Commitment Summary Report
ML13189A134
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/01/2013
From: James Shea
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML13189A134 (6)


Text

Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 July 1, 2013 10 CFR 50.4 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328

Subject:

Commitment Summary Report The purpose of this letter is to provide the Sequoyah Nuclear Plant (SQN), Units 1 and 2, Commitment Summary Report for July 1,2011 through June 30, 2013. This report which summarizes docketed commitments the Tennessee Valley Authority (TVA) has evaluated and revised using administrative controls during this time period, is provided in accordance with the Nuclear Energy Institute's "Guidelines for Managing NRC Commitment Changes," as endorsed in Nuclear Regulatory Commission Regulatory Issue Summary 2000-17.

Please direct any questions concerning this report to Michael McBrearty at (423) 843-7170.

Resp

Ily, J.

hea Vi e resident, Nuclear Licensing

Enclosure:

Commitment Summary Report cc (Enclosure):

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant

  • W[Ic Printed on recycled paper

ENCLOSURE TENNESSEE VALLEY AUTHORITY (TVA)

SEQUOYAH NUCLEAR PLANT (SQN)

UNITS 1 AND 2 COMMITMENT

SUMMARY

REPORT E-1

20 NC NC NC NC NC COMMITMENT

SUMMARY

REPORT An evaluation of each of the below listed commitments was performed in accordance with NEI 99-04. The evaluation determined that each of the items is no longer a commitment based on the provided justification. Because these commitments were initiated as a result of a response to a Bulletin; response to an information request under 10 CFR 50.54(f); or basis for a safety decision in a safety evaluation report, they have been tabulated in the commitment summary report for Nuclear Regulatory Commission (NRC) notification.

12-01/

MiiainSrtg

.TAcmist mlmn h eomtIn Tennessee Valley Authority (TVA) letter to NF

0060005001, Assessments And industry strategy described in the NEI dated February 26, 2007, "TVA Nuclear (TVAN) 0060005002, Closure Process letter to Mr. Luis Reyes dated Mitigation Strategy Assessments and Closure 0060005003, For Phases 1, 2, January 24, 2006, and considers this Process for Phases 1, 2, and 3," TVA informed 0060005004, and 3 commitment to fully satisfy the NRC NRC that commitments contained in TVA letter 0060005005 (S64060214800 Phase 2 letter request.

dated February 14, 2006, "Sequoyah Nuclear PI and (SQN) Units I and 2 - Response to NRC Phase L44070226001)

2.

TVA will provide NRC with a Assessment of Spent Fuel Pool," were supersec description of the final strategies and in their entirety. These commitments were our plans and schedules for having replaced by other commitments contained in the these strategies in place, including February 26th letter.

procedures/guidelines and associated training, within 60 days of NRC approval of the industry-proposed approach.

3.

A listing of any remaining candidate enhancement strategies identified in Reference 1 that are not adopted by TVA as part of its internal or external strategies will be appended to a SQN guidance document as further strategies for consideration by response personnel if conditions warrant.

ant 2

led E-2

COMMITMENT

SUMMARY

REPORT TVA will notify NRC in writing at least 30 days prior to changing any commitment or obligation that will reduce our spent fuel pool mitigation capabilities below the level described in Reference 3.

5.

TVA will notify NRC verbally or in writing within 30 days of any unplanned reduction in capability to meet the external strategy described in Reference 3, unless the condition is corrected within the 30-day period.

4-

+

4-4 2012-02/

NCO020050003 Response to Bulletin 2002-01 (S64020402801 and L44030227801)

(ADAMS Acc. Nos.

ML021020072 and ML030650786)

In conjunction with each 10 year Inservice Inspection Program interval, the SQN program will be revised to perform a visual inspection of 100 percent of the reactor vessel external head surface.

Decommit In TVA letter dated February 27, 2003, "Response to Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel (RPV) Heads at Pressurized Water Reactors (PWRs) For Sequoyah Nuclear Plant (SQN) Units 1 and 2; and Watts Bar Nuclear Plant (WBN) Unit 1," TVA informed NRC that commitments made in the letter dated April 2, 2002, "Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity," providing the 15-day responses for SQN and WBN (two letters) to NRC Bulletin (BL) 2002-01, were superseded by acceptance of Order EA-03-009.

Furthermore, rulemaking, RIN 3150-AH76, issued in Federal Register Volume 73, No. 176, September 10, 2008, rendered this commitment no longer in effect. Subsequent to the rulemaking, external reactor vessel head inspection is to be conducted in accordance with 10 CFR 50.55a(g)(6)(ii)(D), which references E-3

COMMITMENT

SUMMARY

REPORT American Society of Mechanical (ASME) Code Case N-729-1.

I.

I' I

2012-03/

NCO070002001 Material Reliability Program (MRP)-

139 - Inspection and Mitigation of Alloy 600/82/182 Pressurizer Butt Welds (S64070227800 and L44070131007)

(ADAMS Acc. Nos.

ML070330062 and ML070610093)

1. Future inspections of pressurizer butt welds at SQN Units 1 and 2 and WBN Unit 1 will be performed in accordance with industry guidance (MRP-1 39).
2.

The results of future inspection or mitigations of pressurizer Alloy 600/82/182 butt weld locations will be reported to the NRC within 60 days of startup from the outage during which they were performed.

Decommit By TVA letter dated February 27, 2007, "Sequoyah Nuclear Plant (SQN) Unit 1 - Commitment Letter Regarding Inspection and Mitigation of Alloy 600/82/182 Pressurizer Butt Welds," the Unit 1 commitments in the letter dated January 31, 2007, "Sequoyah Nuclear Plant (SQN) Units 1 and 2 and Watts Bar Nuclear Plant (WBN) Unit 1 - Inspection and Mitigation of Alloy 600/82/182 Pressurizer Butt Welds," were superseded by commitments to implement temporary enhanced reactor coolant system leakage monitoring until all Alloy 600/82/182 butt weld locations on the pressurizer have been mitigated.

Furthermore, rulemaking, RIN 3150-AI35, issued in Federal Register Volume 76, No. 119, June 21, 2011, rendered these commitments no longer in effect. Subsequent to the rulemaking, examination requirements for Class 1 piping and nozzle dissimilar-metal butt weld inspections are to be in accordance with 10 CFR 50.55a(g)(6)(ii)(F),

which references ASME Code Case N-770-1.

2012-04/

Preemptive Weld Subsequent inservice examination of the Decommit Rulemaking, RIN 3150-AI35, issued in Federal NCO060024003 Overlays on Alloy structural weld overlays on pressurizer Register Volume 76, No. 119, June 21, 2011, and (PWOL) 600 welds will be in accordance with ASME rendered this commitment no longer in effect.

NCO060024004 Pressurizer Section Xl, Appendix Q, Q-4300. Where Subsequent to the rulemaking, examination Nozzle-To-Pipe PWOLs have been installed over dissimilar requirements for Class 1 piping and nozzle Welds and metal welds that have been examined with dissimilar-metal butt weld inspections are to Associated PDI qualified procedures and have no be in accordance with 10 CFR 50.55a(g)(6)(ii)(F),

Alternative recordable indications, subsequent which references ASME Code Case N-770-1.

Repair inservice examinations will be in E-4

COMMITMENT

SUMMARY

REPORT Techniques -

Generic Request for Relief G-RR-1, TVA letter dated October 20, 2006 (L44061023001)

(ADAMS Acc. No.

ML062970101) accordance with Appendix Q-through (f) and Q-4310.

2012-05/

Response to TVA will revise 0-SI-SXI-000-200.0 to Decommit The commitment requirement is relocated to the NCO030049001 Bulletin 2003-01, require inspection of drains in accumulator SQN Updated Final Safety Analysis and will no TVA letter dated rooms 3 and 4 each refueling outage. This longer be tracked in the TVA commitment tracking August 8, 2003 will be completed prior to startup from the system.

(S64030808800)

Unit 2 Cycle 12 refueling outage.

(ADAMS Acc. No.

ML032310418)

E-5