|
---|
Category:License-Operator
MONTHYEARIR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23319A3902023-09-20020 September 2023 11-CW-2023-09 Public Forms ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20223012022-04-12012 April 2022 NRC Examination Report 05000483/2022301 ML22081A1282022-02-23023 February 2022 CW-2022-02-FINAL Written Examination ML22081A1232022-02-23023 February 2022 CW-2022-02-DRAFT Outline Comments ML22081A1212022-02-23023 February 2022 CW-2022-02-DRAFT Op Test Comments ML22081A1222022-02-23023 February 2022 CW-2022-02-DRAFT Op Test ML22081A1252022-02-23023 February 2022 CW-2022-02-DRAFT Written Exam Comments ML22081A1242022-02-23023 February 2022 CW-2022-02-DRAFT Outlines ML22081A1262022-02-23023 February 2022 CW-2022-02-DRAFT Written Exam ML22081A1272022-02-23023 February 2022 CW-2022-02-FINAL Op Test ML22105A0062022-02-23023 February 2022 CW-2022-02-FINAL Outlines ML22081A1292022-02-23023 February 2022 CW-2022-02-Post Exam Comments ML22105A0022022-02-23023 February 2022 CW-2022-02-Public Forms ML20276A1522020-09-0909 September 2020 1-CW-2020-08 Draft Outlines ML20276A1532020-09-0909 September 2020 2-CW-2020-08 Draft Outline Comments ML20276A1552020-09-0909 September 2020 4-CW-2020-08 Written Exam Comments Final 8-25-2020 ML20276A1542020-09-0909 September 2020 3-CW-2020-08 Draft Written Exam ML20276A1582020-09-0909 September 2020 7-CW-2020-08 Outlines Final ML20276A1562020-09-0909 September 2020 5-CW-2020-08 Draft Operating Test ML20276A1572020-09-0909 September 2020 6-CW-2020-08 Operating Test Comments - Final BC Comments.Pdf ML20276A1592020-09-0909 September 2020 8-CW-2020-08 Written Exam Final ML20276A1602020-09-0909 September 2020 9-CW-2020-08 Operating Test - Final ML20276A1362020-09-0909 September 2020 10-CW-2020-08 Post-Exam Comments ML20276A1372020-09-0909 September 2020 11-CW-2020-08 Public Forms ML19099A3872019-03-18018 March 2019 Cwy 2019-03 Post Exam Comments Analysis ML19099A3792019-03-13013 March 2019 CW-2019-03 Draft Written Exam ML19099A3752019-03-13013 March 2019 Cw 2019-03 ES-301-7 Op Test Comments with Resolutions ML19099A3732019-03-13013 March 2019 CW-2019-03 Final Written Exam ML19099A3742019-03-13013 March 2019 Cw 2019-03 Draft Written Comments with Resolutions ML19099A3702019-03-13013 March 2019 CW-2019-03 Final Outlines ML19099A3762019-03-13013 March 2019 CW-2019-03 Draft Operating Test ML19099A3692019-03-13013 March 2019 CW-2019-03 Final Operating Test ML19099A3772019-03-13013 March 2019 CW-2019-03 Draft Outline Comments ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML19099A3782018-09-27027 September 2018 CW-2019-03 Draft Outlines ML18143B4542018-04-25025 April 2018 Operator Licensing Examination Data ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17270A1662017-09-20020 September 2017 2017-09-DRAFT Op Test Comments ES-301-7 ML17270A1672017-09-20020 September 2017 2017-09-DRAFT Op Test ML17270A1682017-09-20020 September 2017 2017-09-DRAFT Outline Comments ML17270A1692017-09-20020 September 2017 2017-09-DRAFT Outlines ML17270A1702017-09-20020 September 2017 2017-09-Draft Written Exam Comments ES-401-9 ML17270A1712017-09-20020 September 2017 2017-09-DRAFT Written Exam ML17270A1722017-09-20020 September 2017 2017-09-FINAL Op Test ML17270A1732017-09-20020 September 2017 2017-09-FINAL Outlines ML17270A1742017-09-20020 September 2017 2017-09-Final Written Exam 2024-08-05
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23319A3902023-09-20020 September 2023 11-CW-2023-09 Public Forms ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20223012022-04-12012 April 2022 NRC Examination Report 05000483/2022301 ML22081A1282022-02-23023 February 2022 CW-2022-02-FINAL Written Examination ML22081A1232022-02-23023 February 2022 CW-2022-02-DRAFT Outline Comments ML22081A1212022-02-23023 February 2022 CW-2022-02-DRAFT Op Test Comments ML22081A1222022-02-23023 February 2022 CW-2022-02-DRAFT Op Test ML22081A1252022-02-23023 February 2022 CW-2022-02-DRAFT Written Exam Comments ML22081A1242022-02-23023 February 2022 CW-2022-02-DRAFT Outlines ML22081A1262022-02-23023 February 2022 CW-2022-02-DRAFT Written Exam ML22081A1272022-02-23023 February 2022 CW-2022-02-FINAL Op Test ML22105A0062022-02-23023 February 2022 CW-2022-02-FINAL Outlines ML22081A1292022-02-23023 February 2022 CW-2022-02-Post Exam Comments ML22105A0022022-02-23023 February 2022 CW-2022-02-Public Forms ML20276A1522020-09-0909 September 2020 1-CW-2020-08 Draft Outlines ML20276A1532020-09-0909 September 2020 2-CW-2020-08 Draft Outline Comments ML20276A1552020-09-0909 September 2020 4-CW-2020-08 Written Exam Comments Final 8-25-2020 ML20276A1542020-09-0909 September 2020 3-CW-2020-08 Draft Written Exam ML20276A1582020-09-0909 September 2020 7-CW-2020-08 Outlines Final ML20276A1562020-09-0909 September 2020 5-CW-2020-08 Draft Operating Test ML20276A1572020-09-0909 September 2020 6-CW-2020-08 Operating Test Comments - Final BC Comments.Pdf ML20276A1592020-09-0909 September 2020 8-CW-2020-08 Written Exam Final ML20276A1602020-09-0909 September 2020 9-CW-2020-08 Operating Test - Final ML20276A1362020-09-0909 September 2020 10-CW-2020-08 Post-Exam Comments ML20276A1372020-09-0909 September 2020 11-CW-2020-08 Public Forms ML19099A3872019-03-18018 March 2019 Cwy 2019-03 Post Exam Comments Analysis ML19099A3792019-03-13013 March 2019 CW-2019-03 Draft Written Exam ML19099A3752019-03-13013 March 2019 Cw 2019-03 ES-301-7 Op Test Comments with Resolutions ML19099A3732019-03-13013 March 2019 CW-2019-03 Final Written Exam ML19099A3742019-03-13013 March 2019 Cw 2019-03 Draft Written Comments with Resolutions ML19099A3702019-03-13013 March 2019 CW-2019-03 Final Outlines ML19099A3762019-03-13013 March 2019 CW-2019-03 Draft Operating Test ML19099A3692019-03-13013 March 2019 CW-2019-03 Final Operating Test ML19099A3772019-03-13013 March 2019 CW-2019-03 Draft Outline Comments ML19099A3782018-09-27027 September 2018 CW-2019-03 Draft Outlines ML18143B4542018-04-25025 April 2018 Operator Licensing Examination Data ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17270A1662017-09-20020 September 2017 2017-09-DRAFT Op Test Comments ES-301-7 ML17270A1672017-09-20020 September 2017 2017-09-DRAFT Op Test ML17270A1682017-09-20020 September 2017 2017-09-DRAFT Outline Comments ML17270A1692017-09-20020 September 2017 2017-09-DRAFT Outlines ML17270A1702017-09-20020 September 2017 2017-09-Draft Written Exam Comments ES-401-9 ML17270A1712017-09-20020 September 2017 2017-09-DRAFT Written Exam ML17270A1722017-09-20020 September 2017 2017-09-FINAL Op Test ML17270A1732017-09-20020 September 2017 2017-09-FINAL Outlines ML17270A1742017-09-20020 September 2017 2017-09-Final Written Exam ML17270A1752017-09-20020 September 2017 2017-09-Post Exam Comments 2024-08-05
[Table view] |
Text
NRC Exam Question Analysis The following questions were missed by > 50% of the students on the Reactor Operator section of the ILT 2013 class NRC Written exam:
Question 5 (Missed by 60% of class)
Question 51 (Missed by 50% of class)
Question 52 (Missed by 50% of class)
Question 55 (Missed by 70% of class)
Question 61 (Missed by 100% of class)
Question 72 (Missed by 50% of class)
All questions were validated. All questions (Except Question 61) are deemed as knowledge deficiencies. Review of question, correct answer and why distractors were wrong was completed as part of the examination review. Training material review indicated material presented allowed for correct answer to be derived.
Question 61, even though covered by an objective in the training material presented to the students, its deemed a training issue since the entire population missed the question. A majority (80%) missed the question due to not identifying the correct technical specification required boron concentration of the question. A course enhancement (# XXXXXX) was entered into the Callaway Plant Training Application with the following direction: Ensure Technical Specification 3.9.3, Nuclear Instrumentation, is covered to ensure students understand the requirement to prevent reducing RCS coolant boron concentration below the limit of LCO 3.9.1.
This concept was missed by 100% of the students on the ILT 2013 NRC Written examination.
The following questions were missed by > 50% of the students on the Senior Reactor Operator section of the ILT 2013 class NRC Written exam:
Question 81 (Missed by 50% of SRO students)
Question 83 (Missed by 67% of SRO students)
Question 91 (Missed by 50% of SRO students)
All questions were validated (See discussion of Question 83 below). All questions (Except Question 83) are deemed as knowledge deficiencies. Review of question, correct answer and why distractors were wrong was completed as part of the examination review. Training material review indicated material presented allowed for correct answer to be derived.
Question 83 - All students that missed this question selected answer B:
o Question 83 could have 2 possible answers depending on how information provided in the stem of the question is interpreted by the students. The question is:
The plant is operating at 100% when the Shift Manager enters OTO-ZZ-00001, Control Room Inaccessibility, due to heat and smoke in the Control Room.
The Control Room Supervisor (CRS) will direct the Control Room Operators to
__________(1)_________ before they leave the Control Room to go to the
____________(2)__________
A. (1) trip the main turbine (2) Auxiliary Shutdown Panel B. (1) Trip all Reactor Coolant Pumps (2) Auxiliary Shutdown Panel C. (1) Trip the main turbine (2) Auxiliary Feedwater Pump Rooms D. (1) Trip all Reactor Coolant Pumps (2) Auxiliary Feedwater Pump Rooms It is agreed that the answer to part (1) of the question is Trip all Reactor Coolant Pumps which eliminates answers A and C.
It is agreed that if the students assume there is a Fire in the MCR then the CRS would go to the Auxiliary Feedwater Pump Rooms, so answer D is correct as validated.
However, if the students do NOT assume there is a Fire in the MCR then OTO-ZZ-00001 step 4 RNO would direct the CRS and Balance of Plant Operator to perform Attachment G. This attachment sends both of these operators to the Auxiliary Shutdown Panel. This would make answer B correct.
o Justification for assuming there is no fire:
When determining EALs, the students are trained that smoke without indication of a fire is classified as a Toxic gas which is separate from the classification of Fire or Explosion.
o Without the stem explicitly stating the MCR was being evacuated due to a FIRE the students that missed the question assumed there was no fire.