments (Jul 13, 2017) and NEI Discussion Points (Aug 10, 2017)
ML17209A02114 July 201707-14-17 Anchor Darling Valve Industry Resolution Plan AttachmentAnchor Darling
ML17195A29914 July 2017EPFAQ 2016-002 Clarification of Equipment Damage (Completed)Safe Shutdown
High winds
Earthquake
ML17214A6995 July 2017Attachment 1: Method of Evaluation Guidance Extract - Clean Copy (7/05/2017, E-Mail from K. Cummings/Nei to R. Wharton/Nmss/Dsfm 72.48 and Method of Evaluation)Aging Management
ML17214A7005 July 2017Attachment 2: Method of Evaluation Guidance Extract - Track Changes (7/05/2017, E-Mail from K. Cummings/Nei to R. Wharton/Nmss/Dsfm 72.48 and Method of Evaluation)Aging Management
ML17171A41020 June 2017Attachment - Industry Comments on EPFAQ 2017-001Offsite Dose Calculation Manual
ML17271A20016 May 2017NEI 96-07, Appendix D with Hsi Edits from Sep 19-21, 2017 Meeting
ML17097A4917 April 2017Attachment 4 - NUREG-2191 and NUREG-2192 (February 2017 Draft) Electrical CommentsAging Management
License Renewal
Subsequent License Renewal
ML17097A4887 April 2017Attachment 1 - NUREG-2191 and NUREG-2192 (February 2017 Draft) Summary List of Significant Industry CommentsAging Management
Subsequent License Renewal
EVT-1
Dissimilar Metal Weld
ML17097A4897 April 2017Attachment 2 - NUREG-2191 and NUREG-2192 (February 2017 Draft) Mechanical CommentsNondestructive Examination
Aging Management
License Renewal
ML17097A4907 April 2017Attachment 3 - NUREG-2191 and NUREG-2192 (February 2017 Draft) Structural CommentsCoatings
Aging Management
EVT-1
Dissimilar Metal Weld
ML17096A3886 April 2017Proposed EPFAQ 2016-002Safe Shutdown
High winds
Earthquake
ML17095A5955 April 2017NEI Proposed Edits to Draft EPFAQ 2016-002 (April 4, 2017 Public Meeting)Safe Shutdown
High winds
Earthquake
ML17108A61629 March 2017NEI 96-07 Appendix D Draft Revision 0b - Proposed Revisions - March 29 2017Anticipated operational occurrence
Post Accident Monitoring
Incorporated by reference