Apr.
26, 2013 Page 1
of 2
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2013-18765 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#:
0363 Address: NUCSA2 Phone#:
254-3194 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSE M 04/26/2013 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE
- UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION:
"REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TRM2 -
TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 03/27/2013 ADD MANUAL TABLE OF CONTENTS DATE: 04/25/2013 CATEGORY:
DOCUMENTS TYPE: TRM2
Apr.
26, 2013 Page 2
of 2
ID:
TEXT 3.2.1 ADD:
REV:
10 REMOVE:
REV:9 CATEGORY: DOCUMENTS TYPE: TRM2 ID:
TEXT 3.4.6 ADD:
REV: 1 REMOVE:
REV:0 CATEGORY:
DOCUMENTS ID:
TEXT B3.4.6 ADD:
REV: 1 TYPE: TRM2 REMOVE:
REV:O CATEGORY:
DOCUMENTS TYPE: TRM2 ID:
TEXT LOES ADD:
REV: 78 REMOVE:
REV:77 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL
- USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date:
0 Procedure Name TEXT LOES
Title:
LIST OF EFF 4/25/2013 Rev Issue Date 78 04/25/2013 ECTIVE SECTIONS Change ID Change Number TEXT TOC
Title:
22 10/09/2012 TABLE OF CONTENTS TEXT 1.1 0
11/19/2002
Title:
USE AND APPLICATION DEFINITIONS TEXT 2.1 1
02/04/2005
Title:
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 10 01/13/2011
Title:
PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 5
06/20/2012
Title:
APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT 3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT 3.1.3 4
05/14/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 10 04/25/2013
Title:
CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)
LDCN 4712 Page 1 of 15 Report Date: 04/26/13 Page 1 of 15 Report Date: 04/26/13
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0
11/19/2002
Title:
INSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2 3
03/31/2011
Title:
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3. 3.3
Title:
INSTRUMENTATION 2
11/09/2007 METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4 6
07/09/2010
Title:
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5 0
11/19/2002
Title:
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6
Title:
INSTRUMENTATION 3
01/13/2011 TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1
11/09/2007
Title:
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8 1
10/22/2003
Title:
INSTRUMENTATION TRM RPS INSTRUMENTATION TEXT 3.3.9 3
05/14/2009
Title:
INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION TEXT 3.3.10
Title:
INSTRUMENTATION TEXT 3.3.11
Title:
INSTRUMENTATION TEXT 3.3.12 1
12/14/2004 REACTOR RECIRCULATION PUMP MG SET STOPS 1
10/22/2003 MVP ISOLATION INSTRUMENTATION 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION Page 2.
of 15 Report Date: 04/26/13 Page 2 of 15 Report Date: 04/26/13
SSES MANUAL
- . Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1
Title:
REACTOR TEXT 3.4.2
Title:
REACTOR TEXT 3.4.3
Title:
REACTOR TEXT 3.4.4
Title:
REACTOR TEXT 3.4.5
Title:
REACTOR TEXT 3.4.6
Title:
REACTOR TEXT 3.5.1 1
04/26/2006 COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY 1
04/16/2009 COOLANT SYSTEM STRUCTURAL INTEGRITY 1
11/09/2007 COOLANT SYSTEM REACTOR COOLANT SYSTEM (RCS) 2 05/14/2009 COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 1
04/26/2006 COOLANT SYSTEM REACTOR VESSEL MATERIALS 1
04/25/2013 RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION 1
02/04/2005
Title:
ECCS AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1
11/09/2007
Title:
ECCS AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0
11/19/2002
Title:
ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0
11/19/2002
Title:
CONTAINMENT VENTING OR PURGING TEXT 3.6.2 1
08/23/2011
Title:
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0
11/19/2002
Title:
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Pages of 15 Report Date: 04/26/13 Page 1 of 15 Report Date: 04/26/13
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.6.4 0
11/19/2002
Title:
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1
Title:
PLANT TEXT 3.7.2
Title:
PLANT TEXT 3.7.3.1
Title:
PLANT TEXT 3.7.3.2
Title:
PLANT TEXT 3.7.3.3
Title:
PLANT TEXT 3.7.3.4
Title:
PLANT TEXT 3.7.3.5
Title:
PLANT TEXT 3.7.3.6
Title:
PLANT TEXT 3.7.3.7
Title:
PLANT TEXT 3.7.3.8
Title:
PLANT TEXT 3.7.4
Title:
PLANT 0
11/19/2002 SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW)
SHUTDOWN 0
11/19/2002 SYSTEMS ULTIMATE HEAT SINK (UHS)
AND GROUND WATER LEVEL 2
04/16/2009 SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM 3
04/16/2009 SYSTEMS SPRAY AND SPRINKLER SYSTEMS 3
04/16/2009 SYSTEMS C02 SYSTEMS 2
04/16/2009 SYSTEMS HALON SYSTEMS 2
04/16/2009 SYSTEMS FIRE HOSE STATIONS 2
04/16/2009 SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES 1
04/26/2006 SYSTEMS FIRE RATED ASSEMBLIES 11 09/27/2012 SYSTEMS FIRE DETECTION INSTRUMENTATION 1
04/26/2006 SYSTEMS SOLID RADWASTE SYSTEM Pane 4 of 15 Report Date: 04/26/13 Page A of 15 Report Date: 04/26/13
SSES MANUAL.
Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.7.5.1
Title:
PLANT TEXT 3.7.5.2
Title:
PLANT TEXT 3.7.5.3
Title:
PLANT TEXT 3.7.6
Title:
PLANT TEXT 3.7.7 0
11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR 0
11/19/2002 SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE 1
04/26/2006 SYSTEMS LIQUID HOLDUP TANKS 3
06/04/2012 SYSTEMS ESSW PUMPHOUSE VENTILATION 2
09/05/2008
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 8
09/13/2012
Title:
PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1
08/28/2006
Title:
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1
12/14/2004
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11
Title:
PLANT SYSTEMS 1
10/02/2009 TEXT 3.8.1 3
06/20/2012
Title:
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2
11/09/2007
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8.2.2 2
12/14/2004
Title:
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page 5 of 15 Report Date: 04/26/13
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.8.3
Title:
ELECTRICAL TEXT 3.8.4
Title:
ELECTRICAL TEXT 3.8.5
Title:
ELECTRICAL TEXT 3.8.6
Title:
ELECTRICAL TEXT 3.8.7 2
06/20/2012 POWER DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 1
02/04/2005 POWER 24 VDC ELECTRICAL SUBSYSTEM 0
11/19/2002 POWER DEGRADED VOLTAGE PROTECTION 2
06/20/2012 POWER EMERGENCY SWITCHGEAR ROOM COOLING 2
10/22/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.1 1
04/26/2006
Title:
MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1
04/09/2007
Title:
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3 2
06/15/2010
Title:
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.11.1.1 1
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION Page 6 of 15 Report Date: 04/26/13 Page ý of 15 Report Date: 04/26/13
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.1.2
Title:
RADIOACTIVE TEXT 3.11.1.3
Title:
RADIOACTIVE TEXT 3.11.1.4
Title:
RADIOACTIVE TEXT 3.11.1.5
Title:
RADIOACTIVE TEXT 3.11.2.1
Title:
RADIOACTIVE TEXT 3.11.2.2
Title:
RADIOACTIVE TEXT 3.11.2.3
Title:
RADIOACTIVE FORM TEXT 3.11.2.4
Title:
RADIOACTIVE TEXT 3.11.2.5
Title:
RADIOACTIVE TEXT 3.11.2.6
Title:
RADIOACTIVE TEXT 3.11.3
Title:
RADIOACTIVE TEXT 3.11.4.1
Title:
RADIOACTIVE EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS EFFLUENTS 1
04/26/2006 LIQUID EFFLUENTS DOSE 1
04/26/2006 LIQUID WASTE TREATMENT SYSTEM 2
10/09/2012 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 2
05/02/2007 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION 3
04/26/2006 DOSE RATE 1
04/26/2006 DOSE -
NOBLE GASES 1
04/26/2006 DOSE -
11/19/2002 GASEOUS RADWASTE TREATMENT SYSTEM 3
11/14/2006 EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM 4
09/16/2009 EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION EFFLUENTS EFFLUENTS 1
04/26/2006 TOTAL DOSE 3
04/26/2006 MONITORING PROGRAM LDCN 5008 Page 2 of 15 Report Date: 04/26/13 Page 7 of 15 Report Date: 04/26/13
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.11.4.2 2
04/26/2006
Title:
RADIOACTIVE EFFLUENTS LAND USE CENSUS 0
TEXT 3.11.4.3
Title:
RADIOACTIVE EFFLUENTS TEXT 3.12.1
Title:
LOADS CONTROL PROGRAM 1
04/26/2006 INTERLABORATORY COMPARISON PROGRAM 0
11/19/2002 CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4
04/17/2008
Title:
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3 0
11/19/2002
Title:
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENTS TEXT 4.1
Title:
0 09/27/2003 ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2
Title:
TEXT 4.3
Title:
TEXT 4.4
Title:
TEXT 4.5
Title:
TEXT 4.6
Title:
TEXT 4.7
Title:
ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE ADMINISTRATIVE 0
09/27/2003 CONTROLS REPORTABLE EVENT ACTION 0
09/27/2003 CONTROLS SAFETY LIMIT VIOLATION 1
12/18/2008 CONTROLS PROCEDURES & PROGRAMS 0
09/27/2003 CONTROLS REPORTING REQUIREMENTS 0
09/27/2003 CONTROLS RADIATION PROTECTION PROGRAM 0
09/27/2003 CONTROLS TRAINING Page~
of
- 15.
Report Date: 04/26/13 Page 8 of 15 Report Date: 04/26/13
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.0 5
06/20/2012
Title:
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO)
APPLICABILITY TEXT B3.1.1 1
11/09/2007
Title:
REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI)
INSTRUMENTATION TEXT B3.1.2 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD DRIVE (CRD)
HOUSING SUPPORT TEXT B3.1.3 3
04/10/2007
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0
11/19/2002
Title:
REACTIVITY CONTROL SYSTEM BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT B3.2.1 0
11/19/2002
Title:
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)
TEXT B3.3.1
Title:
INSTRUMENTATION TEXT B3.3.2
Title:
INSTRUMENTATION TEXT B3.3.3
Title:
INSTRUMENTATION TEXT B3.3.4
Title:
INSTRUMENTATION TEXT B3.3.5
Title:
INSTRUMENTATION TEXT B3.3.6
Title:
INSTRUMENTATION 0
11/19/2002 BASES RADIATION MONITORING INSTRUMENTATION 2
03/31/2011 BASES SEISMIC MONITORING INSTRUMENTATION 2
11/09/2007 BASES METEOROLOGICAL MONITORING INSTRUMENTATION 4
07/09/2010 BASES TRM POST ACCIDENT MONITORING (PAM)
INSTRUMENTATION 2
11/09/2007 BASES THIS PAGE INTENTIONALLY LEFT BLANK 4
01/13/2011 BASES TRM ISOLATION ACTUATION INSTRUMENTATION Pagei of 25.
Report Date: 04/26/13 Page 9 of 15 Report Date: 04/26/13
SSES M(ANUAL3 Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.3.7
Title:
INSTRUMENTATION TEXT B3.3.8
Title:
INSTRUMENTATION TEXT B3.3.9
Title:
INSTRUMENTATION TEXT B3.3.10
Title:
INSTRUMENTATION TEXT B3.3.11
Title:
INSTRUMENTATION 1
11/09/2007 BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM 1
10/22/2003 BASES TRM RPS INSTRUMENTATION 3
05/14/2009 BASES LPRM UPSCALE ALARM INSTRUMENTATION 3
02/22/2012 BASES REACTOR RECIRCULATION PUMP MG 1
10/22/2003 BASES MVP ISOLATION INSTRUMENTATION SET STOPS TEXT B3.3.12 0
04/16/2009
Title:
WATER MONITORING INSTRUMENTATION TEXT B3.4.1
Title:
REACTOR TEXT B3.4.2
Title:
REACTOR TEXT B3.4.3
Title:
REACTOR TEXT B3.4.4
Title:
REACTOR TEXT B3.4.5
Title:
REACTOR TEXT B3.4.6 0
11/19/2002 COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY 1
04/16/2009 COOLANT SYSTEM BASES STRUCTURAL INTEGRITY 1
11/09/2007 COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR 0
11/19/2002 COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT 0
11/19/2002 COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS 1
04/25/2013
Title:
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION Page 10 of 15 Report Date: 04/26/13
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.1 0
11/19/2002
Title:
ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1
11/09/2007
Title:
ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1
11/09/2007
Title:
ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0
11/19/2002
Title:
CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0
11/19/2002
Title:
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1
04/19/2007
Title:
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4 1
12/14/2004
Title:
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1
Title:
PLANT TEXT B3.7.2
Title:
PLANT TEXT B3.7.3.1
Title:
PLANT TEXT B3.7.3.2
Title:
PLANT TEXT B3.7.3.3
Title:
PLANT SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN) 0 11/19/2002 ULTIMATE HEAT SINK (UHS)
GROUND WATER LEVEL 3
06/15/2010 FIRE SUPPRESSION WATER SUPPLY SYSTEM 2
04/26/2006 SPRAY AND SPRINKLER SYSTEMS 0
11/19/2002 C02 SYSTEMS Page Jj of 15 Report Date: 04/26/13 Page 11 of 15 Report Date: 04/26/13
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.4
Title:
PLANT TEXT B3.7.3.5
Title:
PLANT TEXT B3.7.3.6
Title:
PLANT TEXT B3.7.3.7
Title:
PLANT TEXT B3.7.3.8
Title:
PLANT TEXT B3.7.4
Title:
PLANT TEXT B3.7.5.1
Title:
PLANT TEXT B3.7.5.2
Title:
PLANT TEXT B3.7.5.3
Title:
PLANT TEXT B3.7.6
Title:
PLANT TEXT B3.7.7
Title:
PLANT 1
04/26/2006 SYSTEMS BASES HALON SYSTEMS SYSTEMS BASES 1
04/26/2006 FIRE HOSE STATIONS 1
04/26/2006 YARD FIRE HYDRANTS AND SYSTEMS BASES HYDRANT HOSE HOUSES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 FIRE RATED ASSEMBLIES 3
09/27/2012 FIRE DETECTION INSTRUMENTATION 0
11/19/2002 SYSTEMS BASES SOLID RADWASTE SYSTEM 0
11/19/2002 MAIN CONDENSER OFFGAS HYDROGEN MONITOR SYSTEMS BASES 0
11/19/2002 SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE SYSTEMS BASES SYSTEMS BASES SYSTEMS BASES 0
11/19/2002 LIQUID HOLDUP TANKS 3
06/04/2012 ESSW PUMPHOUSE VENTILATION 2
01/31/2008 MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 3
06/21/2007
Title:
PLANT SYSTEMS BASES SNUBBERS Page 12 of 15 Report Date: 04/26/13 Page 12 of.15 Report Date: 04/26/13
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.9
Title:
PLANT SYSTEMS TEXT B3.7.10
Title:
PLANT SYSTEMS TEXT B3.7.11
Title:
STRUCTURAL IN TEXT B3.8.1
Title:
ELECTRICAL P0 PROTECTIVE DE 2
12/08/2011 BASES CONTROL STRUCTURE HVAC 1
12/14/2004 BASES SPENT FUEL STORAGE POOLS 2
04/14/2010 TEGRITY 2
03/10/2010 WER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT VICES TEXT B3.8.2.1
Title:
ELECTRICAL CONTINUOUS TEXT B3.8.2.2
Title:
ELECTRICAL AUTOMATIC TEXT B3.8.3
Title:
ELECTRICAL TEXT B3.8.4
Title:
ELECTRICAL TEXT B3.8.5
Title:
ELECTRICAL TEXT B3.8.6
Title:
ELECTRICAL TEXT B3.8.7 0
11/19/2002 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
1 09/17/2004 POWER BASES MOTOR OPERATED VALVES (MOV)
THERMAL OVERLOAD PROTECTION -
0 11/19/2002 POWER BASES DIESEL GENERATOR (DG)
MAINTENANCE ACTIVITIES 0
11/19/2002 POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM 0
11/19/2002 POWER BASES DEGRADED VOLTAGE PROTECTION 3
06/20/2012 POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING 1
06/15/2009
Title:
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0
11/19/2002
Title:
REFUELING OPERATIONS BASES DECAY TIME Page 13.
of 15 Report Date: 04/26/13 Page 13 of 15 Report Date: 04/26/13
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.9.2 0
11/19/2002
Title:
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0
11/19/2002
Title:
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.1 0
11/19/2002
Title:
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1
04/10/2007
Title:
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0
11/19/2002
Title:
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.11.1.1
Title:
RADIOACTIVE TEXT B3.11.1.2
Title:
RADIOACTIVE TEXT B3.11.1.3
Title:
RADIOACTIVE TEXT B3.11.1.4
Title:
RADIOACTIVE TEXT B3.11.1.5
Title:
RADIOACTIVE 0
BASES 11/19/2002 LIQUID EFFLUENTS CONCENTRATION EFFLUENTS 0
11/19/2002 EFFLUENTS BASES LIQUID EFFLUENTS DOSE 0
11/19/2002 BASES LIQUID WASTE TREATMENT SYSTEM EFFLUENTS EFFLUENTS EFFLUENTS 0
BASES 0
BASES 1
BASES 11/19/2002 LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION 11/19/2002 RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT B3.11.2.1
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.2.2
Title:
RADIOACTIVE EFFLUENTS 12/14/2004 DOSE RATE 0
11/19/2002 BASES DOSE -
NOBLE GASES Page JA of 15 Report Date: 04/26/13 Page !A of 15 Report Date: 04/26/13
SSES MANUAL Manual Name:
TRM2 Manual
Title:
TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.11.2.3
Title:
RADIOACTIVE EFFLUENTS PARTICULATES FORM TEXT B3.11.2.4
Title:
RADIOACTIVE EFFLUENTS 0
BASES 0
BASES 11/19/2002 DOSE -
11/14/2006
Title:
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6
Title:
RADIOACTIVE EFFLUENTS INSTRUMENTATION TEXT B3.11.3
Title:
RADIOACTIVE EFFLUENTS TEXT B3.11.4.1
Title:
RADIOACTIVE EFFLUENTS 1
BASES 0
BASES 3
BASES 01/27/2004 RADIOACTIVE GASEOUS 11/19/2002 TOTAL DOSE 07/09/2010 MONITORING PROGRAM EFFLUENT MONITORING TEXT B3.11.4.2 0
11/19/2002
Title:
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3
Title:
RADIOACTIVE EFFLUENTS TEXT B3.12.1
Title:
LOADS CONTROL PROGRAM TEXT B3.12.2
Title:
LOADS CONTROL PROGRAM TEXT B3.12.3
Title:
LOADS CONTROL PROGRAM 0
BASES 11/19/2002 INTERLABORATORY COMPARISON PROGRAM 1
10/04/2007 BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL 1
12/03/2010 BASES HEAVY LOADS REQUIREMENTS 0
11/19/2002 BASES LIGHT LOADS REQUIREMENTS Page ~
of 15.
Report Date: 04/26/13 Page 15 of 15 Report Date: 04/26/13
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 78 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date TOC TABLE OF CONTENTS 1.0 USE AND APPLICATION Page TRM / 1.0-1 Page TRM / 1.0-2 Page TRM / 1.0-3 2.0 3.0 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 and TRM 2.0-3 Page TRM / 2.0-4 Page TRM / 2.0-5 Page TRM / 2.0-6 Page TRM / 2.0-7 Pages TRM / 2.0-8 and TRM / 2.0-9 Page TRM / 2.0-10 Page TRM / 2.0-11 Page TRM / 2.0-12 Pages TRM / 2.0-13 and TRM / 2.0-14 Page TRM / 2.0-15 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 Page TRM / 3.0-3 Page TRM / 3.0-4 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 Pages TRM / 3.1-2 through TRM / 3.1-5 Page TRM / 3.1-6 Page TRM / 3.1-7 Page TRM / 3.1-8 Pages TRM / 3.1-9 and TRM / 3.1-9a Page TRM / 3.1-10 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 Pages TRM / 3.2-2 through TRM / 3.2-55 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 Pages TRM / 3.3-4 and TRM / 3.3-5 Page TRM / 3.3-6 Page TRM 3.3-7 Page 3.3-8 10/09/2012 08/31/1998 10/04/2002 08/31/1998 08/31/1998 01/28/2005 06/25/2002 04/12/1999 04/15/2009 05/15/2008 01/07/2011 02/02/2010 11/15/2004 04/15/2009 11/15/2004 11/15/2005 06/12/2012 03/15/2002 11/30/2005 10/31/2007 08/31/1998 03/27/2007 04/15/2009 03/27/2007 02/18/1999 02/18/1999.
08/31/1998 04/25/2013 07/16/1999 10/31/2007 03/10/2011 10/31/2007 08/31/1998 3.1 3.2 3.3 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 04/25/2013
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 78 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.4 Pages TRM / 3.3-9 and TRM / 3.3-9a Page TRM / 3.3-10 Pages TRM / 3.3-11 and TRM / 3.3-11 a Page TRM / 3.3-12 Page TRM / 3.3-13 Page TRM / 3.3-14 Pages TRM / 3.3-15 and TRM / 3.3-16 Page TRM / 3.3-17 Page TRM / 3.3-18 Pages TRM / 3.3-19 and TRM / 3.3-20 Page TRM / 3.3-21 Page TRM / 3.3-21a Pages TRM /3.3-21b through TRM / 3.3-21d Page TRM / 3.3-22 Pages TRM / 3.3-23 and TRM / 3.3-24 Page TRM / 3.3-25 Pages TRM / 3.3-26 and TRM / 3.3-27 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 Pages 3.4-2 through 3.4-5 Pages TRM / 3.4-6 through TRM / 3.4-8 Page 3.4-9 Page 3.4-10 Page 3.4-11 Page TRM / 3.4-12 Page TRM / 3.4-13 Page TRM / 3.4-14 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 Pages 3.5-2 and 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 CONTAINMENT Pages 3.6-1 and 3.6-2 Pages TRM / 3.6-3 and TRM / 3.6-3a Page 3.6-4 Page TRM / 3.6-5 Page 3.6-6 Pages TRM / 3.6-7 through TRM / 3.6-9 06/30/2010 10/31/2007 06/30/2010 03/30/2001 01/07/2011 12/14/1998 01/07/2011 06/14/2002 10/31/2007 10/22/2003 04/15/2009 11/15/2004 03/27/2007 12/03/2004 05/16/2003 10/22/2003 04/07/2009 03/31/2006 10/23/1998 04/01/2009 08/31/1998 10/31/2007 08/31/1998 04/17/2009 03/31/2006 04/25/2013 01/28/2005 08/31/1998 10/31/2007 08/31/1998 08/31/1998 08/11/2011 08/31/1998 01/07/2002 08/31/1998 12/31/2002 3.5 3.6 SUSQUEHANNA - UNIT 2 TRM / LOES-2 EFFECTIVE DATE 04/25/2013
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 78 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 Page 3.7-3 Page TRM / 3.7-4 Page TRM / 3.7-5 Pages TRM / 3.7-6 through TRM / 3.7-8 Pages TRM / 3.7-9 and TRM / 3.7-10 Page TRM / 3.7-11 Page TRM / 3.7-12 Page TRM / 3.7-13 Page TRM / 3.7-14 Pages TRM / 3.7-15 and TRM / 3.7-16 Page TRM / 3.7-17 Page TRM / 3.7-18 Page TRM / 3.7-19 Pages TRM / 3.7-20 through TRM / 3.7-22 Page TRM / 3.7-23 Page TRM / 3.7-24 Page TRM / 3.7-25 Page TRM / 3.7-26 Page TRM / 3.7-27 Pages TRM / 3.7-28 through TRM / 3.7-33 Page TRM / 3.7-34 Pages TRM / 3.7-35 and TRM / 3.7-36 Pages 3.7-37 through 3.7-38 Page TRM / 3.7-39 Page TRM / 3.7-40 Pages TRM / 3.7-40a through TRM / 3.7-40c Page TRM / 3.7-41 Page TRM / 3.7-42 Pages TRM / 3.7-43 through TRM / 3.7-45 Page TRM / 3.7-46 Page TRM / 3.7-47 Page TRM / 3.7-48 Page TRM / 3.7-49 Page TRM / 3.7-50 Page TRM / 3.7-51 Page TRM / 3.7-52 Page TRM / 3.7-53 Page TRM / 3.7-54 Page TRM / 3.7-55 Page TRM / 3.7-56 07/29/1999 08/31/1998 03/31/2006 04/07/2009 08/02/1999 04/07/2009 01/21/2000 08/02/1999 04/07/2009 08/09/2005 08/02/1999 04/07/2009 08/02/1999 04/07/2009 08/02/1999 04/07/2009 03/31/2006 08/02/1999 09/25/2012 11/24/2011 09/25/2012 03/31/2006 02/01/1999 08/31/1998 03/31/2006 05/24/2012 05/24/2012 09/04/2008 08/31/1998 10/05/2006 06/07/2007 09/05/2012 06/07/2007 03/09/2001 08/16/2006 12/03/2004 04/15/2003 07/29/1999 04/01/2009 09/25/2009 04/01/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 04/25/2013
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 78 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date 3.8 3.9 3.10 ELECTRICAL POWER Page TRM / 3.8-1 Page TRM / 3.8-2 Pages TRM / 3.8-3 and TRM / 3.8-4 Pages TRM / 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-12 Page TRM / 3.8-13 Page TRM / 3.8-14 Page TRM / 3.8-15 Pages TRM / 3.8-16 and TRM / 3.8-17 Page 3.8-18 Page TRM / 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Page TRM / 3.8-24 Page TRM / 3.8-25 Pages TRM / 3.8-25a and TRM / 3.8-25b Page TRM / 3.8-26 Page TRM / 3.8-27 Page TRM / 3.8-28 Page TRM / 3.8-29 04/02/2002 01/28/2005 06/12/2012 04/02/2002 10/31/2007 08/10/2004 12/03/2004 06/12/2012 08/31/1998 01/28/2005 04/02/2002 02/01/1999 04/02/2002 02/01/1999 06/06/1999 11/30/2011 06/11/2012 11/30/2011 05/28/2009 11/29/2006 05/28/2009 10/20/2009 08/31/1998 03/31/2006 08/30/1998 03/27/2007 06/10/2010 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 3.11 MISCELLANEOUS Page TRM / 3.10-1 Pages 3.10-2 through 3.10-4 Pages TRM / 3.10-5 and TRM / 3.10-6 Page TRM / 3.10-7 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 Pages 3.11-2 through 3.11-3 Page TRM / 3.11-4 Page 3.11-5 Page TRM / 3.11-6 Pages 3.11-7 and TRM / 3.11-8 Pages TRM / 3.11-9 and TRM / 3.11-10 Pages TRM / 3.11-11 and TRM / 3.11-12 Page TRM / 3.11-13 Page TRM / 3.11-14 Pages 3.11-15 and 3.11-16 Page TRM / 3.11-17 03/31/2006 08/31/1998 03/31/2006 08/31/1998 03/31/2006 08/31/1998 10/09/2012 08/31/1998 04/12/2007 12/03/1004 09/01/1998 03/31/2006 SUSQUEHANNA
- UNIT 2 TRM / LOES-4 EFFECTIVE DATE 04/25/2013 SUSQUEHANNA - UNIT 2 TRM /LOES-4 EFFECTIVE DATE 04/25/2013
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 78 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page 3.11-18 Page TRM / 3.11-19 Pages TRM / 3.11-20 and TRM / 3.11-21 Page TRM / 3.11-22 Page TRM / 3.11-23 Page TRM / 3.11-24 Page TRM / 3.11-25 Pages TRM / 3.11-26 and TRM / 3.11-27 Page TRM / 3.11-28 Page TRM / 3.11-29 Pages TRM 3.11-30 through TRM / 3.11-32 Page TRM / 3.11-33 Page 3.11-34 Page TRM / 3.11-35 Pages TRM / 3.11-36 through TRM / 3.11-39 Pages 3.11-40 through 3.11-44 Page TRM / 3.11-45 Page 3.11-46 Page TRM / 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 Page TRM / 3.12-4 Page TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 Page TRM / 4.0-4 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 08/15/2005 03/31/2006 04/02/2002 11/14/2006 05/13/2005 04/12/2007 01/21/2004 09/08/2009 12/03/2004 01/21/2004 03/31/2006 08/31/1998 03/31/2006 11/30/2005 08/31/1998 03/31/2006 08/31/1998 03/31/2006 02/05/1999 03/14/2008 02/05/1999 08/31/1998 12/11/2008 08/31/1998 3.12 4.0 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 04/25/2013
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 78 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 Page TRM / B 3.0-4 Pages TRM / B 3.0-5 through TRM / B 3.0-7 Pages TRM / B 3.0-8 through TRM / B 3.0-10 Pages TRM / B 3.0-11 and TRM / B 3.0-12 Pages TRM / B 3.0-13 and TRM / B 3.0-14 Page TRM / B 3.0-15 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 Pages TRM / B 3.1-2 and TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM / B 3.1-8 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 Page TRM / B 3.3-2 Page TRM / B-3.3-2a Pages TRM / B 3.3-3 and TRM / B 3.3-3a Page TRM / B 3.3-4 Page TRM / B 3.3-5 Page TRM / B 3.3-6 Page TRM / B 3.3-7 Page TRM / B 3.3-8 Page TRM / B 3.3-9 Pages TRM / B 3.3-10 through TRM / B 3.3-13 Page TRM / B 3.3-14 Page TRM / B 3.3-14a Page TRM / B 3.3-14b Pages TRM / B 3.3-15 through TRM / B 3.3-17 Pages TRM / B 3.3-18 and TRM / B 3.3-19 Pages TRM / B 3.3-19a and TRM / B 3.3-19b Page TRM / B 3.3-19c Pages TRM / B 3.3-19d and TRM / B 3.3-19e Page TRM / B 3.3-20 Page TRM / B 3.3-21 Page TRM / B 3.3-22 Page TRM / B 3.3-23 Pages TRM / B 3.3-24 and TRM / B 3.3-25 08/31/1998 01/10/2007 06/12/2012 08/31/1998 03/15/2002 11/30/2005 03/15/2002 07/13/1999 10/31/2007 08/31/1998 03/27/2007 02/18/1999 08/31/1998 04/07/2000 03/10/2011 10/31/2007 10/31/2007 06/30/2010 05/30/2006 06/30/2010 10/31/2007 06/30/2010 10/31/2007 01/07/2011 06/25/2002 10/31/2007 06/14/2002 10/22/2003 03/27/2007 03/27/2007 04/17/2009 03/27/2007 02/16/2012 08/03/2010 10/22/2003 05/16/2003 04/07/2009 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 04/25/2013 SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 04/25/2013
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 78 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.4 B 3.5 B 3.6 REACTOR COOLANT SYSTEM BASES Page TRM / B 3.4-1 Pages TRM / B 3.4-2 and TRM / B3.4-3 Pages TRM / B 3.4-4 and TRM / B 3.4-4a Page TRM / B 3.4-5 Page B 3.4-6 Page TRM / B 3.4-7 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 Pages TRM / B 3.5-3 and TRM / B 3.5-3a Page B 3.5-4 Page TRM / B 3.5-5 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Page TRM / B 3.6-6 Pages TRM / B 3.6-7 through TRM / B 3.6-11 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Page TRM / B 3.7-3 Page TRM / B 3.7-3a Page TRM / B 3.7-4 Page TRM / B 3.7-5 Pages TRM / B 3.7-6 and TRM / B 3.7-6a Pages TRM / B 3.7-7 and TRM / B 3.7-7a Page TRM / B 3.7-8 Page TRM / B 3.7-9 Page TRM / B 3.7-10 Pages TRM / B 3.7-1Oa through TRM / B 3.7-11 a Pages TRM / B 3.7-12 and TRM / B 3.7-13 Pages TRM / B 3.7-14 through TRM / B 3.7-14b Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Page TRM / B 3.7-21 Pages TRM / B 3.7-21a through TRM / 3.7-21g Pages TRM / B 3.7-22 and TRM / B 3.7-23 Pages TRM / B 3.7-24 through TRM / B 3.7-29 08/31/1998 04/01/2009 10/31/2007 10/15/1999 08/31/1998 04/25/2013 08/31/1998 10/31/2007 08/31/1998 10/31/2007 07/26/2001 02/01/1999 08/31/1998 03/29/2007 04/04/2007 12/03/2004 12/31/2002 08/31/1998 06/10/2010 12/27/2007 03/31/2006 08/02/1999 03/31/2006 08/02/1999 08/02/1999 03/31/2006 08/02/1999 03/31/2006 08/02/1999 09/25/2012 02/01/1999 08/31/1998 05/24/2012 05/24/2012 01/30/2008 10/05/2006 B 3.7 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 04/25/2013 SUSQUEHANNA - UNIT 2 TRM / LOES-7 EFFECTIVE DATE 04/25/2013
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 78 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.8 B.3.9 Page TRM / B 3.7-30 Pages TRM / B 3.7-30a and TRM / B 3.7-30b Page TRM / B 3.7-31 Page TRM / B 3.7-32 Page TRM / B 3.7-33 Page TRM / B 3.7-34 Page TRM / B 3.7-35 Pages TRM / B 3.7-36 and TRM / B 3.7-37 Page TRM / B 3.7-38 Page TRM / B 3.7-39 Page TRM / B 3.7-40 ELECTRICAL POWER BASES Page TRM / B 3.8-1 Pages TRM / B 3.8-2 and TRM / B 3.8-2 Page TRM / B 3.8-2a Pages TRM / B 3.8-3 and TRM / B 3.8-3a Page TRM / B 3.8-4 Page TRM / B 3.8-4a Page TRM / B 3.8-5 Pages TRM / B 3.8-6 through TRM / B 3.8-16 Page TRM / B 3.8-17 Page TRM / B 3.8-17a Page TRM / B 3.8-17b Pages TRM / B 3.8-18 through TRM / B 3.8-20 Pages TRM / B 3.8-21 through TRM / B 3.8-24 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 06/07/2007 10/05/2006 11/30/2011 03/09/2001 04/15/2003 12/03/2004 07/05/2000 04/01/2009 09/25/2009 04/01/2009 04/08/2010 04/02/2002 01/28/2005 03/01/2010 04/02/2002 04/02/2002 08/10/2004 08/31/1998 04/02/2002 11/30/2011 06/11/2012 11/30/2011 11/29/2006 05/28/2009 08/31/1998 10/23/1998 08/31/1998 03/27/2007 08/23/1999 08/31/1998 02/01/1999 04/07/2000 02/01/1999 12/03/2004 02/01/1999 08/31/1998 04/02/2002 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 Pages TRM / B 3.10-2 and TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Page TRM / B 3.11-10 Pages TRM / B 3.11-11 and TRM / B 3.11-1 la Pages TRM / B 3.11-12 and TRM / B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Pages TRM / B 3.11-20 and TRM / B 3.11-20a SUSQUEHANNA - UNIT 2 TRM / LOES-8 EFFECTIVE DATE 04/25/2013 SUSQUEHANNA - UNIT 2 TRM / LOES-8 EFFECTIVE DATE 04/25/2013
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 78 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date Page TRM / B 3.11-21 Pages TRM / B 3.11-22 and TRM / B 3.11-23 Page TRM / B 3.11-23a Pages TRM / B 3.11-24 and TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-27 Pages TRM / B 3.11-28 and TRM / B 3.11-29 Page TRM / B 3.11-30 Pages TRM / B 3.11-31 and TRM/ B 3.11-32 Page TRM / B 3.11-33 Pages TRM / B 3.11-34 and TRM / B 3.11-35 Page TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 Page TRM / B 3.12-2 Page TRM / B 3.12-3 05/13/2005 11/14/2006 05/13/2005 01/21/2004 08/31/1998 11/30/2005 06/30/2010 08/31/1998 06/30/2010 08/31/1998 02/12/1999 09/19/2007 11/29/2010 02/05/1999 TRM2 text LOES.doc 4123/2013 SUSQUEHANNA - UNIT 2 TRM / LOES-9 EFFECTIVE DATE 04/25/2013 40
Core Operating Limits Report (COLR) 3.2.1 PPL Rev. 10 3.2 Core Operating Limits Report (COLR) 3.2.1 Core Operating Limits Report (COLR)
TRO 3.2.1 APPLICABILITY:
The Core Operating Limits specified in the attached COLR shall be met.
Specified in the referenced Technical Specifications.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Core Operating Limits not A.1 Perform action(s)
Specified in referenced met.
described in referenced Technical Technical Specification.
Specifications.
TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY
...------------ NOTE N/A No associated Surveillances. Surveillances are implemented in the applicable Technical Specifications.
'1---...
SUSQUEHANNA - UNIT 2 TRM /13.2-1 EFFECTIVE DATE 08/31/1998
PPL Rev. 10 Licensing Document Page 11 of 72 Change Notice Number 5055 PL-NF-13-003 Rev. 0 '
Page 1 of 55 Susquehanna SES Unit 2 Cycle 17 CORE OPERATING LIMITS REPORT Nuclear Fuels Engineering APRIL 2013 P
SUSQUEHANNA UNIT 2 TRM/3.2-2 EFFECTIVE DATE 4/25/2013
PPL Rev. 10 Licensing Document Page 12 of 72 Change Notice Number 5055 PL-NF-13-003 Rev. 0 Page 2 of 55 CORE OPERATING LIMITS REPORT REVISION DESCRIPTION INDEX Rev.
Affected No. I Sections Description/Purpose of Revision 0
ALL Initial issuance of this COLR is in support of Unit 2 Cycle 17 operation.
FORM NFP-QA-008-2, Rev. 1 SUSQUEHANNA UNIT 2 TRM/3.2-3 EFFECTIVE DATE 4/25/2013
Licensing Document Page 13 of 72 Change Notice Number 6055 PPL Rev. 10 PL-NF-13-003 Rev. 0 Page 3 of 55 SUSQUEHANNA STEAM ELECTRIC STATION Unit 2 Cycle 17 CORE OPERATING LIMITS REPORT Table of Contents 1.0 INTRO DUCTIO N....................................................................................................
4 2.0 D EFIN ITIO NS....................................................................................................
5 3.0 SHUTDOW N MARG IN..........................................................................................
6 4.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR).................. 7 5.0 MINIMUM CRITICAL POWER RATIO (MCPR).......................................................
9 6.0 LINEAR HEAT GENERATION RATE (LHGR).......................................................
24 7.0 ROD BLOCK MONITOR (RBM) SETPOINTS AND OPERABILITY R EQ UIREM ENTS...................................................................................................
34 8.0 RECIRCULATION LOOPS - SINGLE LOOP OPERATION.....................................
36 9.0 POW ER I FLOW MAP..........................................................................................
51 10.0 O PRM SETPOINTS..............................................................................................
53 11.0 R EFE R E N C ES............................................................................................................
54 SUSQUEMANA UNIT 2 TRM/3.2-4 EFFECTIVE-DATE 4/25/2013
Licensing Document Page 14 of 72 Change Notice Number 5055 PPL Rev. 10 PL-NF-13-003 Rev. 0 Page 4 of 55
1.0 INTRODUCTION
This CORE OPERATING LIMITS REPORT for Susquehanna Unit 2 Cycle 17 is.
prepared in accordance with the requirements of Susquehanna Unit 2, Technical Specification 5.6.5. As required by Technical Specifications 5.6.5, core shutdown margin, the core operating limits, RBM setpoints, and OPRM setpoints presented herein were developed using NRC-approved methods and are established such that all applicable limits of the plant safety analysis are met.
SUSQUEHANNA UNIT 2 TRM,'/3.2-5 EFFECTIVE DATE 4/25/2013
Licensing Document Page 15 of 72 Change Notice Number 5055 PPL Rev. 10 PL-NF-1 3-003 Rev. 0 Page 5 of 55 2.0 DEFINITIONS Terms used in this COLR but not defined in Section 1.0 of the Technical Specifications or Section 1.1 of the Technical Requirements Manual are provided below.
2.1 The AVERAGE PLANAR EXPOSURE at a specified height shall be equal to the total energy produced per unit length at the specified height divided by the total initial weight of uranium per unit length at that height.
2.2 The PELLET EXPOSURE shall be equal to the total energy produced per unit length of fuel rod at the specified height divided by the total initial weight of uranium per unit length of that rod at that height.
2.3 FDLRX is the ratio of the maximum LHGR calculated by the core monitoring system for each fuel bundle divided by the LHGR limit for the applicable fuel bundle type.
2.4 LHGRFAC, is a multiplier applied to the LHGR limit when operating at less than 108 Mlbm/hr core flow. The LHGRFACf multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from core flows less than 108 Mlbm/hr.
2.5 LHGRFACp is a multiplier applied to the LHGR limit when operating at less than RATED THERMAL POWER. The LHGRFACp multiplier protects against both fuel centerline melting and cladding strain during anticipated system transients initiated from partial power conditions.
2.6 MFLCPR is the ratio of the applicable MCPR operating limit for the applicable fuel bundle type divided by the MCPR calculated by the core monitoring system for each fuel bundle.
2.7 MAPRAT is the ratio of the maximum APLHGR calculated by the core monitoring system for each fuel bundle divided by the APLGHR limit for the applicable fuel bundle type.
2.8 OPRM is the Oscillation Power Range Monitor. The Oscillation Power Range Monitor (OPRM) will reliably detect and suppress anticipated stability related power oscillations while providing a high degree of confidence that the MCPR safety limit is not violated.
2.9 Np is the OPRM setpoint for the number of consecutive confirmations of oscillation half-cycles that will be considered evidence of a stability related power oscillation.
2.10 Sp is the OPRM trip setpoint for the peak to average OPRM signal.
2.11 Fp is the core flow, in Mlbm / hr, below which the OPRM RPS trip is activated.
SUSQUEHANNA UNIT 2 TRM/3.2-6 EFFECTIVE DATE 4/25/2013
Licensing Document Page I6 of 72 Change Notice Number 5055 PPL Rev. 10 PL-NF-13-003 Rev. 0 Page 6 of 55 3.0 SHUTDOWN MARGIN 3.1 Technical Specification Reference Technical Specification 3.1.1 3.2 Description The SHUTDOWN MARGIN shall be equal to or greater than:
a) 0.38% Alk/k with the highest worth rod analytically determined OR b) 0.28% Ak/k with the highest worth rod determined by test Since core reactivity will vary during the cycle as a function of fuel depletion and poison burnup, Beginning of Cycle (BOC) SHUTDOWN MARGIN (SDM) tests must also account for changes in core reactivity during the cycle. Therefore, the SDM measured at BOC must be equal to or greater than the applicable requirement from either 3.2.a or 3.2.b plus an adder, "R". The adder, "R", is the difference between the calculated value of maximum core reactivity (that is, minimum SOM) (luring the operating cycle and the calculated BOC core reactivity. If the value of "R" is zero (that is, BOG is the most reactive point in the cycle) no correction to the BOC measured value is required.
The SHUTDOWN MARGIN limits provided in 3.2a and 3.2b are applicable in MODES 1, 2, 3, 4, and 5. This includes core shuffling.
SUSQUEHANNA UNIT 2 TRMI3.2-7 EFFECTIVE DATE 4/25/2013
PPL Rev. 10 Licensing Document Page 17 of 72 Change Notice Number 6055 PL-NF-13-003 Rev. 0 Page 7 of 55 4.0 AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) 4.1 Technical Specification Reference Technical Specification 3.2.1 4.2 Description The APLHGRs for ATRIUMTM-10 fuel shall not exceed the limit shown in Figure 4.2-1.
The APLHGR limits in Figure 4.2-1 are valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Two Loop operation. The APLHGR limits for Single Loop operation are provided in Section 8.0.
SUSQUEHANNA UNIT 2 TP, /3.2-8 EFFECTIVE DATE 4/25/2013
CA a
C=
SSES UNIT 2 CYCLE 17 16.0 14.0 m
N)
CA) 12.0 S10.0 (D~
6 8.0 C,
-C CD 0
0-ý11-01g' 6.0 4.0 0
10000 20000 30000 40000 50000 6.0000 Average Planar Exposure (MWDIMTU)
AVERAGE PLANAR LINEAR HEAT GENERATION RATE LIMIT VERSUS AVERAGE PLANAR EXPOSURETWO LOOP OPERATION ATRIUMTm-10 FUEL FIGURE 4.2-1.
70000
Licensing Document Page 19 of 72 Change Notice Number 6055 PPL Rev. 10 PL-NF-13-003 Rev. 0 Page 9 of 55 5.0 MINIMUM CRITICAL POWER RATIO (MOPRI 5.1 Technical Specification Reference Technical Specification 3.2.2, 3.3.4.1, 3.7.6, and 3.7.8 5.2 Description The MCPR limit is specified as a function of core power, core flow, average scram insertion time per Section 5.3 and plant equipment operability status. The MCPR limits for all fuel types (ATRIUMTM-10) shall be the greater of the Flow-Dependent or the Power-Dependent MCPR, depending on the applicable equipment operability status.
a)
Main Turbine Bypass / EOC-RPT / Backup Pressure Regulator Operable Figure 5.2-1: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-2: Power-Dependent MCPR value determined from BOC to EOC b)
Main Turbine Bypass Inoperable Figure 5.2-3: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-4: Power-Dependent MCPR value determined from BOC to EOC c)
EOC-RPT Inoperable Figure 5.2-5: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-6: Power-Dependent MCPR value determined from BOC to EOC d)
Backup Pressure Regulator Inoperable Figure 5.2-7: Flow-Dependent MCPR value determined from BOC to EOC Figure 5.2-8: Power Dependent MCPR value determined from BOC to EOC The MCPR limits in Figures 5.2-1 through 5.2-8 are valid for Two Loop operation.
The MCPR limits for Single Loop operation are provided in Section 8.0.
SUSQUEHANNA UNIT 2 TRM/3.2-10 EFFECTIVE DATE 4/25/2013
Licensing Document Page 20 of 72 Change Notice Number 5055 PPL Rev. 10 PL-NF-13-003 Rev. 0 Page 10 of 55 5.3 Average Scram Time Fraction If the average measured scram times are greater than the Realistic Scram times listed in Table 5.3-1 then the MCPR operating limits corresponding to the Maximum Allowable Average Scram Insertion Time must be implemented.
Determining MCPR operating limits based on interpolation between scram Insertion times is not permitted. The evaluation of scram insertion time data, as it relates to the attached table should be performed per Reactor Engineering procedures.
SUSQUEHANNA UNIT 2 TRM/3.2-*11 EFFECTIVE DATE 4/25/2013
PPL Rev. 10 Licensing Document Page 21 of 72 Change Notice Number 5055 PL-NF-13-003 Rev. 0 Page 11 of 55 Main Turbine Bypass / EOC-RPT I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 2 TRM/3.2-12 EFFECTIVE DATE 4/25/2013
E SSES UNIT 2 CYCLE 17 0
NI) 2.2 2.1 2.0 1.9 CA) 1.8 0,*-
w 1.7, 0
D..
o 1.6 m
m m
N)
C.0 1.5 1.4 1.3 1.2 ED C) 40 0-(Df
- 0)
CD CA 0>01-on 30 40 50 60 70 80 90 100 Total Core Flow (MLB/HR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS / EOC-RPTI BACKUP PRESSURE REGULATOR OPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-1 110
CA CCA m
C
-4 SSES UNIT 2 CYCLE 17 3.6 4-.
-i 0.
0o-U, m
4C-)
Na cr C-0 E-(20-S C,
CD z -
0 T
01 01 20 30 40 50 60 70 80 90 Core Power (% RATED)
MCPR OPERATING LIMLT VERSUS CORE POWER MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-2 100
PPL Rev. 10 Licensing Document Page 24 of 72 Change Notice Number 5055 PL-NF-13-003 Rev. 0 Page 14 of 55 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT 2 TRM/3.2-15 EFFECTIVE DATE 4/25/2013
L/)
SSES UNIT 2 CYCLE 17 N,
0~~
- 3 00,,
0 U=
2.2 2.1 2.0 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1.2 LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 30,~~~~~ 1.79 1.3.5__
RF~ERENCE: T.S. 3.7.6 and 3.2.2 m
>-I m
ý-v N,
N)
C:)
(D
<3 CD 0
0-ft (0ý
-3.
0 1
30 40 50 60 70 80 9
Total Core Flow (MLBJHR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS INOPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-3
'0 100 110
L/)
L/)
SSES UNIT 2 CYCLE 17 3.6 3.4 3.2 3.0 2.8 E
-j 2.6 01 CD 2.4 C.
0 IL2.2 2.0 1.8
-n I-C.)
-0 CDC 0) 0 CA 6
-n C) oy aa 1.6 1.4 1.2 20 30 40 50 60 70 Core Power (% RATED)
MCPR OPERATING LIMIT VERSUS CORE POWER MAIN TURBINE BYPASS INOPERABLE TWO LOOP OPERATION (BOC to EOC)
FIGURE 5.2-4 80 90 100
PPL Rev. 10 Licensing Document Page 27 of 72 Change Notice Number 5055 PL-NF-13-003 Rev. 0 Page 17 of 55 EOC-RPT Inoperable SUSQUEHANNA UNIT 2 TRM/3.2-18 EFFECTIVE DATE 4/25/2013
C,)
SSES UNIT 2 CYCLE 17 a,
I 0.
0 0.0 2.2 2.1 2.0 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1.2
_____I_____
Ii LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME I
+
SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3,7.6.2 T
i" 4
4.
USED IN DETERMINING MFLCPR F-CD "0
A
REFERENCE:
T.S. 3.3.4.1 and 3.2.2 F1 F
8
-pn K1 Ln r'3 30 40 50 60 70 80 9
Total Core Flow (MLB/HR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW EOC-RPT INOPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-5
- 0 100 110 co <
(D
=-
-j
-n"
(A2 m
ND SSES UNIT 2CYCLE 17 3.6 N)
E 0j 0~
a.,
m
~1~
m C-)
-H m
-Im N)
U, N)
-0
-D CD CD c0 uu (D
cnCDI (0
(I,0 1.2 20 30 40 50 60 70 Core Power (% RATED)
MCPR OPERATING LIMIT VERSUS CORE POWER EOC-RPT INOPERABLE TWO LOOP OPERATION (BOC to EOC)
FIGURE 5.2-6 80 90 100
PPL Rev. 10 Licensing Document Page 30 of 72 Change Notice Number 5055 PL-NF-13-003 Rev. 0 Page 20 of 55 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 2 TRM/3.2-21
.EFFECTIVE DATE 4/25/2013
O m
SSES UNIT 2 CYCLE 17 a.E 0.
C.,
w-IL 2.2 2.1 2.0 1.9 1.8 1.7 1.6 1.6 1.4 1.3 1.2 CD C--
m m1 m
m N-)
NJ CD I.-
30 40 50 60 70 80 so 100 Total Core Flow (MLB/HR) 110 (0 <0 3CD 0
ftf I-en0 on -4 cft "
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE TWO LOOP OPERATION (BOC TO EOC)
FIGURE 5.2-7
C=.
N)
SSES UNIT 2 CYCLE 17 3.6 0
a.
C.)
C-CD m
m C-3 P1 t=
N)
C,,
1'0 0, 1.3 5 E-0-
0 cc, N)0 c')
20 30 40 50 60 70 80 90 Core Power (% RATED) 100 MCPR OPERATING LIMIT VERSUS CORE POWER BACKUP PRESSURE REGULATOR INOPERABLE TWO LOOP OPERATION (BOC to EOC)
FIGURE 5.2-8
PPL Rev. 10 Licensfng Document Page 33 of 72 Change Notice Number 5065 PL-NF-1 3-003 Rev. 0 Page 23 of 55 Table 5.3-1 Average Scram Time Fraction Table For Use With Scram Time Dependent MCPR Operating Limits Control Rod Average Scram Time to Position (seconds)
Position 46 0.470 0.520 39 0.630 0.860 25 1.500 1.910 5
2.700 3.440 Average Scram Realistic Maximum Insertion Time Altowable SUSQUEHANNA UNIT*2 TRM/3.2-24 EFFECTIVE DATE 4/25/2013
Licensing Document Page 34 of 72 Change Notice Number 5055 PPL Rev. 10 PL-NF-13-003 Rev. 0 Page 24 of 55 6.0 LINEAR HEAT GENERATION RATE (LHGR) 6.1 Technical Specification Reference Technical Specification 3.2.3 and 3.7.6 6.2 Description The maximum LHGR for ATRIUMTM-t0 fuel shall not exceed the LHGR limit determined from Figure 6.2-1. The LHGR limit in Figure 6.2-1 is valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
To protect against both fuel centerline melting and cladding strain during anticipated system transients initiated from reduced power and flow conditions, power and flow dependent LHGR limit multipliers are provided.
The flow dependent LHGR limit multiplier figures are applicable to EOC-RPT Operable and Inoperable and. Backup Pressure Regulator Operable and Inoperable:
a)
Flow Dependent Main Turbine Bypass Operable Figure 6.2-2: Flow-Dependent LHGR Limit Multiplier b)
Flow Dependent Main Turbine Bypass Inoperable Figure 6.2-4: Flow-Dependent LHGR Limit Multiplier The power dependent LHGR limit multiplier figures are applicable to:
a)
Power Dependent Main Turbine Bypass and EOC-RPT, and Backup Pressure Regulator Operable Figure 6.2-3: Power-Dependent LHGR Limit Multiplier b)
Power Dependent Main Turbine Bypass or EOC-RPF or Backup Pressure Regulator Inoperable Figure 6.2-5: Power-Dependent LHGR Limit Multiplier The LGHR limit and LHGR limit multipliers in Figures 6.2-1 through 6.2-5 are valid for both Two Loop and Single Loop operation.
SUSQUEHANNA UNIT 2 TRM/3.2-25 EFFECTIVE DATE 4/25/2013
m N-
-H CA) a' 0
C I-a 16.0 14.0 12.0 10.0 8.0 6.0 SSES UNIT 2 CYCLE 17 1 1 1 1 I
S I
I I I i
I I
,I
.1 I
- I I
I I
i I I
5 II I
I I
II l
I I
I U
I UI4 i
l l
I l
~
l I U l
2 I
I I
I I;
I I
I 1
I i
li..
I.I I
I l t I
£ I
1:
- l I
II I S I
IiI I
I I
I
$Il I
7 I
I S I I
I I
I I
I I
I I
I
£ I
I1 1
1 11I I
S I
£
£ I
I I
I B
i l
I I
- l
- l*
I I
I I
1 I I I
I ~
I I
I I
I I
I I
I
£ 1 5 1
1 1
1 1S H
'11 1
1 1I l
I I
I I
I I
- --I--4--4-118900,13._....
1V11rht+
4 II 0.0,13
- 18900,
.4 t
REFERENCE:
T.S. 3.2.3 l
I
.11" Is ai i
=
,~
I I
I I
I I[
i~
l l
V l
l l
11.1 I
- II 11 11 tjw:
USEO IN DETERMINING FDLRX-I.
I,
I l I
I
, I I
I a,
I I
I I
III I*
S I
IlI I
I I
I I
I I
I I
- I t I
I I
SIl lI Il l
I jill::11:11111.:11111::ll lll l
lIl
-fI I
I I-.
II I-,
I 1I UI I
I II
-,l l
I l
~
l I
i I
l I
I U I Il
, I I.
l l
l I
I I
l l
I I
I I
l I
IiIiI I Il i
l l
l i
l I
I I
I III I
li i
i' s
ll llIIIIl l
l l
l I I I
I L
I I
I I l I
I I
I I
I I
~
l 1
1 1
- /
IIII I I I
I2l l
Il I
I 1
1 I
IIII I
~
l l
l~
I I
II I
l l
l U
I IlII I
I I
I I
I II I
j I
I I
l l
i l
l l
l l
l l
lI 1
1II I
l l
I I
I I
I I
II II lII I
I I
lI lI I
I I
I 1
I III I
I
,', i !
J 1-.
r" x;[
CD t-Im
-rl I-I-4-I rP UJ N)
C:)
4.0 r"
0 CD N) 0 Tc o*
("
ML-c wo'-.
0 14.
0 10000 20000 30000 40000 50000 Pellet Exposure (MWD/MTU) 60000 70000 80000 LINEAR HEAT GENERATION RATE LIMIT VERSUS PELLET EXPOSURE ATRIUMTM-i0 FUEL FIGURE 6.2-1
PPL Rev. 10 Licensing Document Page 36 of 72 Change Notice Number 5055 PL-NF-13-003 Rev. 0 Page 26 of 55 Flow Dependent Main Turbine Bypass Operable SUSQUEHANNA UNIT 2 TRM/3.2-27 EFFECTIVE DATE 4/25/2013
0 L/)
C=
SSES UNIT 2 CYCLE 17 1.10 1.00 0.90
-0 CL 4)
.2 LL 0.80 0.70 0.60 0.50 m
m
-4 N) 0,c co)
(D 0
c 6D n 0~
C,5 0
-4 4At 0.40 0.30 70 Total Core Flow (MLB/hr)
FLOW DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS OPERABLE ATRIUMr-10 FUEL FIGURE 6.2-2
PPL Rev. 10 Licensing Document Page 38 of 72 Change Notice Number 5055 PL-NF-1 3-003 Rev. 0 Page 28 of 55 Flow Dependent Main Turbine Bypass Inoperable SUSQUEHANNA UNIT 2 TRM/3.2-29 EFFECTIVE DATE 4/25/2013
m N.)
SSES UNIT 2 CYCLE 17 W
1~
.5.
C,
-J 0
- 0 0CD.
00 0
1.10 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 4-1 N)
Ln I4 N) w' CD to0 to0 a -3 (m<
0 a0 D~CD J C)
C 0 t a Z cmt 30 70 80 Total Core Flow (MLB/HR) 110 FLOW DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS INOPERABLE ATRIUMTr-10 FUEL FIGURE 6.2-4
PPL Rev. 10 Licensing Document Page 40 of 72 Cbange Notice Number 6055 PL-NF-13-003 Rev. 0 Page 30 of 55 Power Dependent Main Turbine Bypass and EOC-RPT and Backup Pressure Regulator Operable SUSQUEHANNA UNIT 2 TRM/3.2-31 EFFECTIVE DATE 4/25/2013
CAI C=
m SSES UNIT 2 CYCLE 17 1.10 L-.
No 0
0.
m m1 m
4-)
ml cn 0'a CD 0>-
a -o c0 t-20 30 40 50 60 70 80 90 100 Core Power (% RATED)
POWER DEPENDENT LHGR LIMIT MULTIPUER MAIN TURBINE BYPASS AND EOC-RPT AND BACKUP PRESSURE REGULATOR OPERABLE ATR1UMTN-10 FUEL FIGURE 6.2-3
PPL Rev. 10 Licensing Document Page 42 of 72 Change Notice Number 6055 PL-NF-13-003 Rev. 0 Page 32 of 55 Power Dependent Main Turbine Bypass or EOC-RPT or Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 2 TP, /3.2-33 EFFECTIVE DATE 4/25/2013
C/)
SSES UNIT 2 CYCLE 17 I..
4,.5.
I
-J a)
Ca) a.
d)a a,
~11 0
-TI C-CD 0
cn0 c.
0- P 20 30 40 50 60 70 80 90 100 Core Power (% RATED)
POWER DEPENDENT LHGR LIMIT MULTIPLIER MAIN TURBINE BYPASS OR EOC-RPT OR BACKUP PRESSURE REGULATOR INOPERABLE ATRIUMTM-10 FUEL FIGURE 6.2-5
Licensing Document Page 44 of 72 Change Notice Number 5055 PPL Rev. 10 PL-NF-13-003 Rev. 0 Page 34 of 55 7.0 ROD BLOCK MONITOR (RBM) SETPOINTS AND OPERABILITY REQUIREMENTS 7.1 Technical Specification Reference Technical Specification 3.3:2.1 7.2 Description The RBM Allowable Value and Trip Setpoints for; a)
Low Power Range Setpoint, b)
Intermediate Power Range Setpoint, c)
High Power Range Setpoint, e)
Low Power Range - Upscale, f)
Intermediate Power Range - Upscale, and g)
High Power Range - Upscale shall be established as specified in Table 7.2-1. The RBM setpoints are valid for Two Loop and Single Loop Operation, Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
The RBM system design objective is to block erroneous control rod withdrawal initiated by the operator before fuel design limits are violated. If the full withdrawal of any control rod would not violate a fuel design limit, then the RBM system is not required to be operable. Table 7.2-2 provides RBM system operability requirements to ensure that fuel design limits are not violated.
SUSQUEHANNA UNIT 2 TRM/3.2-35 EFFECTIVE DATE 4/25/2013
PPL Rev. 10 Licensing Document Page 45 of 72 Change Notice Number 5055 PL-NF-13-003 Rev. 0 Page 35 of 55 Table 7.2-1 RBM Setpoints Allowable Nominal Trip Function Value(')
Setpoint Low Power Range Setpoint 28.0 24.9 Intermediate Power Range Setpoint 63.0 61.0 High Power Range Setpoint 83.0 81.0 Low Power Range - Upscale 123.4 123.0 Intermediate Power Range - Upscale 117.4 117.0 High Power Range - Upscale 107.16 107.2 (1) Power setpoint function (Low, Intermediate, and High Power Range Setpoints) determined in percent of rated thermal power. Upscale trip setpoint function (Low, Intermediate, and High Power Range - Upscale) determined in percent of reference level.
Table 7.2-2 RBM System Operability Requirements Thermal Power MCPR (2.3)
(% of Rated)
> 28 and < 90
< 1.76
>90 and < 95
< 1.47
> 95.
< 1.68 (2)
Applicable to Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable.
(3)
Applicable to both Two Loop and Single Loop Operation.
SUSQUEHANNA UNIT 2 TP, /3.2-36 EFFECTIVE DATE 4/25/2013
Licensing Document Page 46 of 72 Change Notice Number 5055 PPL Rev. 10 PL-NF-13-003 Rev. 0 Page 36 of 55 8.0 RECIRCULATION LOOPS - SINGLE LOOP OPERATION 8.1 Technical Specification Reference Technical Specification 3.2.1, 3.2.2, 3.2.3, 3.3,4.1, 3.4.1, 3.7.6, and 3.7.8 8.2 Description APLHGR The APLHGR limit for ATRIUMTM-10 fuel shall be equal to the APLHGR Limit from Figure 8.2-1.
The APLHGR limits in Figure 8.2-1 are valid for Main Turbine Bypass Operable and Inoperable, EOC-RPT Operable and Inoperable, and Backup Pressure Regulator Operable and Inoperable in Single Loop operation.
Minimum Critical Power Ratio Limit The MCPR limit is specified as a function of core power, core flow, and plant equipment operability status. The MCPR limits for all fuel types (ATRIUMTM-10) shall be the greater of the Flow-Dependent or the Power-Dependent MCPR, depending on the applicable equipment operability status.
a)
Main Turbine Bypass I EOC-RPT / Backup Pressure Regulator Operable Figure 8.2-2: Flow-Dependent MCPR value determined from BOG to EOC Figure 8.2-3: Power-Dependent MCPR value determined from BOG to EOC b)
Main Turbine Bypass Inoperable Figure 8.2-4: Flow-Dependent MCPR value determined from BOG to EOC Figure 8.2-5: Power-Dependent MCPR value determined from BOG to EOC c)
EOC-RPT Inoperable Figure 8.2-6: Flow-Dependent MCPR value determined from BOG to EOC Figure 8.2-7: Power-Dependent MCPR value determined from BOG to EOC d)
Backup Pressure Regulator Inoperable Figure 8.2-8: Flow-Dependent MCPR value determined from BOG to EOC Figure 8.2-9: Power-Dependent MCPR value determined from BOC to EOC SUSQUEHANNA UNIT 2 TRM/3.2-37 EFFECTIVE DATE 4/25/2013
Licensing Document Page 47 of 72 Change Notice Number 6055 PPL Rev. 10 PL-NF-13-003 Rev. 0 Page 37 of 55 The MCPR limits in Figures 8.2-2 through 8.2-9 are valid only for Single Loop operation.
Linear Heat Generation Rate Limit The LHGR limits for Single Loop Operation are defined in Section 6.0.
RBM Setpoints and Operability Requirements The RBM setpoints and operability requirements for Single Loop Operation are defined in Section 7.0.
SUSQUEHANNA UNIT 2 TRM/3.2-38 EFFECTIVE DATE 4/25/2013
GO a:
16.0 14.0 C.0 12.0 r-J, mr 1 1.0 (D
<8.
- c:
~.0 SSES UNIT 2 CYCLE 17 l
l I.1 I
I a
i a a
a I l
i P
l ltl l
l l1 0 0 0 1 0 0
1,l i
I i
i
- l.
Il l.i l.l.
I I
I I
I a
Jil~
a a
a I l
I I f
01 14 1a l
a a RE ER NC T.S.
a.4 S
ad
- 3..
I a
a a
a a
I I
a a
III I
I It I
I I
aI II I
I a
a a
I IIll l
I 4..J I : I I 1I I
JU SED IN DETERMININGMAPRT ]
1iII I1 l
a 4
F I
I F I 4 f t
4 I I
1 1
+ 1 I a
I a
I Ii I
Iu I
lI aI IIaI II
- f II I-
- F~~~~~~--------------*-------f---------f
-1.-
I*
aI*
la, 1
11 oo 1,1°.11Ia I
a I
I-"
0 rn m
C-)
m C>
6.0 4.0 (DC,
- 0) cc cc,
(D Go S~T.
6i
- a.
C o-j 0.0 10000.0 20000.0 30000.0 40000.0 50000.0 Average Planar Exposure (MWD/MTU) 60000.0 70000.0 AVERAGE PLANAR UNEAR HEAT GENERATION RATE LIMIT VERSUS AVERAGE PLANAR EXPOSURE SINGLE LOOP OPERATION ATRIUMTM-10 FUEL
. FIGURE 8.2-1
PPL Rev. 10 Licensing Document Page 49 of 72 Change Notice Number 6066 PL-NF-13-003 Rev. 0 Page 39 of 55 Main Turbine Bypass / EOC-RPT I Backup Pressure Regulator Operable SUSQUEHANNA UNIT 2 TPJM,/3.2-40 EFFECTIVE DATE 4/25/2013
U) m N,
SSES UNIT 2 CYCLE 17 3.6 3.4 3.2 3.0
('3 N,
2.8 2.6 o
2.4 2-C.)
2.2
-U T
CD 0
m C-3 2.0 118 1.6 1.4
=0-CD c, z
c:
CD 'z~-
Iw oh 30 40 50 60 70 80 90 100 Total Core Flow (MLBIHR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-2 110
9 (A-SSES UNIT 2 CYCLE 17 4.6 4.4 4.2 4.0 3.8 3.6 23, 3 3.4 3.2 3.0 2.8 r\\3 n
m C--)
m
-1 Q,,
I.n C.
0 WIL EGEND CURVE A-MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME CURVE C: CORE POWER < 26% AND CORE FLOW *50 MLBMIHR
.5.......
A O
,0.
1, SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES c"=
3.33ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR 126.01, 2.32
-0 2.6 2.4 2.2 2.0 1.8 1.6 1.4 i
1402.
i
- Fý
+
I.
- i100,
.901 1-__
REFERENCE:
T.S. 3.4.1 and 3.2.2L......
~
~~I..
cb COO m, cD r -
ol W
c CY 0ý CAI W cn
-4 c"
"~f 20 30 40 so 60 70 80 90 Core Power (% RATED)
MCPR OPERATING LIMIT VERSUS CORE POWER MAIN TURBINE BYPASS I EOC-RPT I BACKUP PRESSURE REGULATOR OPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-3 100
PPL Rev. 10 LicensIng Document Page 52 of 72 Change Notice Number 5055 PL-NF-13-003 Rev. 0 Page 42 of 55 Main Turbine Bypass Inoperable SUSQUEHANNA UNIT 2 TRM/3.2-43 EFFECTIVE DATE 4/25/2013
V)
-4:=
E fl 0
4.2 4.0 3.8 3.6 3.4 3.2 3.0 2.8 2.6 2.4 2.2 2.0 1.8 1.6 1.4 SSES UNIT 2 CYCLE 17 I
I Iif
_LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME SAFETY ANALYSES ASSUME THAT TWO OR MORE BYPASS VALVES ARE INOPERABLE PER SR 3.7.6.1 OR 3.7.6.2 USED IN DETERMINING MFLCPR
_REFERENCE T.S. 3.4._
, 3.7.6, a _d _._.2.
1_8_
m m
t-4 N) cn CD 10-o -b 01 0(A ),a 30 40 s0 60 70 80 C
Total Core Flow (MLBIHR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW MAIN TURBINE BYPASS INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-4 I0 100 11.0
N)
SSES UNIT 2 CYCLE 17 4.2 NO 1.'
4E CJ a,.
0 W-m CA),
-0 CD 0
CD
-0 n
0-
-A-So C:)
20 30 40 50 60
) 70 80 90 100 Core Power (% RATED)
MCPR OPERATING LIMIT VERSUS CORE POWER MAJN TURBINE BYPASS INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-5
PPL Rev. 10 Licensing Document Page 55 of 72 Change Notice Number 5055 PL-NF-1 3-003 Rev. 0 Page 45 of 55 EOC-RPT Inoperable SUSQUEHANNA UNIT 2 TRM/3,2-46 EFFECTIVE DATE 4/25/2013
C=,
-4 E
a.
m 0
a-C-)
4.0 3.8 3.6 3.4 3.2 3.0 2.8 2.6 2.4 2.2 2.0 1.8 1.6 1.4 SSES UNIT 2 CYCLE 17 I
I I
LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM
_ INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR A
REFERENCE:
T.S. 3.4.1, 3.3.4.1, and 3.2.2 T_
rrl m
Na
-0 CD 10 cD C,-I CA c) cD -J 01)h 30 40 50 60 70 80 90 Total Core Flow (MLBIHR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW EOC-RPT INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-6 100 110
blo)
- 1
-J SSES UNIT 2 CYCLE 17 4.6 4A4 4.2 4.0 3.8 04 E
CL 0.
=.,
m 3.6
- E23, 3.4 3.2 3.0 2.8 2.6 2.4 2.2 2.0 1.i LEGEND CURVE A: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME CURVE B: REALISTIC AVERAGE SCRAM INSERTION TIME
-CURVE C: CORE POWER < 26% AND CORE FLOW -, 50 MLBM/HR C
S63.3AFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 USED IN DETERMINING MFLCPR 26.01, 2.32
___________40 2.02 I-"
a, m
m~
m N-)
,I 111; 11:11, 1.99 ý-
t -~---~
1 A=
E;
- z:~.90
'I I
I ~
+
4
+
I I
- 3.
1, a
32 IRFR N E T.S.
I
_ t REFRE CE:... 3.4.1, 3.3.4.1, and 3.2.2 1.4 20 30 40 50 60 70 Core Power (% RATED) 80 90 100 m0 <
CD 0
cxi 0)1 c-0-
en
-n" MCPR OPERATING LIMIT VERSUS CORE POWER EOC-RPT INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-7
PPL Rev. 10 Licensing Document Page 58 of 72 Change Notice Number 5055 PL-NF-13-003 Rev, 0 Page 48 of 55 Backup Pressure Regulator Inoperable SUSQUEHANNA UNIT 2 TRMf/3.2-49 EFFECTIVE DATE 4/25/2013
ci, nil 2:
N)
SSES UNIT 2 CYCLE 17 4.0 3.8 3.6 3.4 3.2 I
I t
I~
k: MAXIMUM ALLOWABLE AVERAGE SCRAM INSERTION TIME 3: REALISTIC AVERAGE. SCRAM INSERTION TIME 4
4-SAFETY ANALYSES ASSUME THAT FOUR BYPASS VALVES ARE OPERABLE PER SR 3.7.6.1 AND 3.7.6.2 K
N)
E 3.0 zJ
=
2.8 10 0
2.6 0
S2.4 I
USED IN DETERMINING MFLCPR r
I I
-ri N)
Lq C.0 2.2 2.0 1.8 1.6 1.4 350. 1.980 A -
B BREFEREN 3.7.8, and 3.2.2 1108, IA8 I
I I
_ Iý (0 <
ICD 0 T co 0-c0 cm CD i
CA N~
30 40 50 60 70 80 90 100 110 Total Core Floyw (MLI_/HR)
MCPR OPERATING LIMIT VERSUS TOTAL CORE FLOW BACKUP PRESSURE REGULATOR INOPERABLE SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-8
V)
C=
7c-1 SSES UNIT 2 CYCLE 17 cn C-)
m 4:2 CD iN,
,..I W
c
,U C.,
0 Q-C-
CD 0
0-20 30 40 50 60 70 Core Power (% RATED)
MCPR OPERATING LIMIT VERSUS CORE POWER BACKUP PRESSURE REGULATOR INOPERABLE
.SINGLE LOOP OPERATION (BOC to EOC)
FIGURE 8.2-9 80 90 100
Licensing Document Page 61 of 72 Change Notice Number 5055 PPL Rev. 10 PL-NF-13-003 Rev. 0 Page 51 of 55 9.0 POWER / FLOW MAP 9.1 Technical Specification Reference Technical Specification 3.3.1.1 9.2 Description Monitor reactor conditions to maintain THERMAL POWER / core flow outside of Stability Regions I and ]1 of the Power ! Flow map, Figure 9.1.
If the OPRM Instrumentation is OPERABLE per TS 3.3.1.1, Region I of the Power I Flow map is considered an immediate exit region.
If the OPRM Instrumentation is inoperable per TS 3.3.1.1, Region I of the Power
/ Flow map is considered an immediate scram region.
Region II of the Power / Flow map is considered an immediate exit region regardless of the operability of the OPRM Instrumentation.
SUSQUEHANNA UNIT 2 TRM/3.2-52 EFFECTIVE DATE 4/25/2013
PPL Rev. 10 Licensing Document Page 62 of 72 Change Notice Number 5055 PL-NF-13-003 Rev. 0 Page 52 of 55 TI..
71-( --
17-N t
e-* ýLo Zv 0H ii'-O--.
-N-4'-'--I---M-EPIAI-- --
i--'
-i-
-,,--r.
"-j--,"t,1
,,: =,,,,,,:,
l-1.4-4 I F.........*
,t--k @g'a g.
22
--,-L-.-
..... 3'~.............-
4-.4..1 L I.
,-i.LIZ§Wt§.,,pz
- t.,iS:,.-
/
-+..:.4 4.! EM.N
-I
- ~~~~'*.LLv L
- 4.
--I-.*
I
+/- 1 t
-1 i
,-*-tX K---,L t
L.
, I a"',-
R~m RE k2
'+.....'...
'- i
-* /..i.-
I I
'4I,~~'ft.
,-.I 0tt-*+
H.--.
V T.1 I
_ _Ll.. _.L _.
- ....n.i_-.
+/- 4 4
-,_J 100%
hr I
I.I i.X-A.
i:Ro.lnnWA IIt HER¶ EOi,.zl
'~'-t 3 I,. f liFi 1
l$01 IYT s
PXT1INMW 6 AIR APY I-rT R 4M 44M~f ti
=
t7.M e
"i1. I i11<
?
- t~
t flir v t....Trrn 4
" T II-"'
4.lt
[ i tr.-i-i lIi
,-t-r1--t-t-[
i...,r.
...-- %..4-I 7.
1 ifi wji
- aIEIIA I"
i --
1"i--
.1...... A.
.... U U~'t
-f at an]"ill....
MNi i
1 fz 1t3 en;.
a.
I._ Huri r walon INU_
Lr] i:!ii.
t F'I
+/-4 1! IIIt I
i'-
t*u*h; lalfl{-
I-.*
-I-; I n
IIH
- t.
N,'
ft4
- i
' JXI i
\\1, 10 W.
FIVTEI NFAT W/
FZT-7-0 TiT iT
'r I H EEm0, H-ro Unit'iit tTat,'"
- 1 J[-..h--
1.'t 1`
t i.,
1 L_ Liii L_
T IZ JLh t4 70 I a
-4 1"---
".-.i
!i I I
4 Y'
I 0
! I l.. fl 34 1 l I
.-rl-ri i "
I i,
L JA F
J-1.1-1 1 1.
- i.
.1 t
"s *
- -h
- i....
aictb a
I I
II 1C.
3J 4
-IIIt1 75I 1
1"---T+/-1 1
L....L L
I I
I T-T-
4 0 t'
.1 VN'
- arr'inrr
-I 4l+/-IýbF -1'~~-44 AI mat 7Ti'fiV7uI
-/.1 rr 15U-.,
ne*.
J "$,
1 1'-,
, ]* *._Z
- I_;_L** Z * *_
Z.-.. -_ -iZ _--_'. --- **r*
1.
,[_"*
2"--T-I" ITT
,T
']r
-T'1T'W-T" rn*'?F:T
'7E17T.
T-
- t.
LL LLL'L 11Ci4'ILWJJXZ-----'I I I.
LLLLW L
+/- ~
1 1
I +/- iL_
I
" I
- I i
I I
I I
1 I I I
I IP I
I I
i I i t i I
1 I
1 1 M ll SI.
I I
1 i
I I I I fI 11 II I I I
i I!
IJTAý1 11IJ.1-1tlTY I TT-JT
~
flu fY 1.T1
-,1-i--2 "k'rIpl'--t+/-P
--I*-r/+-I~-r+--1 ITi.+F*,i V u-- -4..' I-.+-! -
I+- i-;-.----
+Ii C.
-r-r'.--,-i--
-- rr-rrfl--+/--"rfl-v-r-t-rrr,-1-r--r-r-r-rrrrt-i --r-r n
! I FLF[TTTTFFFF-.M-.
U 113 2W 30 49 6i i9 p
t 11 5V I'm inMW cure? Flour 16filwnfluf I n*
E
.__Ap..i__ % 13,
e*
....... $l..
1 !?_ _.._te J*_
4t
-M.
i n
6-,
Figure 9.1 SSES Unit 2 Cycle 17 Power I Flow Map OUEHANNA UNIT 2 TRM/3.2-53 EFFECTIVE DATE 4/25/2013 SUS SUS
PPL Rev. 10 Licensing Document Page 63 of 72 Change Notice Number 5055 PL-NF-13-003 Rev. 0 Page 53 of 55 10.0 OPRM SETPOINTS 10,1 Technical Specification Reference Technical Specification 3.3.1.1 10.2 Description Setpoints for the OPRM Instrumentation are established that will reliably detect and suppress anticipated stabilitj related power oscillations while providing a high degree of confidence that the MCPR Safety limit is not violated. The setpoints are described in Section 2.0 and are listed below:
SP 1.12
=
16 S
60 Mlbm / hr SUSQUEHANNA UNIT 2 TRM, /3.2-54 EFFECTIVE DATE 4/25/2013
Licensing Document Page64 of 72 Change Notice Number 5058 PPL Rev. 10 PL-NF-13-003 Rev. 0 Page 54 of 55
11.0 REFERENCES
11.1 The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
- 1. XN-NF-81-58(P)(A), Revision 2 and Supplements 1 and 2, "RODEX2 Fuel Rod Thermal-Mechanical Response Evaluation Model," Exxon Nuclear Company, March 1984.
- 2. EMF-2361(P)(A), Revision 0, "EXEM BWR-2000 ECCS Evaluation Model,"
Framatome ANP, May 2001.
- 3. EMF-2292(P)(A), Revision 0, "ATRIUMTM-10: Appendix.K Spray Heat Transfer Coefficients," Siemens Power Corporation, September 2000.
- 4. XN-NF-84-105(P)(A), Volume 1 and Volume 1 Supplements I and 2, "XCOBRA-T: A Computer Code for BWR Transient Thermal-Hydraulic Core Analysis," Exxon Nuclear Company, February 1987.
- 5. XN-NF-80-19(P)(A), Volume 1 and Supplements 1 and 2, "Exxon Nuclear Methodology for Boiling Water Reactors: Neutronic Methods for Design and Analysis," Exxon Nuclear Company, March 1983.
- 6. XN-NF-80-19(P)(A), Volumes 2, 2A, 28, and 2C "Exxon Nuclear Methodology for Boiling Water Reactors: EXEM BWR ECCS Evaluation Model," Exxon Nuclear Company, September 1982.
- 7. XN-NF-80-19(P)(A), Volume 3 Revision 2 "Exxon Nuclear Methodology for Boiling Water Reactors Thermex: Thermal Limits Methodology Summary Description," Exxon Nuclear Company, January 1987.
- 8. XN-NF-80-19(P)(A), Volume 4, Revision 1, "Exxon Nuclear Methodology for Boiling Water Reactors: Application of the ENC Methodology to BWR Reloads," Exxon Nuclear Company, June 1986.
- 9. XN-NF-85-67(P)(A), Revision 1, "Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel," Exxon Nuclear Company, Inc.,
September 1986.
- 10. ANF-524(P)(A), Revision 2 and Supplements 1 and 2, "Advanced Nuclear Fuels Corporation Critical Power Methodology for Boiling Water Reactors,"
November 1990.
- 11. NE-092-001A, Revision 1, "Licensing Topical Report for Power Uprate With Increased Core Flow," Pennsylvania Power & Light Company, December 1992 and NRC SER (November 30, 1993).
SUSQUEHANNA UNIT 2 TRMI3.2-55 EFFECTIVE DATE 4/25/2013
Llcensing Document Page 65 of 72 Change Notice Number 5055 PPL Rev. 10 PL-NF-13-003 Rev. 0 Page 55 of 55
- 12. ANF-89-98(P)(A) Revision I and Supplement 1, "Generic Mechanical Design Criteria for BWR Fuel Designs," Advanced Nuclear Fuels Corporation, May 1995.
- 13. EMF-2209(P)(A), Revision 3, "SPCB Critical Power Correlation," AREVA NP, September 2009.
- 14. EMF-85-74(P)(A), Revision 0, Supplement 1(P)(A) ani Supplement 2(P)(A),
"RODEX2A (BWR) Fuel Rod Thermal-Mechanical Evaluation Model,"
Siemens Power Corporation, February 1998.
- 15. EMF-2158(P)(A), Revision 0, "Siemens Power Corporation Methodology for Boiling Water Reactors: Evaluation and Validation of CASMO-4/Microburn-B2," Siemens Power Corporation, October 1999,
- 16. EMF-CC-074(P)(A), Volume 4, Revision 0, "BWR Stability Analysis -
Assessment of STAIF with Input from MlCROBURN-B2," Siemens Power Corporation, August 2000.
- 17. NEDO-32465-A, "BWROG Reactor Core Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications," August 1996.
- 18. ANF-913(P)(A), Volume I Revision 1 and Volume 1 Supplements 2, 3, and 4, "COTRANSA2: A Computer Program for Boiling Water Reactor Transient Analyses," Advanced Nuclear Fuels Corporation, August 1990.
- 19. ANF-1358(P)(A), Revision 3,."The Loss of Feedwater Heating Transient in Boiling Water Reactors," Framatome ANP, September 2005:
SUSQUEHANNA UNIT 2 TRM/3.2-56 EFFECTIVE DATE 4/25/2013
PPL Rev. I 3.4 3.4.6 TRO Reactor Recirculation Single Loop Operation (SLO) Flow Rate Restriction
.3.4.6 Reactor Coolant System (RCS)
Reactor Recirculation Single Loop Operation (SLO) Flow Rate Restriction 3.4.6 In single loop operation, establish operating Reactor Recirculation Loop Flow Rate to less than or equal to 54.0 MIbm/hr ICABILITY:
MODES 1 and 2 APPL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Requirements of the TRO A.1 Restore Reactor Recirculation 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> not met flow rate to within limits B.
Requirements of B.1 Place Reactor Mode Switch in Immediately Condition A not met Shutdown AND B.2 Restore Reactor Recirculation Immediately loop flow rate to within limits TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.4.6.1 Verify the operating loop flow rate is less than or Once every four hours equal to 54.0 MIbm/hr.
SUSQUEHANNA UNIT 2 TRM / 3.4-14 EFFECTIVE DATE 04/25/2013
PPL Rev. 1 Reactor Recirculation Single Loop Operation (SLO) Flow Rate Restriction B 3.4.6 B 3.4.6 Reactor Recirculation Single Loop Operation (SLO) Flow Rate -Restriction BASES TRO TRO 3.4.6 requires that the operating loop flow rate be maintained less than or equal to 54.0 Mlbm/hr during single loop operation. Single loop operation includes events that require a recirculation loop to be declared "not in operation" due to Technical Specification 3.4.1 Condition B. Note that the parameter of concern is the 3 minute average recirculation system loop flow (e.g., PICSY point NJF02B and NJF03B) not core flow. This-restriction avoids excessive vibration of jet pump components. Fatigue usage can be accumulated when loop flow rates are above 54 Mlbm/hr if large gaps are present. Excessive vibration can lead to cracking of the jet pump riser brace welds. The limitation contained in this TRO will provide nuclear safety assurance in that jet pump integrity will be maintained and thus the FSAR Chapter 15 analysis assumption of maintaining 2/3 core height will be met. Additionally, these measures will assure asset preservation and avoid lengthy repairs due to potential riser brace cracking.
The required action to place the reactor mode switch in shutdown will assure the flow rate is established within limits. The time frame of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> is required to avoid excessive vibrations that occur at higher loop flow rates and the subsequent impact on jet pump riser brace.
APPLICABILITY This Requirement is applicable whenever in reactor recirculation single loop operation in Modes 1 and 2. Single loop operation includes events that require a recirculation loop to be declared "not in operation" due to Technical Specification 3.4.1 Condition B.
ACTIONS The Actions assure excessive jet pump vibration can not occur when in single loop operation.
TRS The required surveillance assures that the maximum loop flow rate is not exceeded.
REFERENCES
- 1.
FSAR Section 15.6 SUSQUEHANNA - UNIT 2 TRM / B 3.4-7 EFFECTIVE DATE 04/25/2013