Letter Sequence Response to RAI |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
|
MONTHYEARML1017602192010-06-22022 June 2010 NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 1 Project stage: Request ML1026401142010-09-16016 September 2010 NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 4 Project stage: Request ML1030906022010-11-0404 November 2010 NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 5 Project stage: Request ML1030802102010-11-0404 November 2010 NRC Staff Response to NFPA 805 Transition Pilot Plant FAQ 07-0030, Revision 4 Project stage: Request ML1100704852011-02-0404 February 2011 Close-out of National Fire Protection Association Frequently Asked 07-0030 on Establishing Recovery Actions Project stage: Request L-2011-312, Units 1 and 2 and Turkey Point, Units 3 and 4 - Regarding Online Reference Portal2011-08-0505 August 2011 Units 1 and 2 and Turkey Point, Units 3 and 4 - Regarding Online Reference Portal Project stage: Request NG-11-0267, Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (TSCR-128)2011-08-0505 August 2011 Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (TSCR-128) Project stage: Request ML11277A2852011-10-0303 October 2011 NRR E-mail Capture - FW: ME6818 - NFPA 805 Adoption Acceptance Review RAIs and Clarification Conference Call of 9/30/2011 Project stage: RAI NG-11-0384, Clarification of Information Contained in License Amendment Request (TSCR-128): Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (TSCR-128)2011-10-14014 October 2011 Clarification of Information Contained in License Amendment Request (TSCR-128): Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) (TSCR-128) Project stage: Request ML11304A1242011-10-27027 October 2011 NRR E-mail Capture - ME6818 - Duane Arnold - LIC-109 Acceptance Review Results - Transition to 10 CFR 50.48(c) - Adoption of NFPA 805 Performance-Based Fire Protection Standard Project stage: Acceptance Review ML11304A1482011-10-28028 October 2011 NRR E-mail Capture - ME6818 - Duane Arnold Adoption of NFPA-805 - Generic List of Documents Requested for the Sharepoint Portal Project stage: Other ML11334A1502011-11-30030 November 2011 NRR E-mail Capture - ME6818 - DAEC NFPA-805 Adoption - Pre-Audit Discussion - 29 Nov 2011 Conference Call Project stage: Other ML12031A1122012-01-31031 January 2012 NRR E-mail Capture - ME6818 - DAEC Adoption of NFPA-805 - Afpb, Ihpb, Apla Request for Additional Information (RAI) Project stage: RAI 05000331/LER-2012-001, Regarding Inoperability of Low Pressure Coolant Injection Due to Discharge Line Voiding2012-01-31031 January 2012 Regarding Inoperability of Low Pressure Coolant Injection Due to Discharge Line Voiding Project stage: Request ML12058A5702012-02-24024 February 2012 NRR E-mail Capture - ME6818 Record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET Project stage: RAI ML12058A5722012-02-27027 February 2012 NRR E-mail Capture - ME6818 - Clarification Conference Call of 2/22/2012 - Licensee and NRC Attendance - Supplemental Record Project stage: Approval ML12079A2322012-03-19019 March 2012 NRR E-mail Capture - ME6818 DAEC 60/90 Day Matrix - RAI Processing Identifier Syntax Project stage: RAI NG-12-0177, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generational Plants2012-04-23023 April 2012 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generational Plants Project stage: Response to RAI ML12115A0782012-04-24024 April 2012 NRR E-mail Capture - FW: ACRS July 2012 NFPA-805 Subcommittee Meeting - Invitation for DAEC Participation Project stage: Meeting ML1214300352012-05-21021 May 2012 NFPA 805 Transition FAQ 12-0062, Revision 1 Project stage: Request ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 Project stage: Other NG-12-0225, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2012-05-23023 May 2012 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML12284A0212012-10-0808 October 2012 NRR E-mail Capture - ME6818 Duane Arnold NFPA-805 - Second Audit Visit Questions (Retrieved Copy) Project stage: Other NG-12-0419, Response to Second Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2012-10-15015 October 2012 Response to Second Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805 Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request ML12304A0692012-10-26026 October 2012 NRR E-mail Capture - ME6818, Additional RAIs for Duane Arnold Energy Center, LAR to Adopt NFPA 805 Project stage: RAI ML12318A3942012-11-0808 November 2012 NRR E-mail Capture - ME6818 - DAEC Adoption of NFPA-805 - Record of RAI Clarification Conference Call Conducted on 11/08/2012 Project stage: RAI ML12340A4502012-12-0505 December 2012 NRR E-mail Capture - ME6818 - DAEC Adoption of NFPA 805 - Request for Additional Information (RAI) Items - Round 2 (More) Project stage: RAI ML12355A0722012-12-19019 December 2012 NRR E-mail Capture - FW: ME6818 - DAEC NFPA-805 Adoption - Record of Revisions to RAI Items, Expected Response Schedule, Participants List for Meetings on 17-18 December 2012 Project stage: RAI ML12361A0192012-12-23023 December 2012 NRR E-mail Capture - Supplement to ML12355A072 (RAI Issed as an Email on 12/19/2012, at 4:08 PM ET) Project stage: RAI NG-12-0502, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-01-11011 January 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI NG-13-0056, Response to RAI, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-02-12012 February 2013 Response to RAI, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI NG-13-0102, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-03-0606 March 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML13070A0352013-03-0808 March 2013 NRR E-mail Capture - ME6818 - DA - NFPA-805 Adoption - Request for Portal Locations to Selected RAI Responses Project stage: RAI ML13084A0042013-03-22022 March 2013 NRR E-mail Capture - ME6818 DAEC Adoption of NFPA-805 - Request for Additional Information Project stage: RAI ML13098B0722013-04-0707 April 2013 NRR E-mail Capture - ME6818 - DAEC Adoption of NFPA-805 - Request for Additional Information (Revised) Project stage: RAI ML13119A2202013-04-26026 April 2013 NRR E-mail Capture - FW: ME6818-DAEC-Adoption of NFPA-805- RAI Dated 4/7/2013 - Record of Clarification Call of April 11, 2013 Project stage: RAI NG-13-0182, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-05-0101 May 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML13129A0742013-05-0808 May 2013 NRR E-mail Capture - ME6818 - DAEC - Adoption of NFPA 805 - Request for Additional Information (RAI) Project stage: RAI NG-13-0240, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-05-29029 May 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML13175A3932013-06-27027 June 2013 Request for Additional Information for Review Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: RAI NG-13-0281, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-07-0202 July 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI NG-13-0287, Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-07-0202 July 2013 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Response to RAI ML13210A4582013-07-30030 July 2013 Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants Project stage: Other NG-13-0318, Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generation Plants2013-08-0505 August 2013 Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generation Plants Project stage: Request NG-13-0341, Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants2013-08-28028 August 2013 Response to Revised License Condition for the License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants Project stage: Request ML13210A4492013-09-10010 September 2013 Issuance of Amendment Regarding Transition to a Risk-Informed Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) Project stage: Approval 2012-03-19
[Table View] |
Text
NEXTeraM ENERAY ARNOLD NG-13-0281 10 CFR 50.90 July 2, 2013 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center Docket No. 50-331 Renewed Op. License No. DPR-49 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard For Fire Protection For Light Water Reactor Generatinq Plants
References:
- 1) License Amendment Request (TSCR-128): Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard For Fire Protection For Light Water Reactor Generating Plants (2001 Edition), NG-1 1-0267, dated August 5, 2011 (ML11221A280)
- 2) Clarification of Information Contained in License Amendment Request (TSCR-128): Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard For Fire Protection For Light Water Reactor Generatinq Plants (2001 Edition), NG-1 1-0384, dated October 14, 2011
- 3) Electronic Communication, ME6818 - DAEC Adoption of NFPA-805 - Request for Additional Information (RAI) FPE 14, dated June 14, 2013 (ML13169A238)
In the Reference 1 letter, as clarified by Reference 2, NextEra Energy Duane Arnold, LLC (hereafter NextEra Energy Duane Arnold) submitted a License Amendment Request for the Duane Arnold Energy Center (DAEC) pursuant to 10 CFR 50.90. Subsequently, the NRC Staff requested, via Reference 3, additional information regarding that application. The Attachment to this letter contains the requested information.
This additional information does not impact the 10 CFR 50.92 evaluation of "No Significant Hazards Consideration" previously provided in the referenced application NextEra Energy Duane Arnold, LLC, 3277 DAEC Road, Palo, IA 52324
Document Control Desk NG-13-0281 Page 2 of 2 This letter makes no new commitments and does not change any existing commitments.
If you have any questions or require additional information, please contact J.
Michael Davis at 319-851-7032.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on July 2, 2013 (Rchr L. Andrso n Vice President, Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC
Attachment:
Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard For Fire Protection For Light Water Reactor Generating Plants cc:
M. Rasmusson (State of Iowa)
Attachment to NG-13-0281 Response to Request for Additional Information, License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard For Fire Protection For Liqht Water Reactor Generatinq Plants 3 pages follow
RAI - Fire Protection Engineering 14 DAEC RAI FP 14 With regards to how DAEC complies with the requirements of NFPA 805 Section 3.11.5:
- 1.
There appears to be discrepancies between LAR Attachment A, Table 4-3 and Attachment C with regard to Electrical Raceway Fire Barrier Systems (ERFBS) credited at DAEC.
Attachment A, Element 3.11.5, Electrical Raceway Fire Barrier Systems (ERFBS)
(page 138 of 138), states that DAEC complies with the requirement and states that "Limited amounts of Darmat KM1 are utilized for ERFBS at DAEC. This product was tested to meet Generic Letter 86-10 Supplement 1." No other ERFBS is discussed.
However, Table 4-3, NFPA 805 Ch 4 Required FP Systems/Features and Attachment C, NEI 04-02 Table B Fire Area Transition both discuss an additional 3-hour ERFBS.
- Table 4-3, Fire Area TB1, Turbine Building, Fire Zones ID 07C (page 64) and 07H (page 66) list "Concrete Chase - Separation Required to protect cables for RHR Service Water, River Water, ESW and Division 2 AC Power."
- Attachment C, Fire Area TB1 (page 154 of 165), under Performance Goal 4, Vital Auxiliaries - Mechanical, includes a Comment "Feeders and control power to portions of the Div 2 electrical distribution credit a 3 hr ERFBS."
- Attachment C, Fire Area TB1 (page 154 of 165), under Performance Goal 4, Vital Auxiliaries - Electrical includes a Comment "Div 2 RHRSW pumps, Div 2 River Water pumps and Div 2 ESW pump credit a 3 hr ERFBS."
- Attachment C, Fire Area TB1 (page 163 of 165), Required Fire Protection Systems and Features table lists "Passive, Concrete Chase, Separation, Required to protect cables for RHR Service Water, River Water, ESW and Division 2 AC Power."
Any ERFBS credited to meet NFPA 805 separation requirements using either a deterministic approach under NFPA 805 Section 4.2.3 or a performance-based approach under NFPA 805 Section 4.2.4 must meet the ERFBS requirements of NFPA 805 Section 3.11.5.
Provide additional information regarding the compliance status of the "concrete chase" used as an ERFBS in the Turbine Building with regard to NFPA 805 Section 3.11.5. Discuss the testing performed on this ERFBS, including the test rating obtained.
Rev 0 Page I of 3
RAI - Fire Protection Engineering 14
- 2.
Attachment A, Element 3.11.5, Electrical Raceway Fire Barrier Systems (ERFBS), states that DAEC complies with the requirement and states that "Limited amounts of Darmat KM1 are utilized for ERFBS at DAEC. This product was tested to meet Generic Letter 86-10 Supplement 1."
There is no discussion regarding the results of the testing. NFPA 805 Section 3.11.5 states that "The ERFBS needs to adequately address the design requirements and limitations of supports and intervening items and their impact on the fire barrier system rating. The fire barrier's ability to maintain the required nuclear safety circuits free of fire damage for a specific thermal exposure, barrier design, raceway size and type, cable size, fill and type shall be demonstrated."
Provide a discussion on the results of the fire barrier testing performed in accordance with Generic Letter 86-10, Supplement 1 to meet NFPA 805 Section 3.11.5.
RESPONSE
The following is the DAEC response to the items identified above:
- 1. The classification of ERFBS in Attachment C, Fire Area TB1 (page 154 of 165) under Performance Goal 4, Vital Auxiliaries - Electrical and Vital Auxiliaries -
Mechanical is incorrect. The deterministic separation for Vital Auxiliaries -
Electrical and Vital Auxiliaries - Mechanical is provided by a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> fire barrier meeting the requirements of NFPA 805 Section 4.2.3.3(a) "Enclosure of cable and equipment and associated non-safety circuits of a redundant success path in a fire barrier having a 3-hour fire resistance rating." The specific configuration is the fire barrier option in NFPA 805 Section 4.2.3.3(a), rather than the ERFBS option. The fire barrier was installed to a Uniform Building Code standard using UL listed material to meet a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> fire resistance rating. All openings are protected with passive fire protection having a fire-resistive rating equivalent to that of the fire barrier.
Attachment C has been updated to correctly identify that the separation is achieved by meeting the requirements of NFPA 805 Section 4.2.3.3(a).
- 2. The fire resistive rating of the DARMATT KM-1 Fire Protection system utilized for ERFBS at DAEC as detailed in Attachment A, Element 3.11.5 was established by testing conducted in accordance with the guidance and acceptance criteria of NRC Generic Letter 86-10, Supplement 1 and ASTM El 19 for a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> rated barrier. The Darmatt testing addressed the design requirements and limitations Rev 0 Page 2 of 3
RAI - Fire Protection Engineering 14 of supports and intervening items and their impact on the fire barrier system rating. The testing also established the fire barrier system's bounding barrier design, raceway size and type, cable size, fill and type.
Attachment A Section 3.11.5 has been updated to identify that the DARMATT was successfully tested to meet Generic Letter 86-10 Supplement 1.
Rev 0 Page 3 of 3 Rev 0 Page 3 of 3