ML13105A109

From kanterella
Jump to navigation Jump to search
Notification of Inspection and Request for Information
ML13105A109
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/11/2013
From: Vias S
NRC/RGN-II/DRS/EB3
To: Madison D
Southern Nuclear Operating Co
References
Download: ML13105A109 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 11, 2013 Mr. Dennis R. Madison Vice President Southern Nuclear Operating Company, Inc.

Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Madison:

The NRC will perform the baseline heat sink (HS) inspection at your Edwin I. Hatch Nuclear Plant from May 13 - 17, 2013. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to facilitate the selection of inspection samples and ensure that the inspectors are adequately prepared. The second group (Section B of the enclosure) identifies additional information needed during the onsite inspection week for the selected inspection samples. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Sharon Beverly of your organization. Our inspection dates are subject to change based on your updated schedule of outage activities. If there are any questions about this inspection or the material requested, please contact the lead inspector Brendan Collins at (404) 997-4420 (Brendan.Collins@nrc.gov).

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system

D. Madison 2

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Steven J. Vias, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-321, 50-366 License No. DPR-57, NPF-5

Enclosure:

Pre-Inspection Document Request cc w/encl.: (See page 3)

xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE RA RA RA NAME COLLINS FLETCHER VIAS DATE 4/10/2013 4/ 11/2013 4/11/2013 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

D. Madison 3

cc:

C. Russ Dedrickson Fleet Support Supervisor Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution David R. Vineyard Plant Manager Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution S. Kuczynski Chairman, President and CEO Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Todd L. Youngblood Vice President Fleet Oversight Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Leigh Perry SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution D. G. Bost Chief Nuclear Officer Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution T. A. Lynch Vice President Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Dennis R. Madison Vice President Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution T. E. Tynan Site Vice President Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution C. R. Pierce Nuclear Licensing Director Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution B. D. McKinney, Jr.

Regulatory Response Manager Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution D. W. Daughhetee Licensing Engineer Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution T. D. Honeycutt Regulatory Response Supervisor Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Bradley J. Adams Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution N. J. Stringfellow Licensing Manager Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution L. P. Hill Licensing Supervisor Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution L. L. Crumpton Administrative Assistant, Sr.

Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution (cc contd - See page 4)

D. Madison 4

(cc contd)

Steven B. Tipps Hatch Principal Engineer - Licensing Edwin I. Hatch Nuclear Plant Electronic Mail Distribution W. E. Duvall Site Support Manager Edwin I. Hatch Nuclear Plant Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Edwin I. Hatch Nuclear Plant U.S. NRC 11030 Hatch Parkway N Baxley, GA 31513 Mr. Ken Rosanski Resident Manager Edwin I. Hatch Nuclear Plant Oglethorpe Power Corporation Electronic Mail Distribution Mark Williams Commissioner Georgia Department of Natural Resources Electronic Mail Distribution Jerry Ranalli Municipal Electric Authority of Georgia Power Electronic Mail Distribution Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution Arthur H. Domby, Esq.

Troutman Sanders Electronic Mail Distribution James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Chuck Mueller Manager Policy and Radiation Program Georgia Department of Natural Resources Electronic Mail Distribution Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Chairman Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201 Baxley, GA 31513 Amy Whaley Resident Manager Electronic Mail Distribution

Letter to Dennis R. Madison from Steven J. Vias dated April 11, 2013.

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION DISTRIBUTION:

RIDSNRRDIRS PUBLIC RidsNrrPMHatch Resource

Enclosure INSERVICE INSPECTION DOCUMENT REQUEST Inspection Dates:

May 13 - 17, 2013 Inspection Procedures:

IP 71111.07, Heat Sink Performance, Triennial Review Inspectors:

Brendan Collins, Reactor Inspector A.

Information Requested for the In-Office Preparation Week The following information should be sent to the Region II office in hard copy or electronic format (preferred), in care of Brendan Collins, by May 6, 2013 to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information provided for section A.1 below and then request additional documents needed during the onsite inspection week as discussed in section B.1 of this enclosure. We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. *Please provide requested documentation in electronic format if possible. If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as possible.

A.1 Heat Exchangers and Service Water Equipment a) List of heat exchangers and equipment cooled by service water (SW) directly or indirectly.

b) For the heat exchangers listed in item (a) above, provide the program documents that govern the performance monitoring of these heat exchangers including testing methods and frequency, inspection methods and frequency, maintenance, monitoring of biotic fouling and macro-fouling, and chemistry control, as applicable.

c) As applicable, provide a list of risk-significant components in the service water system and UHS with their respective risk ranking, including the heat exchangers listed for item (a) above.

d) List of risk-significant non-safety related functions supported by the service water system.

e) Response to NRC Generic Letter 89-13, including any regulatory commitments made to the NRC in response to this Generic Letter or other regulatory commitments associated with service water system and UHS performance.

f) Design Basis Documents associated with the SW system and the Ultimate Heat Sink (UHS). Please include a description of the UHS design for the site. Particularly whether the UHS is above ground encapsulated by embankments, weirs or excavated side slopes, underwater weir or excavation, forced draft cooling tower or spray pond.

2 Enclosure g) Latest version of the Final Safety Analysis Report chapters addressing SW system design.

h) Basic service water system flow diagrams.

i)

System Health Reports for the last three years associated with the SW system and systems that are cooled by SW.

j)

List of components or systems in Maintenance Rule a(1) status due to SW system interaction.

k) List of corrective action documents (with a brief description) in the last three years for SW related issues, including conditions adverse to quality that have received a Root Cause Analysis or an elevated severity level in the sites Corrective Action Program.

l)

Industry Operating Experience events in the last three years related to SW system that have been evaluated through the sites Operating Experience or Corrective Action Program.

m) List of applicable Codes and Industry Guidelines currently used for the performance monitoring of heat exchangers and UHS.

n) List of redundant or infrequently used heat exchangers o) Provide the program documents that govern the performance monitoring of the UHS and its subcomponents like piping, intake screens, pumps, and valves, including testing methods and frequency, inspection methods and frequency, maintenance, monitoring of fouling, and chemistry control, as applicable.

p) Provide flow diagrams indicating buried or inaccessible piping in the service water system and UHS.

q) Program documents governing the inspection, testing, and monitoring of buried piping in the service water system and UHS.

r) List of safety-related and non-safety related valve interfaces between safety-related service water and non-safety related or non-seismic piping systems.

s) List of design changes to the service water system and the UHS in the last three years.

t) As applicable, provide a list of historical through-wall leaks in service water piping for the last three years. Please include the location of the leak(s) and corrective actions taken.

u) Contact information for licensing and engineering staff supporting the inspection.

3 Enclosure B.

Information to be provided on-site to the inspector at the entrance meeting (May 13, 2013):

B.1 Heat Exchangers and Service Water Equipment The inspector will select a sample of heat exchangers and/or ultimate heat sink samples from the information provided for section A.1 above, as required by inspection procedure IP 71111.07, during in-office preparation. For the samples selected, the inspectors will request the items listed below, as applicable.

a) Updated list of technical and licensing point of contacts.

b) Copies of selected corrective action documents including supporting documents such as cause evaluations, corrective action plans, work orders, etc.

c) Copies of evaluations and associated corrective actions for selected Operating Experience Events.

d) For the selected heat exchangers or equipment cooled by service water (SW) directly or indirectly, provide documentation associated with:

Performance testing methodology and results for the last three years Inspection/cleaning methods and results of performance inspections for the last three years, including eddy current test inspections to determine the structural integrity of the heat exchanger. For eddy current testing results, please include eddy current examination reports, examiner qualification records, and associated corrective action documents.

Operating data demonstrating that the heat exchangers condition and operation is consistent with design assumptions in heat transfer calculations and as described in the UFSAR Periodic flow test results at/or near maximum design flow Engineering evaluations addressing heat exchanger susceptibility to water hammer and measures in place to address potential water hammer concerns Plant operating procedures showing the controls and operational limits in-place to prevent heat exchanger degradation due to excessive flow induced vibration during operation Current number of plugged tubes relative to the pre-established plugging limits in design calculations Results of chemistry control program for the last three years e) For selected above-ground UHS encapsulated by embankments, weirs or excavated side slopes, provide documentation for the last three years associated with:

Licensee or third party dam inspections for monitoring the integrity of the heat sink Monitoring results for verification of sufficient reservoir capacity f) For selected underwater UHS weirs or excavations, provide documentation for the last three years associated with:

4 Enclosure Results of visual or other inspections performed to check for any possible settlement or movement indicating loss of structural integrity and/or capacity, including sediment intrusion that may reduce capacity g) For selected UHS such as a forced draft cooling tower or spray pond, provide documentation for the last three years associated with the methods and results to verify:

Reservoir capacity Periodic monitoring and trending of sediment build-up Periodic performance monitoring of heat transfer capability Performance monitoring of the UHS structural integrity h) For selected operational samples of the service water system and UHS, provide documentation for the last three years associated with:

Selected design changes to the service water system and the UHS Licensee procedures for a loss of the service water system or UHS Licensee controls to prevent clogging due to macro-fouling through monitoring and trending Results of biocide treatments for biotic control For fixed volume UHS, provide results of chemistry monitoring to ensure adequate pH, calcium hardness, etc. are maintained Results of pump performance monitoring for potential strong-pump weak-pump interaction in the service water system i)

For selected performance testing samples of the service water system and UHS, provide documentation for the last three years associated with:

Performance tests, such as ASME inservice tests, of selected components Performance testing of isolation capabilities for interface valves between safety-related service water and non-safety related or non-seismic piping systems Service water flow balance test results Performance of selected risk significant non-safety related functions j)

Please have knowledgeable staff available during the onsite inspection to support walkdowns of selected plant structures, systems, and components associated with the service water system and UHS.

Inspector Contact Information:

Brendan Collins Reactor Inspector 404-997-4420 Brendan.Collins@nrc.gov Mailing Address:

US NRC Region 2 Attn: Brendan Collins Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303