ML12362A471

From kanterella
Jump to navigation Jump to search
Transmittal of Evacuation Time Estimates
ML12362A471
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 12/18/2012
From: James Shea
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML12362A471 (2)


Text

Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 December 18, 2012 10 CFR 50.4 10 CFR 50, Appendix E ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296

Subject:

Evacuation Time Estimates The purpose of this correspondence is to provide the Evacuation Time Estimate (ETE) analysis for Browns Ferry Nuclear Plant. 10 CFR 50, Appendix E, Section IV.4 requires submittal of an ETE analysis using the most recently available decennial census date within 365 days of December 23, 2011. Three hundred and sixty five days after December 23, 2011 falls on December 22, 2012. Since December 22, 2012 is a Saturday, the report is due on December 24, 2012.

There are no new regulatory commitments in this letter. Should you have any questions or if additional information is needed regarding this submittal, please contact Mr. Walter H. Lee, Senior Emergency Preparedness Manager, at (423)751-8577.

Respectfully, JW.Shea Vice President, Nuclear Licensing

Enclosure:

Evacuation Time Estimates for Browns Ferry Nuclear Power Plant Plume Exposure Pathway Emergency Planning Zone cc (Enclosure): See page 2 Printed ow recycled pape

U.S. Nuclear Regulatory Commission Page 2 December 18, 2012 cc (Enclosure):

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant