RNP-RA/13-0038, Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication

From kanterella
(Redirected from ML13128A072)
Jump to navigation Jump to search

Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication
ML13128A072
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/24/2013
From: Wheeler-Peavyhouse S
Duke Energy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RNP-RA/13-0038
Download: ML13128A072 (7)


Text

Duke Sharon Wheeler-Peavyhouse H. B. Robinson Steam wkEnergya Electric Plant Unit 2 Manager - Support Services Duke Energy 3581 West Entrance Road Hartsville, SC 29550 Serial: RNP-RA/13-0038 10 CFR 50.90 APR 2 4 2013 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/RENEWED LICENSE NO. DPR-23 REPLACEMENT OF TECHNICAL SPECIFICATION (TS) PAGES TO CORRECT TYPOGRAPHICAL ERRORS IN REQUEST FOR TS CHANGES REGARDING TS 3.1.4 ROD GROUP ALIGNMENT LIMITS AND TS 3.1.7 ROD POSITION INDICATION By letter dated June 8, 2012, (Agencywide Documents Access and Management System Accession No. ML12172A260), pursuant to 10 CFR 50.90, Carolina Power and Light Company requested an amendment to the H. B. Robinson Steam Electric Plant, Unit No. 2 renewed facility operating license DPR-23, Appendix A, Technical Specifications (TS) Sections 3.1.4, "Rod Group Alignment Limits," and TS 3.1.7, "Rod Position Indication." The TS page 3.1-15 of Attachment 1, Proposed Technical Specifications Changes (Mark-Up), and TS pages 3.1-6 and 3.1-15 of Attachment 2, Revised and Retyped Technical Specifications Pages, to the June 8, 2012 letter contained typographical errors. TS page 3.1-15 deleted the word ACTIONS from the Limiting Conditions for Operations (LCO) section of the TS and erroneously entered the number 3.1.7 in its place and incorrectly located a revision bar in the margin of the page; on TS page 3.1-6 the revision bar was inadvertently omitted.

Attached please find a replacement TS page (page 3.1-15) for Attachment 1 and replacement TS pages (pages 3.1-6 and 3.1-15) for Attachment 2 to the June 8, 2012 letter. There are no other changes or additions to the attachments to June 8, 2012 letter which presented the proposed TS page markups, the retyped TS pages, and marked up bases pages (for information only) for proposed changes to TS 3.1.4 and 3.1.7.

The correction of the typographical errors on TS pages 3.1-6 and 3.1-15 do not affect the conclusions of either the 10 CFR 50.92 No Significant Hazards Consideration Determination or the Environmental Consideration included in theenclosure to the June 8, 2012 letter.

This document contains no new Regulatory Commitments.

If you have any questions regarding this submittal, please contact Mr. Richard Hightower, Supervisor - Licensing/Regulatory Programs at (843) 857-1329.

United States Nuclear Regulatory Commission Serial: RNP-RAI13-0038 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct. Executed On: a 21, 20ti Sincerely, Sharon Wheeler-Peavyhouse Manager - Support Services - Nuclear SWP/sc Attachments: Replacement Pages for TS Page 3.1-15 of Attachment 1 and TS Pages 3.1-6 and 3.1-15 of Attachment 2 of RNP-RAI12-0028.

cc: Ms. S. E. Jenkins, Manager, Infectious and Radioactive Waste Management Section (SC) Mr. V. M. McCree, NRC Region II Ms. A. T. Billoch Col6n, NRC Project Manager, NRR NRC Resident Inspectors, HBRSEP Mr. A. Wilson, Attorney General (SC) to Serial: RNP-RA/13-0038 2 Pages (including cover page)

ATTACHMENT 1 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGES (MARK-UP)

Rod Position Indication 3.1.7 3.1 REACTIVITY CONTROL SYSTEMS 3.1.7 Rod Position Indication LCO 3.1.7 The Analog Rod Position Indication (ARPI) System and the Demand Position Indication System shall be OPERABLE.


-Note Individual Rod Position APPLICABILITY: MODES 1 and 2. Indicators may be outside their limits for <1 hour following substantial rod movement.

ACTIONS


NOTE-------------------------------

Separate Condition entry is allowed for each inoperable rod position indicator per group and each demand position indicator per bank.

CONDITION REQUIRED ACTION COMPLETION TIME A. One ARPI per group inoperable for one or more A. 1 Verify the position of the Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> groups. rods with inoperable position indicators by using movable incore detectors.

OR A.2 Reduce THERMAL 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> POWER to <50% RTP.

B. One or more rods with B. 1 Verify the position of the 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable position rods with inoperable indicators have been position indicators by moved in excess of using movable incore 24 steps in one direction detectors.

since the last determination of the rod's position. OR (continued)

HBRSEP Unit No. 2 3.1-15 Amendment No. 2-1-8 to Serial: RNP-RA/1 3-0038 3 Pages (including cover page)

ATTACHMENT 2 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 REVISED AND RETYPED TECHNICAL SPECIFICATIONS PAGES

Rod Group Alignment Limits 3.1.4 3.1 REACTIVITY CONTROL SYSTEMS 3.1.4 Rod Group Alignment Limits LCO 3.1.4 All shutdown and control rods shall be OPERABLE.

AND Individual indicated rod positions shall be as follows:

a. For bank demand positions > 200 steps, each rod shall be within 15 inches of its bank demand position, and
b. For bank demand positions < 200 steps, each rod shall be within 7.5 inches of the average of the individual rod positions in the bank.

NOTE -----------------------------------------------

Individual RPIs may be outside their limits for <1 hour following substantial rod movement.

APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more rod(s) A. 1.1 Verify SDM is within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Inoperable. the limits provided in the COLR.

OR A.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SDM to within limit.

AND A.2 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> (continued)

HBRSEP Unit No. 2 3.1-6 Amendment No.

Rod Position Indication 3.1.7 3.1 REACTIVITY CONTROL SYSTEMS 3.1.7 Rod Position Indication LCO 3.1.7 The Analog Rod Position Indication (ARPI) System and the Demand Position Indication System shall be OPERABLE.


Note -------------------------

Individual Rod Position Indicators may be outside their limits for <1 hour following substantial rod movement.

APPLICABILITY: MODES 1 and 2.

ACTIONS


NOTE ------------------------------------------------------------

Separate Condition entry is allowed for each inoperable rod position indicator per group and each demand position indicator per bank.

CONDITION REQUIRED ACTION COMPLETION TIME A. One ARPI per group inoperable for one or more A. 1 Verify the position of the Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> groups. rods with inoperable position indicators by using movable incore detectors.

OR A.2 Reduce THERMAL 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> POWER to <50% RTP.

B. One or more rods with B. 1 Verify the position of the 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable position rods with inoperable indicators have been position indicators by moved in excess of using movable incore 24 steps in one direction detectors.

since the last determination of the rod's OR position.

(continued)

HBRSEP Unit No. 2 3.1-15 Amendment No.