Response to Request for Supplemental Information License Amendment Request: Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO
ML13093A012
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/01/2013
From: John Stanley
EDF Group, Calvert Cliffs, Constellation Energy Nuclear Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML13093A012 (2)


Text

Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 CENG.

a joint venture of Energy*

,,eDF CALVERT CLIFFS NUCLEAR POWER PLANT April 1, 2013 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

SUBJECT:

Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. 1 and 2; Docket Nos. 50-317 and 50-318 Response to Request for Supplemental Information re: License Amendment Request: Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO (a) Letter from M. D. Flaherty (CCNPP) to Document Control Desk (NRC),

dated January 28, 2013, License Amendment Request re: Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO

REFERENCES:

(b) Letter from B. K. Vaidya (NRC) to G. H. Gellrich (CCNPP), dated March 4, 2013, Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 - Unacceptable Acceptance Review with Opportunity to Supplement - License Amendment Request Regarding:

Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO (TAC Nos. MF0617 and MF0618)

In Reference (a), Calvert Cliffs Nuclear Power Plant, LLC submitted a request for a license amendment to the Renewed Operating Licenses for Calvert Cliffs Nuclear Power Plant (Calvert Cliffs) Units 1 and 2 to remove the second completion times from various Technical Specifications.

Reference (b) requested additional information regarding the requested amendment.

The requested information is provided below.

NRC Staff Reauest Describe the administrative controls that are referenced in Reference (a). Also include in your response when these administrative controls will be implemented.

Document Control Desk April 1, 2013 Page 2 CCNPP Response Calvert Cliffs has an action in our action item tracking program to revise Operations procedure NO-1-200, "Control of Shift Activities," to include a statement similar to the following: "Alternating between LCO Conditions, in order to allow indefinite continued operation while not meeting the LCO, is not allowed." This procedure will be revised prior to implementation of this Technical Specification change.

This response does not change the No Significant Hazards Consideration previously provided in Reference (a). There are no regulatory commitments contained in this letter.

Should you have questions regarding this matter, please contact Mr. Douglas E. Lauver at (410) 495-5219.

I declare under penalty of perjury that the foregoing is true and correct. Executed on April 1, 2013.

ery tr ly yours, Manager-Engineering Services JJS/PSF/bjd cc: